Replace SAB HVAC
Pre-Solicitation Posted
A newer solicitation was posted. See the latest solicitation from .
- Solicitation number
- FA252122B0017
- Agency
- Air Force Space Command Air Force, Department of Defense
- Responses due
- Not on record
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Canaveral Air Station, Florida 32925, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice announces the Air Force's intent to replace the HVAC system at Facility B49904 located at Cape Canaveral Space Force Station, Florida. The scope of work includes replacing an 80-ton chiller, installing a 2-ton mini split system, and upgrading various air handler and building controllers to the EMCS platform. Interested parties are advised to monitor SAM.gov on or around August 15th for solicitation FA252122B0017, which will be issued as an invitation for bid evaluated on lowest price technically acceptable basis. The period of performance is 180 calendar days from the notice to proceed.
The acquisition is set aside exclusively for service-disabled veteran-owned small businesses. The predominant NAICS code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors while the applicable PSC code is R499 - Operation and Maintenance of Buildings. No incumbent is named but the replacement chiller equipment is specified as a Trane product. The pre-solicitation notice does not provide an estimated contract value or budget but the scope of replacing an entire HVAC system suggests an award in the mid-to-high six figure range.
Notice text
Project DBEH 22-1578; The work to be performed consists of Replacing chiller and install Split System at facility B49904 to include the following. In east UPS Room remove the 12" flex duct that is hanging from the duct work and seal hole in the duct system and re-insulate the duct. Install 2 ton mini split system on the east wall exterior and wall evaporator on the inside wall. Carrier will be sufficient for mini split system. Need a Controls contractor to install a temperature sensor in the duct system prior to VAV-11 and reprogram VAV-11 to close damper if the supply air temperature increases over 60 degrees. Reprogram the heater element in the VAV box not to operate. Replace 6 Metasys controllers with EMCS controllers on the following air handlers and one VAV: AHU-1, AHU-6, AHU-10, AHU-11 AHU-12 and AHU-15 and VAV-11. Replace Niagara Jace with EMCS ASP building controller complete with graphical interface. Replace all Distect controllers with EMCS Controllers. Replace 80 ton chiller on south side with a new Trane chiller. Coils to be coated with Blygold Coating. Cut supply and return lines to the first set of valves. Re-insulate after piping secured. All electrical requirements shall be field verified. Operate and test the new mini split and chiller and make sure they are fully operational.
Attachments
| File | Type | Posted |
|---|---|---|
| 22B0017 Presolicitation Notice.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace SAB HVAC | Solicitation | |
| Replace SAB HVAC | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity