Request for Whitepapers: AEDC Velocity Alliance - A Multi-Billion Dollar OTA Consortium Opportunity
Open Solicitation Posted
- Solicitation number
- FA9101-26-9-Velocity_Alliance
- Agency
-
Air Force Test Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541330 Engineering Services
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force, through Air Force Materiel Command, Air Force Test Center, and Arnold Engineering Development Complex (AEDC), seeks whitepapers for membership in the AEDC Velocity Alliance, an Other Transaction consortium under 10 U.S.C. 4022 for infrastructure sustainment, restoration, and modernization, with Opportunity 3 whitepapers due February 24, 2027. Membership is a gate to competition: projects are competed exclusively among Alliance members, though the Government may instead compete them exclusively on the open market or simultaneously, at its discretion. The notice uses no set-aside.
Performance locations are Arnold Air Force Base, Tennessee; the 704th Test Group at Holloman Air Force Base, New Mexico; Tunnel 9 in Silver Spring, Maryland; and the National Full-Scale Aerodynamics Complex at Moffett Field, California, with potential extension to other Air Force Test Center installations. Remote work on engineering, design, and documentation tasks is permissible when CMMC compliance is maintained.
Vendors must hold current Joint Certification Program certification (DD Form 2345) and meet CMMC through Path A (Level 2 Self-Assessment or Level 2 C3PAO certification) or Path B (Level 1 with a roadmap to Level 2 Self-Assessment by November 10, 2026). Whitepapers are limited to 10 pages, excluding Attachment 6. They must include case studies from completed projects within the past five years across 16 technical project types, an intellectual property acknowledgment, and at least one eligible partner (nontraditional defense contractor, small business, or nonprofit research institution) meeting 10 U.S.C. 4022(d)(1)(A) or (B), identified by name and CAGE code, with a separate Attachment 6 self-certification for each partner. Evaluation is Pass/Fail across the four parts; a single failure results in ineligibility.
Successful vendors must attend a mandatory Industry Day on April 28, 2027, at the University of Tennessee Space Institute before executing a Membership Agreement. The Government anticipates approximately 135 planned projects valued at approximately $550 million through Fiscal Year 2027, within a multi-billion-dollar portfolio through FY32. Project competitions predominantly use Best Value evaluation and Firm-Fixed-Price milestone payments, with specific criteria defined in each Project Opportunity Announcement. The Alliance requires no bonding or minimum bids for membership. Vendors bear all whitepaper and proposal costs, and Government financial obligation begins only upon award of a funded Project-Level Agreement. The notice remains active through September 30, 2032.
Notice text
28 versions
Update #28 · Latest ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Completed
-
-
Consortium Activation Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Complete
-
-
Onboarding Opportunity 3:
-
Whitepapers Due: 24 February 2027, 10:00AM CST
-
Mandatory Site Visit Window: 28 April 2027
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- Atch 3 - CMMC-Information.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
- Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
- AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf was posted.
26 Aug 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf - Under Section 4.0, Part 2: Technical Competency, Technical Evaluation #16 was added for Solid Rocket Motors and Components
- Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf - Objective - Solid Rocket Motors and Componets was added
31 Aug 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf
15 Oct 26: AEDC Velocity Alliance - Request for Whitepaper-Amend 6- 15 Oct 26.pdf posted and will be the basis for evaluating onboarding 3 whitepapers. Atch 2 - AEDC Velocity Alliance Base Articles - 15 Oct 26.pdf was updated by adding the Performer Representation article.
15 Oct 26 - AEDC Velocity Alliance - Request for Whitepaper-Amend 7- 15 Nov 26.pdf posted and will be the basis for evaluting onboard 3 whitepapers. Atch 2 - AEDC Velocity Alliance Base Articles - 15 Nov 26.pdf was updated & Atch 6 - VAC_RWP_Part_4_Identified_Partner_Self_Certification.pdf was incorprated. AEDC Velocity Alliance Consortium_Q_A-11.15.26.pdf:
Amendment 7 — Summary of Principal Changes
-
Adds two new Base Articles
-
Inaccurate 10 U.S.C. § 4022(d) Self-Certification: Establishes that § 4022(d) certifications and supporting information are material; requires prompt notice of material inaccuracies; addresses pre-award and post-award consequences; preserves Government recovery/setoff rights to the extent permitted by law; and applies the existing Termination for Default and Termination for Convenience articles rather than creating a separate termination remedy.
-
Organizational Conflicts of Interest and Competition Integrity: Establishes requirement-specific OCI disclosure, review, mitigation, and eligibility procedures to protect against biased ground rules, unequal access to nonpublic information, impaired objectivity, and other competitive-integrity concerns.
-
-
Establishes the Opportunity 3 onboarding schedule
-
Whitepaper submission deadline: 24 February 2027
-
Mandatory Industry Day: 28 April 2027
-
Opportunity 1 and Opportunity 2 are closed/completed.
-
-
Revises how 10 U.S.C. § 4022(d) partnership capability is evaluated at membership entry
-
The Prime Vendor, not the partner, must complete and sign a separate Attachment 6 self-certification for each identified partner.
-
The Prime Vendor bears responsibility for the asserted partner’s identity, eligibility status, existing relationship, anticipated role, unique capability, and significant-extent rationale.
-
This is a membership-entry assessment only. It does not establish a project-specific appropriate-use finding, bind the partner to participate, or replace the separate § 4022(d) analysis, self-certification, and supporting documentation required for each future POA or PLA.
-
For this RFWP Part 4 assessment, the Prime Vendor may rely only on prospective applicability of Conditions A or B; Condition C cost share and Condition D exceptional circumstances are not available for satisfying the Part 4 requirement.
-
Update #27 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Completed
-
-
Consortium Activation Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Complete
-
-
Onboarding Opportunity 3:
-
Whitepapers Due: 24 February 2027
-
Mandatory Site Visit Window: 28 April 2027
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- Atch 3 - CMMC-Information.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
- Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
- AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf was posted.
26 Aug 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf - Under Section 4.0, Part 2: Technical Competency, Technical Evaluation #16 was added for Solid Rocket Motors and Components
- Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf - Objective - Solid Rocket Motors and Componets was added
31 Aug 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf
15 Oct 26: AEDC Velocity Alliance - Request for Whitepaper-Amend 6- 15 Oct 26.pdf posted and will be the basis for evaluating onboarding 3 whitepapers. Atch 2 - AEDC Velocity Alliance Base Articles - 15 Oct 26.pdf was updated by adding the Performer Representation article.
15 Oct 26 - AEDC Velocity Alliance - Request for Whitepaper-Amend 7- 15 Nov 26.pdf posted and will be the basis for evaluting onboard 3 whitepapers. Atch 2 - AEDC Velocity Alliance Base Articles - 15 Nov 26.pdf was updated & Atch 6 - VAC_RWP_Part_4_Identified_Partner_Self_Certification.pdf was incorprated:
Amendment 7 — Summary of Principal Changes
-
Adds two new Base Articles
-
Inaccurate 10 U.S.C. § 4022(d) Self-Certification: Establishes that § 4022(d) certifications and supporting information are material; requires prompt notice of material inaccuracies; addresses pre-award and post-award consequences; preserves Government recovery/setoff rights to the extent permitted by law; and applies the existing Termination for Default and Termination for Convenience articles rather than creating a separate termination remedy.
-
Organizational Conflicts of Interest and Competition Integrity: Establishes requirement-specific OCI disclosure, review, mitigation, and eligibility procedures to protect against biased ground rules, unequal access to nonpublic information, impaired objectivity, and other competitive-integrity concerns.
-
-
Establishes the Opportunity 3 onboarding schedule
-
Whitepaper submission deadline: 24 February 2027
-
Mandatory Industry Day: 28 April 2027
-
Opportunity 1 and Opportunity 2 are closed/completed.
-
-
Revises how 10 U.S.C. § 4022(d) partnership capability is evaluated at membership entry
-
The Prime Vendor, not the partner, must complete and sign a separate Attachment 6 self-certification for each identified partner.
-
The Prime Vendor bears responsibility for the asserted partner’s identity, eligibility status, existing relationship, anticipated role, unique capability, and significant-extent rationale.
-
This is a membership-entry assessment only. It does not establish a project-specific appropriate-use finding, bind the partner to participate, or replace the separate § 4022(d) analysis, self-certification, and supporting documentation required for each future POA or PLA.
-
For this RFWP Part 4 assessment, the Prime Vendor may rely only on prospective applicability of Conditions A or B; Condition C cost share and Condition D exceptional circumstances are not available for satisfying the Part 4 requirement.
-
Update #26 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Completed
-
-
Consortium Activation Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Complete
-
-
Onboarding Opportunity 3:
-
Whitepapers Due: TBD
-
Mandatory Site Visit Window: TBD
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- Atch 3 - CMMC-Information.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
- Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
- AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf was posted.
26 Aug 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf - Under Section 4.0, Part 2: Technical Competency, Technical Evaluation #16 was added for Solid Rocket Motors and Components
- Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf - Objective - Solid Rocket Motors and Componets was added
31 Aug 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf
15 Oct 26: AEDC Velocity Alliance - Request for Whitepaper-Amend 6- 15 Oct 26.pdf posted and will be the basis for evaluating onboarding 3 whitepapers. Atch 2 - AEDC Velocity Alliance Base Articles - 15 Oct 26.pdf was updated by adding the Performer Representation article.
Update #25 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Completed
-
-
Consortium Activation Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 16 September 2026 (Virtual Event)
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- Atch 3 - CMMC-Information.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
- Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
- AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf was posted.
26 Aug 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf - Under Section 4.0, Part 2: Technical Competency, Technical Evaluation #16 was added for Solid Rocket Motors and Components
- Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf - Objective - Solid Rocket Motors and Componets was added
31 Aug 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-8.31.26.pdf
Update #24 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Completed
-
-
Consortium Activation Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 16 September 2026 (Virtual Event)
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- Atch 3 - CMMC-Information.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
- Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
- AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf was posted.
26 Aug 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 5- 26 Aug 26.pdf - Under Section 4.0, Part 2: Technical Competency, Technical Evaluation #16 was added for Solid Rocket Motors and Components
- Atch 1 - AEDC Velocity Alliance Program Objectives - 26 Aug 26.pdf - Objective - Solid Rocket Motors and Componets was added
Update #23 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Completed
-
-
Consortium Activation Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 16 September 2026 (Virtual Event)
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- Atch 3 - CMMC-Information.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
- Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
- AEDC Velocity Alliance Consortium_Q_A-7.17.26.pdf was posted.
Update #22 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Completed
-
-
Consortium Activation Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 16 September 2026 (Virtual Event)
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- Atch 3 - CMMC-Information.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
17 Jul 26 - The following documents were amended:
- AEDC Velocity Alliance - Request for Whitepaper-Amend 4 - 17 Jul 26.pdf, modified criteria found in 4.0 Part 1, and 5.0 Part 1
- Atch 2 - AEDC Velocity Alliance Base Articles - 17 Jul 26.pdf, Article: Cybersecurity Requirements (CUI and CMMC) was revised
Update #21 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Whitepapers Due: Closed
-
Mandatory Site Visit Window: Completed
-
-
Consortium Activation Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 16 September 2026 (Virtual Event)
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
15 Jul 26: The following documents were posted to announce Oppurtunity 2 Industry Day date / location, revise CMMC Requirements, implement the use of 10 U.S.C. 2808a, provide updated Base Agreement Articles, and post Consoritum Q&As.
- AEDC Velocity Alliance - Request for Whitepaper-Amend 3 - 15 Jul 26.pdf
- Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
- Atch 2 - AEDC Velocity Alliance Base Articles - 15 Jul 26.pdf
- Atch 3 - CMMC-Information.pdf
- Atch 4 - CMMC-FAQsv6.pdf
- Atch 5 - AEDC Velocity Alliance Consortium_Q_A-7.15.26.pdf
Update #20 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 17 June 2026
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
24 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.24.26.pdf
Update #19 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 17 June 2026
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
23 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.23.26.pdf
Update #18 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 17 June 2026
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
14 Jun 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-6.14.26.pdf
Update #17 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
26 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.26.26.pdf
Update #16 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
22 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.22.26.pdf
Update #15 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
12 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.12.26.pdf
15 May 26: Posted Amendment 2, Amendment 2 summary of changes, and Atch 5-UTSI Map. This amendment establishes the date/time/location for Oppurtunity 1 Mandatory Site Visit (Industry Day)
Update #14 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26-2.pdf
Update #13 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
1 May 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-5.1.26.pdf
Update #12 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
30 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.30.26.pdf
Update #11 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
28 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.28.26.pdf
Update #10 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
27 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.27.26.pdf
Update #9 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
24 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.24.26.pdf
Update #8 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
23 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.23.26.pdf
Update #7 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
21 Apr 26: Posted the following Amended Documents -
AEDC Velocity Alliance - Request for Whitepaper-Amend 1 - 21 Apr 26.pdf
Atch 1 - AEDC Velocity Alliance Program Objectives - 21 Apr 26.pdf
Atch 2 - AEDC Velocity Alliance Base Articles - 21 Apr 26.pdf
AEDC Velocity Alliance Consortium_Q_A-4.21.26.pdf (Answer to Q.9 Amended)
Update #6 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
17 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.17.26.pdf
Update #5 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Amendments:
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
14 Apr 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-4.15.26.pdf
Section 4: Classification Codes was modified to clarify the following: Primary NAICS Code: 541330 - Engineering Services: This NAICS Code will be utilized to determine size standard for consortium onboarding. Primary NAICS code at the project level may differ from 541330 and will be established in each Project Oppurtunity Announcement.
Update #4 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26-2.pdf
Update #3 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
31 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.31.26.pdf
Update #2 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
30 Mar 26: Posted Question and Answers received to date in document - AEDC Velocity Alliance Consortium_Q_A-3.30.26.pdf
Update #1 ·
1. Strategic Purpose:
The Department of the Air Force, through the Air Force Test Center (AFTC) and Arnold Engineering Development Complex (AEDC), announces the establishment of the AEDC Velocity Alliance. This strategic consortium-based initiative is established under the authority of 10 U.S.C. § 4022 to accelerate the modernization of national test infrastructure in direct support of next-generation defense systems and key National Defense Strategy objectives.
The objective is to establish a pre-qualified industrial base to execute a multi-billion dollar portfolio of complex engineering and construction projects. Upon establishment, all projects under this initiative will be competed exclusively among Alliance members.
2. Key Dates for Industry:
The Government intends to onboard members in multiple phases.
-
Onboarding Opportunity 1:
-
Questions Due: 1 May 2026, Close of Business (COB)
-
Whitepapers Due: 1 June 2026, COB
-
Mandatory Site Visit Window: 1 June 2026 – 30 June 2026
(Exact date will be communicated to vendors with successful submissions)
-
-
Anticipated Consortium Live Date: 1 July 2026
-
Onboarding Opportunity 2:
-
Whitepapers Due: 1 September 2026, COB
-
Mandatory Site Visit Window: 1 September 2026 – 30 September 2026
-
-
This Request for Whitepaper notice will remain active until: 30 September 2032.
3. Action Required:
We invite all interested and qualified vendors to carefully review the attached documents in their entirety to ensure all mandatory onboarding criteria are satisfied within their whitepaper submission.
4. Classification Codes:
-
Primary NAICS Code: 541330 - Engineering Services
-
Primary PSC Code: AC13 - National Defense R&D Services; Department of Defense - Military; Experimental Development
(Note: While these are the primary codes, any NAICS/PSC code that fits within the scope of the Program Objectives is acceptable.)
Files
Show all 50
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Request for White Paper - ICD 705 Compliant Trailers | Air Force Test Center | No set-aside | |
| Request for Whitepaper-Arc Heater Component Manufacturing and Supply | Air Force Test Center | No set-aside | |
| Space Data Network (SDN) Industry Consortium for Space-to-Space Communications | Space and Missile Systems Center | No set-aside | |
| RWP - Extreme Loads Tire Force Machine (ELTFM) | Air Force Test Center | No set-aside | |
| Pioneering Aerospace Capabilities, Engineering and Research | Air Force Research Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity