Replace Chillers and HVAC System

Closed Solicitation Posted

Solicitation number
W91151-21-B-0007
Agency
MICC Fort Hood Mission and Installation Contracting Command, Department of Defense
Responses due
Set-aside
Woman-Owned Small Business

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Z1AA Maintenance Of Office Buildings
Place of performance
Fort Hood, Texas 76544, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks replacement of chillers and HVAC systems at Building 5764 located at Fort Hood, Texas. The Department of the Army Materiel Command Mission and Installation Contracting Command requires removal and replacement of an existing Daikin chiller, air handling units, and associated electrical and controls with new equipment. Offerors must complete performance within 180 calendar days of notice to proceed. Bids are due by August 31, 2021 and will be evaluated based on technical qualifications and price. Questions regarding the solicitation are due by August 13.

This requirement is set aside exclusively for women-owned small businesses. The NAICS code is 238220 and PSC code R499 covers replacement of existing HVAC and cooling equipment. The place of performance is Building 5764 at Fort Hood, Texas. Three bids were received in response, ranging from $910,222 to $924,574. The work must be completed within 180 calendar days and involves removal of an existing chiller and installation of a new Daikin chiller and associated HVAC equipment at the specified building on Fort Hood.

Notice text

DPW requires replacing the existing HVAC systems with new HVAC systems. The work includes the removal and replacement of the existing Daiken chiller with a Daiken new chiller. The removal and replacement of AHU’s and the removal and replacement of electrical and controls that are associated with the new HVAC equipment. The work shall be performed at building 5764, located at the intersection of Wainwright Dr. 24th St. (Club Hood), Ft. Hood, TX. The anticipated completion date of this construction project is 180 calendar days from the date of notice to proceed. Completion is defined as satisfactory completion of all work described in the scope of work and or approved plans and drawings in a timely manner, including other contractual obligations identified as closeout documentation, final testing, inspection, and acceptance.

Attachments

Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Replace Chillers and HVAC System This notice · Latest solicitation Solicitation
Replacement of HVAC systems and Chillers Pre-Solicitation
Replace AC and Chiller Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity