Repair Fire Suppression System in WRM Warehouse Bldg#2462 and #2464, Osan AB (MATOC Work Plan)

Closed Solicitation Posted

Solicitation number
W90VN6-24-R-0026
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Osan AFB Gyeonggi Korea, South

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Materiel Command Army Contracting Command is seeking a contractor to repair the fire suppression system in two WRM warehouses, Buildings 2462 and 2464, at Osan Air Base in South Korea. This is a task order under a Multiple Award Task Order Contract (MATOC), where the contractor must develop a 100% plan and design, and provide all necessary management, labor, materials, and equipment to complete the project based on the government's 30% concept design and scope of work. Key requirements include replacing/upgrading the fire protection, HVAC, electrical, and architectural systems in both buildings. Contractors must submit technical drawings, cost estimates, and Section K certifications as part of their proposals, which are due by 1300 hours on August 23, 2024.

This contract opportunity is not set aside for any specific program. The magnitude of the project value is between $1 million and $5 million, and the successful contractor must commence work within 10 calendar days of award and complete the project within 360 calendar days. The place of performance is Jeokbong-ri, Seotan-myeon, Pyeongtaek-si, Gyeonggi-do, South Korea.

Notice text

  1. GENERAL: The work to be performed for completion of this Work Plan project shall be as described in general below.
    1. The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.
    2. All work shall be completed IAW APPENDIX “A” As-built drawings, and APPENDIX “B” Specifications associated with this project.

Contract Type: This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The definition of Work Plan is a task order in which the contractor must develop 100% plan and design, and provide all design drafting, management, supervision, plant, labor, materials, equipment, and any other resources necessary to complete this project based on the Government provided 30% of concept design and scope of work contained herein and as included in the as-built drawings and specifications. The task order proposal submission requirements are as below:

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
ICD-705 Controlled Spaces Modernization and Sustainment Program - (Progressive Design-build (PDB) Other Transaction Agreement (OTA) Osan Air Base Korea, South · NAICS 236220 ENDIST Far East No set-aside
Active vehicle barriers and associated control system at osan air base 96278 · NAICS 332999 Army Contracting Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors