AMENDMENT : Request for Proposal - Paint Interior/Exterior Walls ARTCC Facility, Anchorage Alaska
Closed Solicitation Posted
- Solicitation number
- 6973GH-25-R-00195
- Agency
-
Franchise Acquisition Servies
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 23832 Painting and Wall Covering Contractors
- Place of performance
- Anchorage, Alaska, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Aviation Administration is seeking a contractor to provide comprehensive painting and repair services for the Air Route Traffic Control Center (ARTCC) facility in Anchorage, Alaska. The procurement encompasses two primary scopes of work: interior repairs and repainting of walls, doors, and frames throughout Building 400's Technical/Operations, Support, and Administrative wings, including common areas such as corridors, conference rooms, and break rooms, along with cove base replacement; and exterior painting of the ZAN Building 400 Tech Ops Wing, which includes sandblasting old paint, patching masonry, resealing flashing, and repainting exterior surfaces, overhangs, and utility bay areas. Proposals will be evaluated based on two factors: Price Proposal and Past Performance, with offerors required to demonstrate at least two commercial painting projects valued at $100,000 or more completed within the last three years with satisfactory ratings. Performance and payment bonds must be provided within 10 days of contract award. The solicitation due date has been extended to August 22, 2025, at 12:00 PM Alaska Time, and all offerors must receive "Acceptable" ratings in every evaluation category to be considered for award.
This opportunity is designated as a Total Small Business set-aside under NAICS code 238320 for Painting and Wall Covering Contractors. The work will be performed at the ARTCC facility located in Anchorage, Alaska, with the contractor responsible for verifying all actual square footage measurements. The scope includes specialized requirements such as dust and noise control barriers, demolition and disposal activities, and coordination with facility operations for door painting on both sides. No incumbent contractor information was provided in the solicitation documents, and specific contract values or budget ranges were not disclosed. The contractor will be required to comply with Davis-Bacon Act wage determinations as evidenced by the included wage decision documentation, and the project involves both interior restoration work addressing wear from equipment movement and general use, as well as comprehensive exterior surface preparation and refinishing work.
Notice text
Repair wall, jamb & door finishes JCN:808173
Scope: Patch, repair and re-paint interior walls, doors and frames marred by use, movement of
equipment and materials and general wear included in the limits of work. This includes the common
areas, i.e., corridors, conference rooms, break rooms. This work will include Technical /Operations wing
bldg. 400, ops Support wing bldg. 400. Administrative Wing bldg. 400. Repairs to drywall, priming, and
painting are included and removal and replace of all covebase. Contractor to provide dust and noise
control barriers as needed. Demolition, disposal, and final cleanup included. This work will include
replacing all cove base to match existing in kind in specified areas.
Repaint exterior Walls Zan ARTCC JCN: 24016852
Scope of work: RE-Paint exterior of ZAN BLDG 400, Tech Ops Wing as shown on the attached site plan page 66. This work includes to Remove/sandblast old paint down to clean substrate, minor patch and point up masonry units as needed to obtain smooth finish. Remove the old exterior flashing sealant and re-seal flashing after painting is completed. Repair any damaged cement board under flashing re-secure, re-paint accordingly to the specifications. Prep, prime R-paint the exterior overhang awning and utility Bay underside canopy and facia per specifications. All actual square feet must be verified by the contractor.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities