This Statement of Work (SOW) outlines requirements for designing and manufacturing Neutron Detector Beam Loss Monitors (NBLM) for Fermilab's PIP-II superconducting H- linear accelerator. The contractor must deliver two prototype detectors followed by potential production orders of either 14 or 28 units.
Key technical requirements include: photomultiplier/scintillator-based moderated slow neutron detection using 6Li(n,α) reaction and 6LiF × ZnS(Ag) scintillation material, neutron energy spectrum measurement between 1-5 MeV, response >0.05 nA/(neutrons/cm2/sec), measurable flux range of ~102 to 107 neutrons/cm2/sec, >90% x-ray attenuation for <300 keV, thermal neutron attenuation >1.6x104, and maximum dimensions of 7in x 7in x 18in. The SOW establishes a detailed schedule with hold points, including kickoff within 3 weeks of award, preliminary design review within 6 weeks after kickoff, and prototype delivery within 3 months of final design approval. Production pricing must remain firm for one year after prototype delivery. The contractor must provide comprehensive testing documentation and certificates of conformance/performance for both prototype and production units.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for the Design of the
Neutron Detector Beam Loss Monitor
Preparation Date: 10 November 2024
Date: 23 January 2025
Preparing Organization: AD/Instrumentation, Fermilab
Statement of Work
Fermi National Accelerator Laboratory 2
Document Approval
Signatures Required Date Approved
Originator: Randy Thurman-Keup 01/23/2025
Reviewer: Richard Prokop
Reviewer: Andrea Saewert
Approver: Vic Scarpine
Revision History
Revision Date of Release Description of Change
Draft 1 08/22/2022 Release of draft for RFP
Ver 1.0 08/25/2022 Release for RFP
Ver 1.1 03/14/2024 Modified for production order
Ver 1.2 07/24/2024 Modified several requirements
Ver 1.3 11/18/2024 Change production to include two options, 14 and 28 detectors
Ver 1.4 11/21/2024 Add procurement terminology. Add hold points table.
Ver 1.5 12/23/2025 Change FRA to FFDG
Fermi National Accelerator Laboratory 3
Table of Contents
1. INTRODUCTION
2. SCOPE
3. REQUIREMENTS
4. DOCUMENTATION REQUIRED FOR PROPOSAL
5. DESIGN REVIEWS
6. DELIVERY AND ACCEPTABILITY TESTING
APPENDIX A
A.1 ACRONYMS AND DEFINITIONS
Fermi National Accelerator Laboratory 4
1. INTRODUCTION
The Fermilab PIP-II superconducting H- linear accelerator will use neutron detectors to monitor beam losses along the accelerator. These detectors operate in a high-radiation environment between cryomodules.
2. SCOPE
This Statement of Work (SOW) covers the Neutron Detector Beam Loss Monitor (NBLM) to be designed and fabricated. The scope of this document is limited to the neutron detector including its housing and internal components. Cables, high voltage power supply and electronics are excluded from the scope.
In this specification the following key words (in bold text) will be used:
shall: Indicates a mandatory requirement. Designers shall implement such mandatory requirements to ensure interchangeability and to claim conformance with this specification.
Should: Indicates flexibility of choice with a strongly preferred implementation.
Note: When not in bold text, the words in the table above are being used in the traditional sense; that is, they do not adhere to the strict meanings described above.
3. REQUIREMENTS
Table 1 lists technical requirements for the NBLM. The supplier may request modifications to facilitate fabrication, decrease price, or improve performance. Any requested deviations shall be clearly indicated, discussed, and be subject to written approval by FFDG.
Table 1: Technical Requirements
Requirement # Requirement Statement
3_1 The detector shall be a photomultiplier/scintillator-based moderated slow neutron detector.
3_2 The neutron reaction shall be 6Li(n,α).
3_3 The scintillation material shall be 6LiF × ZnS(Ag).
3_4 The detector shall be able to measure a neutron energy spectrum with an average of between 1 and 5 MeV before the moderator.
3_5 The detector shall have a response to a neutron source such as 252Cf of >0.05 nA/(neutrons/cm2/sec).
Fermi National Accelerator Laboratory 5
Requirement # Requirement Statement
3_6 The detector shall have a measurable neutron flux range of ~102 to 107 neutrons/cm2/sec.
3_7 The detector shall have an x-ray attenuation rate (via Pb shield or similar) of >90% for x-rays < 300 keV.
3_8 The detector shall have a thermal neutron attenuation (via Cd layer or similar) of >1.6x104.
3_9 Detector response to 137Cs and 60Co gamma sources shall be < 0.4 nA/(mRad/hr).
3_10 The detector shall be a passive device, i.e. there shall be no onboard signal processing or high voltage generation.
3_11 The detector shall have an embedded LED for operational checks.
3_12 Required high voltage shall be less than 3000 V.
3_13 Current draw from high voltage shall be less than 200 μA.
3_14 High voltage shall be supplied externally via an SHV connector.
3_15 The signal shall be output via a BNC connector.
3_16 The LED signal shall be input via a BNC connector.
3_17 Overall dimensions of the detector shall not exceed 7in x 7in x 18in.
3_18 The PMT shall be magnetically shielded.
4. DOCUMENTATION REQUIRED FOR PROPOSAL
FFDG requests proposals for two (2) prototype neutron detectors and subsequent production units. The respondent shall provide pricing, production, and a delivery schedule for two (2) prototype detectors and pricing, production and a delivery schedule for 14 or 28 production detectors.
FFDG reserves the right to award subsequent purchases of neutron detectors without further competition and in a batch of 14 or 28, whatever is deemed to be in the best interest of FNAL.
Pricing provided with the solicitation response for the production batches shall remain firm/fixed for one
(1) year from the date of delivery of the prototypes.
The supplier shall plan, establish, implement, and adhere to a documented quality assurance program that fulfills all the requirements described in this SOW. In addition to the requirements of Section 3, the supplier may propose any internationally recognized design standard, subject to prior written approval by
FFDG. The supplier shall state their intended method of design including applicable codes as part of their proposal. FFDG reserves the right to disapprove the use of certain codes or standards if it is
Fermi National Accelerator Laboratory 6 considered that their application will not fulfill the technical specifications of this statement of work. Any information in the documentation that is considered proprietary should be marked as such. FFDG shall not release proprietary information to a third party without written permission from the supplier.
The proposal shall include the following:
1) Detailed information on all materials, including material properties.
2) A detailed quality assurance plan, including methods to be used to verify material properties, find defects and flaws, and other test procedures, and criteria for rejecting parts.
3) Examples of past projects (within the last five years) that closely match this scope in complexity and value, and that best illustrate the bidder’s capability, experience, and performance.
4) Examples of past experience building prototypes for FFDG.
5) A production schedule to deliver 2 prototypes.
a. A production schedule for an additional 14 production detectors
b. A production schedule for an additional 28 production detectors
Table 2: Hold points schedule
Hold Point
Description When Required
Prototype Schedule
A Kick-off Meeting Within 3 weeks of contract award
B Preliminary Design Review Within 6 weeks of Hold Point A
C FFDG Evaluation of Preliminary Design Within 1 week of Hold Point B
D Final Design Review Within 4 weeks of Hold Point C
E Delivery of 2 Prototype Detectors Within 3 months of Hold Point D
F FFDG Evaluation of Prototype Detectors
Within 2 weeks of Hold Point E
Production Option Schedule
G Delivery of production order Within 6 months of execution of FFDG option
5. DESIGN REVIEWS
To ensure proper understanding of the specifications and of the design proposals the supplier and FFDG shall have the following program reviews:
Fermi National Accelerator Laboratory 7
1. Initial program kickoff meeting to review requirements and approach.
2. Preliminary Design Review to include:
a. Review of the design.
b. Review of the estimated delivery of initial prototypes, production detectors, and any schedule risks.
3. Final Design Review before production fabrication to include:
a. Review of final design incorporating any agreed-upon design changes.
b. Review of updated production delivery schedule and any schedule risks.
The Final Design Review is not needed if there are no significant changes after the Preliminary Design
Review.
6. DELIVERY AND ACCEPTABILITY TESTING
The supplier is required to procure, build, test, and deliver items per Section 3. All phases of fabrication shall be in accordance with the documents provided by the supplier and conform to the specifications in
Section 3 above. Any conflict or ambiguity in the document(s) shall be brought to the attention of the
FFDG procurement representative prior to any work being done or cost being incurred by FFDG.
For the 2 prototype detectors, the supplier shall provide a Certificate of Conformance that includes the following:
1) Sensitivity to neutrons with standard neutron sources in the energy range 0.025 eV – 11 MeV, such as 252Cf
2) Sensitivity of detector to 137Cs or 60Co gamma sources
3) Device equilibration (or “warm-up”) time for amplitude to be stable within ±10%
4) Amplitude stability over temperature range 10 – 40 °C
5) Plot of dark current over operational voltage range
6) Plot of detector response as a function of PMT voltage
7) Response of detector to calibration pulse of LED
For the production detectors, the supplier shall provide a Certificate of Performance that includes just measurements 1), 5) and 7).
Acceptance tests performed at FFDG will include:
1) Verification of dark current as a function of voltage.
2) Verification of detector response as a function of voltage up to maximum voltage using a standard radioactive source.
Fermi National Accelerator Laboratory 8
3) Verification of LED response.
Fermi National Accelerator Laboratory 9
APPENDIX A
A.1 ACRONYMS AND DEFINITIONS
FFDG Fermi Forward Discovery Group, LLC
FNAL Fermi National Accelerator Lab
NBLM Neutron Detector Beam Loss Monitor
PIP-II Proton Improvement Plan Phase 2
PMT Photomultiplier Tube
RFI Request For Information
RFP Request For Proposal
SOW Statement of Work