This amendment to a solicitation provides responses to requests for information regarding Solicitation Number W91151-21-B-0007 from the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. The solicitation requires replacing the existing HVAC systems at Building 5764 with new HVAC equipment, including removing and replacing a Daikin chiller, air handling units, and associated electrical and controls. Any certified Duro-Last roofing contractor is sufficient to perform necessary roof repairs. No temporary cooling is required as the chiller replacement should occur during winter months. The superintendent, project manager, quality assurance representative, and site safety and health officer must provide adequate coverage whenever workers are on site.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Bid Abstract 21-B-0007 replace chiiler BLDG.5764_.pdf | ||
| Chillers JA FAR 2-Part6-JA-Template 4_Redacted.pdf | ||
| Released Amendment_21B0007.pdf | ||
| Released Amendment1_21B0007.pdf | ||
| released Solicitation 21B0007.pdf | ||
| CA920000P - TECH EXHIBIT A- REPLACE AC AND CHILLER AT B 5764.pdf | ||
| CA920000P - Attachment 1-Appendix A.pdf | ||
| Drawings -- CA920000P - TECH EXHIBIT B - REPLACE AC AND CHILLER AT B 5764.pdf | ||
| CA920000P - Statement of Work - REPLACE AC AND CHILLER AT B 5764.docx | DOCX document | |
| Chillers JA FAR 2-Part6-JA-Template 4_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011641983 CA920000P
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. The purpose of this Solicitation Amendment is to provide RFI responses that w ere pending DPW responses.
2. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9115121B0007
X 9B. DATED (SEE ITEM 11)
28-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2021
CODE
MICC - FORT HOOD
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9115121B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFI RESPONSES
RFI Responses for W91151-21-B-0007 Replace A/C chiller Bldg.5764
Q1. Keynote 1/D101D says that the previous roofer needs to do any repairs necessary. Can you please let me know who that previous roofing subcontractor was?
Government response: ANY CERTIFIED DURO-LAST ROOFING CONTRACTOR WILL BE
SUFFICIENT.
Q2. Is the water system included for the above project? Found the water softener specifications but incomplete.
Government response: N/A- because there is no requirement for the installing Contractor to treat the water system, just install the new chemical pot feeder as required on the drawings and it will be taken care of after installation by the current service contract company.
Q3. As per M-001, Note 1, what type of temporary cooling do we need to provide?
Government response: N/A - THE CHILLER CHANGE OUT SHOUD BE OCCURRING
DURING THE WINTER MONTHS.
Q4. Is the superintendent to be on site anytime workers are on site?
Is the PM, QA, and SSHO to be adequate coverage?
Government response: YES TO BOTH QUESTIONS