Replace Boilers 1 thru 3
Closed Special Notice Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 15B21323PR000076
- Agency
- BOP Field Acquisition Office Regional Offices, Department of Justice
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- PSC
- 4410 Industrial Boilers
- Place of performance
- Minersville, Pennsylvania 17954, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This Special Notice was published by the Department of Justice Bureau of Prisons Field Acquisition Office. The notice seeks to award a firm-fixed-price construction contract to replace boilers 1 through 3 at the Federal Correctional Institution in Schuylkill, Pennsylvania.
The objective is to solicit bids from small businesses to remove the existing boilers, pumps, and associated piping and replace them with a new high-efficiency dual fuel system meeting state emissions standards. Interested contractors must register in SAM.gov and add their business name to the interested vendors list by March 17, 2023. Eligible contractors will need to verify that existing gas, electric, and water supplies can support the new boiler system. The estimated value of the project is between $1 million to $5 million. The replacement boilers must provide a balanced and fully operational system according to specifications in the notice.
Notice text
The contractor shall provide all labor, materials, equipment for the Replace Boilers 1 thru 3 at FCI Schuylkill. The project includes the removal/ replacement of three Boilers to include pumps and all associated piping to make a fully functional system. The new boiler should be high efficiency dual fuel (natural gas/#2 fuel) condensing or fire-tubed not to exceed the PA DEP requirements of NOx3 (below 30ppm), #2 Fuel Oil (below 90 ppm). The contractor is responsible for verifying if the current gas, electric, water, communication, HVAC, etc. supplies are adequate for the new boiler. The contractor will be responsible for sizing the boilers to match existing equipment along with the newly designed Hot Water Loop indicated on the Construction Documents Specifications/Drawings dated 06-04-2021. The new boilers must provide a completely balanced and operational boiler system. Contractor will upgrade (if required) the service in addition to, obtaining dimensional data for installation of the new boiler.
Attachments
| File | Type | Posted |
|---|---|---|
| Sources Sought.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace Boilers 1 thru 3 at FCI Schuylkill, PA | Award Notice | |
| Replace Boilers 1 thru 3 at FCI Schuylkill, PA | Solicitation | |
| Replace Boilers 1 thru 3 at FCI Schuylkill, PA | Pre-Solicitation | |
| Replace Boilers 1 thru 3 | Pre-Solicitation | |
| Replace Boilers 1 thru 3 | Special Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity