DRAFT Statement of Work 11.22.2023.docx

DOCX document 58 KB Posted

Attached to
Reverse Osmosis Water System Maintenance Federal contract opportunity
Solicitation number
12445024Q0004
Issued by
Department of Agriculture Forest Service

About this file

This statement of work outlines quarterly and yearly maintenance requirements for three reverse osmosis water systems located at the USDA Forest Service Center for Bottomland Hardwoods Research facilities in Stoneville, Mississippi. Key requirements include operational checks and preventative maintenance tasks to be performed on each system quarterly or annually. For the large and small greenhouse systems, quarterly maintenance includes carbon tank exchanges, filter replacements, and salt additions. The main lab system requires additional yearly mixed bed exchange and filter replacements. Deliverables include maintaining RO and distilled water quality at each location. The contractor must submit comprehensive preventative maintenance reports within two days of each visit. No travel is required and security clearance is not needed beyond presenting employee identification.

View the file

Other files for this federal contract opportunity

Other files attached to Reverse Osmosis Water System Maintenance, newest first.
File Type Posted
DRAFT Pricing Abstract 11.22.2023.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work Reverse Osmosis Systems Quarterly and Yearly Services November 22, 2023

Contents

Project3
General Information3
1.0Scope of Work3
2.0 Background3
Contractor Requirements3
3.0 Technical Requirements / Tasks3
4.0 Government Furnished4
5.0 Deliverables / Schedule4
6.0 Travel4
7.0 Contractor’s Key Personnel4
8.0 Security Requirements4
9.0 Data Rights4
10.0 Section 508 – Electronic and Information Technology Standards4

Project

Reverse Osmosis Systems Quarterly and Yearly Services

General Information

1.0 Scope of Work

The Reverse Osmosis (RO) Quarterly and Yearly Maintenance include replacing consumables and evaluating each system to ensure they are performing well and are running properly (operational checks). There are three RO systems, one each in Large Greenhouse #1, Small Greenhouse #2, and the Main Lab. The RO systems in the Large Greenhouse and Small Greenhouse must produce RO-quality water. The RO system in the Main Lab must produce Distilled-quality water.

Maintenance needs outside of the below and associated operation checks are outside of the scope of this contract. Issues shall be identified to the Contracting Officer’s Representative within 2 weekdays of scheduled maintenance activities. The Government reserves the right to execute identified unscheduled maintenance needs in any manner deemed appropriate per government procurement procedures.

2.0 Background

Three custom built RO systems require quarterly and annual servicing. Service location is the USDA Forest Service, Center for Bottomland Hardwoods Research (CBHR), Southern Research Station, 432 Stoneville Road, Stoneville, MS 38776. Service buildings include main lab, large greenhouse, and small greenhouse.

Contractor Requirements

3.0 Technical Requirements / Tasks

Quarterly and/or yearly maintenance on RO Systems shall include the following:

QUARTERLY SERVING OF LARGE GREENHOUSE #1 (February, May, August, November)

Operational check to ensure system is performing well and are running properly; report submission 1- 300C 1.2 cubic feet Portable Exchange Carbon Tank- Quarterly 1- 20 in. 5-micron melt blown filter- Quarterly 8- 40# bags of salt pellets – Quarterly

QUARTERLY SERVING OF SMALL GREENHOUSE #2 (February, May, August, November)

Operational check to ensure system is performing well and are running properly; report submission 1- 300C 1.2 cubic feet Portable Exchange Carbon Tank- Quarterly 1- 20 in. 5-micron melt blown filter- Quarterly 8- 40# bags of salt pellets – Quarterly

ANNUAL SERVICING (February)

MAIN LAB

Operational check to ensure system is performing well and are running properly; report submission 1- 300C Portable Exchange Carbon Tank- Yearly 1- 300MB Portable Exchange Mixed Bed Tank- Yearly 1- 20 in. 5-micron melt blown filter- Yearly 1- 10 in. 5-micron filter (Vent filter) Yearly 1- 10 in. 5-micron pleated filter- Yearly 3- 40# bags of salt pellets – Yearly

LARGE GREENHOUSE #1

1- 10 in. 5-micron pleated filter (Vent filter) Yearly

SMALL GREENHOUSE #2

1- 10 in. 5-micron pleated filter (Vent filter) Yearly

4.0 Government Furnished

Service location is the USDA Forest Service, Center for Bottomland Hardwoods Research (CBHR), Southern Research Station, 432 Stoneville Road, Stoneville, MS 38776. Service buildings include main lab, large greenhouse, and small greenhouse. Facility access to include access to water/power utilities will be provided.

Facilities are closed on Federal Holidays including:

· New Year’s Day January 1

· Martin Luther King’s Birthday 3rd Monday in January

· Washington’s Birthday 3rd Monday in February

· Memorial Day last Monday in May

· Juneteenth National Independence Day June 19

· Independence Day July 4

· Labor Day 1st Monday in September

· Columbus Day 2nd Monday in October

· Veterans’ Day November 11

· Thanksgiving Day 4th Thursday in November

· Christmas Day December 25

5.0 Deliverables / Schedule

Item No.
Deliverable
Objective
Due
1
RO-quality water in the Large Greenhouse
Quarterly/yearly replace system components per the technical requirements to maintain deliverable
Quarterly as per agreement with staff of CBHR
2
RO-quality water in the Small Greenhouse
Quarterly/yearly replace system components per the technical requirements to maintain deliverable
Quarterly as per agreement with staff of CBHR
3
Distilled-quality water in the Main Lab
Yearly replace system components per the technical requirements to maintain deliverable
Yearly as per agreement with staff of CBHR
4
Quarterly/Annual Preventative Maintenance Report
Comprehensive report of each system’s maintenance and operational checks.
e-mailed to the COR within 2 weekdays after each Preventive Maintenance visit

6.0 Travel

N/A

7.0 Contractor’s Key Personnel

N/A

8.0 Security Requirements

No Linc Pass Required. Present employee company ID at each visit.

9.0 Data Rights

N/A

10.0 Section 508 – Electronic and Information Technology Standards N/A image1.png