Reverse Osmosis Water System Maintenance

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
12445024Q0004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Stoneville, Mississippi, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service seeks a contractor to provide quarterly and yearly maintenance for three reverse osmosis water systems located at facilities in Stoneville, Mississippi. Maintenance includes replacing consumables, operational checks, and ensuring production of RO-quality water for the greenhouse systems and distilled water for the main lab system. The base period of performance is February 1, 2024 through January 31, 2025 with four optional yearly extensions. A site visit is scheduled for December 12, 2023.

The procurement is set aside for total small business and will result in a firm fixed price contract. Maintenance will be required for RO systems in a large greenhouse, small greenhouse, and main lab building. The solicitation number is 12445024Q0004 and notices indicate the contract value will be under $250,000 annually. Quarterly maintenance includes filter replacements and salt additions while yearly maintenance adds mixed bed exchanges. The deadline for questions is December 22, 2023.

Notice text

Site Visit Information

A formal sit visit is scheduled for Tuesday, December 12, 2023, at 10:00 a.m. 

Address: Southern Research Station, 432 Stoneville Road, Stoneville, MS  38776

Site Visit POC: Paula Phillips, 662-336-4831, paula.phillips@usda.gov

Description of Requirement

Obtain Reverse Osmosis (RO) Quarterly and Yearly Maintenance to include replacing consumables and evaluating each system to ensure they are performing well and are running properly (operational checks). There are three RO systems, one each in Large Greenhouse #1, Small Greenhouse #2, and the Main Lab. The RO systems in the Large Greenhouse and Small Greenhouse must produce RO-quality water. The RO system in the Main Lab must produce Distilled-quality water.

The period of performance of this contract is from:

Base Year:          February 1, 2024 - January 31, 2025

Option Year 1:    February 1, 2025 - January 31, 2026

Option Year 2:    February 1, 2026 - January 31, 2027

Option Year 3:   February 1, 2027 - January 31, 2028

Option Year 4:   February 1, 2028 - January 31, 2029 

Files

File Type Posted
DRAFT Pricing Abstract 11.22.2023.xlsx XLSX spreadsheet
DRAFT Statement of Work 11.22.2023.docx DOCX document

Notice history

Notice Type Posted
Reverse Osmosis Water System Maintenance Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
H246--Reverse Osmosis, Deionization Equipment and PE Water Softene 2026-2027 NAICS 221310 Veterans Integrated Service Network 22 No set-aside
J046--IDIQ | Deionization Water System Maintenance and Support NAICS 221310 Veterans Integrated Service Network 4 No set-aside
Z2DA--657-27-111JB, Install Continuous Water Monitoring System St. Louis Vamc Jefferson Barracks St. Louis MO 63125, United States · NAICS 238220 Veterans Integrated Service Network 15 Service-Disabled Veteran-Owned Small Business
Water Treatment Services Los Angeles, California 90073, United States · NAICS 238220 Veterans Integrated Service Network 22 Service-Disabled Veteran-Owned Small Business
AMARG Wastewater Treatement System and Service Tucson, Arizona 85707, United States · NAICS 333310 Air Combat Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors