RFP#361279KMW - Neutron Detector Beam Loss Monitors v2
Closed Solicitation Posted
- Solicitation number
- RFP361279KMWv2
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 334516 Analytical Laboratory Instrument Manufacturing
- PSC
- AJ13 General Science & Technology R&D Svcs; General Science & Technology; Experimental Development
- Place of performance
- Illinois 60510, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Fermi National Accelerator Laboratory (Fermilab) is seeking proposals for Neutron Detector Beam Loss Monitors through RFP #361279, with the goal of procuring two prototype detectors and potential follow-on production runs of either 14 or 28 units. The solicitation targets manufacturers of analytical laboratory instruments under NAICS code 334516, with proposals being evaluated on a best-value trade-off basis where non-cost factors are significantly more important than price. Technical requirements include developing photomultiplier/scintillator-based moderated slow neutron detection systems with specific performance parameters such as neutron energy spectrum measurement between 1-5 MeV and a measurable flux range of ~102 to 107 neutrons/cm2/sec. Proposals must be submitted by February 12, 2025, at 4:00 PM CST, with vendor questions due by January 31, 2025. The technical proposal must address technical merit, delivery requirements, management control plan, and past performance, while the business/price proposal must include firm fixed pricing valid for 60 days.
The contract is an unrestricted procurement with no specific small business set-aside, to be performed under Department of Energy prime contract #89243024CSC000002. The place of performance will be Batavia, Illinois, at the Fermilab facility. Contractors are expected to meet a 5-month delivery timeline for prototypes and a 6-month timeline for potential production units, with production pricing required to remain firm for one year after prototype delivery. While specific contract value is not explicitly stated, the solicitation indicates a potential for up to 30 total detector units across prototype and production phases. The contract will require comprehensive testing documentation, certificates of conformance, and adherence to strict technical specifications involving neutron detection capabilities, dimensional constraints, and performance metrics. Successful vendors must also comply with various representations and certifications, including export control requirements and subcontracting plan guidelines.
Notice text
See the attached PDFs for details and specifications.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PIP-II CM 2K Pressure Safety Device - Rupture Disks | Fermi National Accelerator Laboratory | No set-aside | |
| Leica Absolute Tracker ATS800 and Accessories | Fermi National Accelerator Laboratory | No set-aside | |
| PIP-II CM 2K Reclosable Pressure Safety Relief Valves | Fermi National Accelerator Laboratory | No set-aside | |
| PIP-II booster gmps power supply girder trimming capacitors | Fermi National Accelerator Laboratory | No set-aside | |
| PIP-II Niobium Sheets, Rings, and Disks | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity