Repair of Damaged Wash Rack Pipe at Air Station Sacramento
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 20290QDL952300156
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- 4510 Plumbing Fixtures And Accessories
- Place of performance
- Sacramento, California, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The contractor is required to provide all labor, equipment, and materials for site excavation and repairs to damaged piping, including the removal and disposal of contaminated materials due to flooding. The contractor will also be responsible for maintaining safety standards, cleaning the work area, and potentially increasing the scope of work if necessary. The project is to be completed within 07 days of the contract being awarded, with work to be performed between 0800-1400, Monday-Friday.
Products and Services to be provided:
- Site excavation and repairs to damaged piping.
- Removal and disposal of contaminated materials due to flooding.
- Maintenance of safety standards and provision of personal protective equipment.
- Cleaning of the work area and disposal of waste materials.
- Potential increase in scope of work if issues are more extensive than originally expected.
Notice text
2 versions
Update #2 · Latest ·
A00001 - This solicitation is extended from closing on 14 August 2023 at 10:00 AM EST to 14 August 2023 at 2:00 PM EST.
- Provide all labor, equipment, and materials to complete the site excavation and repairs to damaged piping to include:
- Mobilize manpower and equipment to complete the project in a professional and timely manner complying with all local, state, and federal regulations adhering to OSHA guidelines where applicable.
- Install barriers/engineering controls to isolate the work area: Cones, caution tape, signage, etc. as needed during cleanup activities and maintain as needed.
- Identify and verify that all utilities wet and dry have been abandoned, locked out and tagged out as necessary prior to clean up.
- Supply personal protective equipment (hard hats, goggles, gloves, fall protection, safety vest, etc.) for certified supervisor and cross trained and certified employees throughout the duration of the project.
- Load all waste materials for proper disposal and packaged properly according to state and federal regulations.
- Leave each work clean and free of debris as feasible and safe at the end of each shift.
- Proposal to include all labor, supplies, etc. necessary to complete the project.
- Set up negative air containment.
- Install 6 mil poly sheeting at all entrances.
- Remove and dispose of ACM and non-ACM drywall due to black water flooding throughout the basement.
- Bag up contaminated ceiling tiles on the floor caused by flooding and dispose of.
- Remove and properly disposal extra drywall at areas that have visual mold on outside surface where occurs.
- HEPA vacuum, scrub, wet wipe, and sanitize basement floor using a sanitization mixture to clean existing contaminants due to black water flooding.
- Includes cleaning of bottom frame track after drywall remove. Services shall be accomplished between the hours of 0800-1400, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative.
- The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement.
- Project is to be completed within 07 days of the contract being awarded.
- The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site.
- The Contractor shall remove all debris, rubbish and hazardous waste from the job site.
- The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection.
- The Contractor shall be prepared to increase scope of work if issue is determined to be more extensive than originally expected.
- Unsatisfactory performance shall result in work being re-accomplished at no cost to the government.
- It is the contractor’s responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal.
- The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement.
Update #1 ·
- Provide all labor, equipment, and materials to complete the site excavation and repairs to damaged piping to include:
- Mobilize manpower and equipment to complete the project in a professional and timely manner complying with all local, state, and federal regulations adhering to OSHA guidelines where applicable.
- Install barriers/engineering controls to isolate the work area: Cones, caution tape, signage, etc. as needed during cleanup activities and maintain as needed.
- Identify and verify that all utilities wet and dry have been abandoned, locked out and tagged out as necessary prior to clean up.
- Supply personal protective equipment (hard hats, goggles, gloves, fall protection, safety vest, etc.) for certified supervisor and cross trained and certified employees throughout the duration of the project.
- Load all waste materials for proper disposal and packaged properly according to state and federal regulations.
- Leave each work clean and free of debris as feasible and safe at the end of each shift.
- Proposal to include all labor, supplies, etc. necessary to complete the project.
- Set up negative air containment.
- Install 6 mil poly sheeting at all entrances.
- Remove and dispose of ACM and non-ACM drywall due to black water flooding throughout the basement.
- Bag up contaminated ceiling tiles on the floor caused by flooding and dispose of.
- Remove and properly disposal extra drywall at areas that have visual mold on outside surface where occurs.
- HEPA vacuum, scrub, wet wipe, and sanitize basement floor using a sanitization mixture to clean existing contaminants due to black water flooding.
- Includes cleaning of bottom frame track after drywall remove. Services shall be accomplished between the hours of 0800-1400, Monday-Friday, not to include federal holidays except as designated by the contracting officer or official representative.
- The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement.
- Project is to be completed within 07 days of the contract being awarded.
- The government shall use a 100% surveillance method. Inspection of work shall be performed at the time the Contractor is at the site performing its services and prior to contractor leaving the site.
- The Contractor shall remove all debris, rubbish and hazardous waste from the job site.
- The Contractor shall keep the Contracting Officer and /or technical POC fully informed on the daily progress of the work, from the start through completion of this inspection.
- The Contractor shall be prepared to increase scope of work if issue is determined to be more extensive than originally expected.
- Unsatisfactory performance shall result in work being re-accomplished at no cost to the government.
- It is the contractor’s responsibility to verify all measurements/dimensions listed above prior to submitting a quote/proposal.
- The Contractor shall coordinate with the technical POC to schedule a date and time for project commencement.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repair of Damaged Wash Rack Pipe at Air Station Sacramento | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Design-Build Repair Storm Sewer Lines at U. S. Coast Guard Base San Juan, Puerto Rico Project Number: PN 15852459 | — | Service-Disabled Veteran-Owned Small Business | |
| USAG- Pumping and Cleaning of Grease Traps and Septic Tanks | Mission and Installation Contracting Command | HUBZone | |
| DSCR B34 & B42 System Smoke Testing & Hydro Jetting | Defense Logistics Agency | Total Small Business | |
| SOURCES SOUGHT: Grease, Sand Trap, Oil and Water Separator | Air Combat Command | No set-aside | |
| MDC brooklyn - remove and replace shower partitions | Metropolitan Detention Center Brooklyn | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity