Request For Information (RFI): TRILOS Modernization
Closed Pre-Solicitation Posted
- Solicitation number
- TRILOS
- Agency
-
ACC Aberdeen Proving Ground
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- Not on record
- PSC
- Not on record
- Place of performance
- Aberdeen Proving Ground, Maryland 21005, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground is seeking industry feedback through a Request for Information (RFI) regarding the modernization of Terrestrial Transmission Line of Sight (TRILOS) communications equipment. The RFI aims to identify capabilities that can provide greater throughput, require less manning, and have significant advantages in Size, Weight, Power, and Cost (SWaP-C). The anticipated requirement is for approximately 700+ systems, with potential for more, to be fielded from FY26-FY33. The new system variants will likely include a Radio Frequency (RF) based system with modular Free Space Optics (FSO) and/or an aerial-tier/variable height mast configuration. This RFI is for informational and planning purposes only and does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future.
The RFI does not use any set-aside designations, and there are no incumbent contractors or current award values mentioned. The government is not seeking proposals at this time and will not accept unsolicited proposals or reimburse respondents for any costs associated with this RFI. Interested parties are advised to monitor the System for Award Management (SAM.gov) website for any future solicitation related to this requirement.
Notice text
Project Manager (PM) Tactical Network (TN) is seeking industry feedback regarding capabilities of modern Terrestrial Transmission Line of Sight (TRILOS) communications equipment that can provide greater throughput, require less manning, and have significant advantages in Size, Weight, Power, and Cost (SWaP-C). The anticipated required quantity is approximately 700+ systems with greater potential for pure fleeting if exercised. The anticipated timeline is FY26-FY33.
The distributed Basis of Issue (BOI) will consist of 2 to 3 new system variants: comprised of a Radio Frequency (RF) based system with modular extensions incorporating Free Space Optics (FSO), and/or an aerial-tier/variable height mast type configuration.
This RFI is being issued in accordance with Federal Acquisition Regulation 15.20l(e) for informational and planning purposes only - it does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This RFI does not commit the U.S. Government (USG) to a contract for any supply or service whatsoever. At this time, the USG is not seeking proposals and will not accept unsolicited proposals. Responders are advised that the USG shall not be responsible for any costs incurred in response to this RFI, nor shall the USG pay for any associated information or administrative costs. All costs associated with responding to this RFI shall be solely at interested parties' expense. Not responding to this RFI does not preclude participation in an RFP if one is issued. If a solicitation is released, it will be synopsized on the System for Award Management (SAM.gov) website. It is the responsibility of the potential responder to monitor this site for additional information pertaining to this requirement.
Files
| File | Type | Posted |
|---|---|---|
| TRILOS RFI Test Events.pdf | ||
| Copy of Technical Capabilities for Radio and System Implementation Design Final.xlsx | XLSX spreadsheet | |
| RFI TRILOS Modernization SAM Post.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Extended Army Contracting Command (ACC) Aberdeen Proving Ground (APG) High Altitude Electromagnetic Pulse (HEMP) hardened medium fixed Satellite Communications Earth Terminals Request for Information (RFI) | ACC Aberdeen Proving Ground | No set-aside | |
| FA2204_RFI_TACMOR_System | Air Force | No set-aside | |
| RFI - UMTE X Band Transmitter | AFLCMC Hill AFB | No set-aside | |
| Call to Industry: Commercial Software RFI | ACC Aberdeen Proving Ground | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity