Item 0001 Project Drawings.pdf

PDF 12 MB Posted

Attached to
Repair Fire Suppression System in WRM Warehouse Bldg#2462 and #2464, Osan AB (MATOC Work Plan)
Solicitation number
W90VN6-24-R-0026
Issued by

About this file

This document is an Item 0001 Project Drawings file related to a federal contract opportunity issued by the Department of the Army Materiel Command Army Contracting Command to repair the fire suppression system in two warehouses at Osan Air Base.

The contract opportunity, identified as Solicitation Number W90VN6-24-R-0026, is a task order under a Multiple Award Task Order Contract (MATOC) where the contractor must develop a 100% plan and design and provide all necessary resources to complete the project. The scope of work is based on 30% concept design and as-built drawings and specifications provided by the government. The contract type is a Work Plan task order, which requires the contractor to submit a proposal. No other details about pricing, set-asides, or award dates are provided in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-001

E - 1 AS-BUILT DRAWINGS

E - 2 AS-BUILT DRAWINGS

E - 3 AS-BUILT DRAWINGS

E - 4 AS-BUILT DRAWINGS

S-001 STRUCTURAL NOTES - SHEET 1

S-102 ROOF STRENGTHENING PLAN

S-002 STRUCTURAL DETAILS - SHEET 2

S-501 STRUCTURAL DETAILS - SHEET 1

CIVIL

WATER LINE MAP

ELECTRICAL

(REFERENCE ONLY)

NOTE:

ALL DRAWING GRAPHIC SCALES SHOWN ARE FOR REFERENCE ONLY.

THESE MAY NOT BE COMPATIBLE WITH EACH DRAWING.

FP-101 FIRE SPRINKLER FLOOR PLAN

MECHANICAL

SOLAR AIR COLLECTOR ELEVATION

MECHANICAL

SOLAR AIR COLLECTOR ELEVATION

MECHANICAL

SOLAR AIR COLLECTOR ELEVATION

C 01

1378995880U Stamp c-001

W

AT

ER

L

IN

E

M

AP

WATER LINE MAP

1378995880U Stamp

1378995880U Rectangle

1378995880U Rectangle

1378995880U Typewritten Text

WATER LINE MAP

1378995880U Rectangle

1378995880U Polygon

1378995880U Typewritten Text

REPLACE W/ NEW

1378995880U Line

1378995880U Line

1378995880U Rectangle

1378995880U Typewritten Text

PIV

ASSEMBLY

Line

REMOVE EXST. MECH RM AND PROVIDE NEW MECH AND ELEC ROOM IAW SOW

REPLACE AND PROVIDE NEW DOOR PAD AND CONCRETE STOOP

NEW SSMR SYSTEM

Rectangle

1378995880U Typewritten Text

REPLACE W/ NEW SSMR SYSTEM

REPLACE EXIST. METAL ROOFING W/ NEW

STANDING SEAM METAL ROOF SYSTEM

REPLACE EXIST. OVERHEAD

COILING DOOR W/ NEW ONE REPLACE EXIST. OVERHEAD

COILING DOOR W/ NEW ONE

REPLACE EXIST. METAL ROOFING W/ NEW

STANDING SEAM METAL ROOF SYSTEM

REPLACE EXIST. METAL ROOFING W/ NEW

STANDING SEAM METAL ROOF SYSTEM

PROVIDE NEW

MECH RM AND

ELEC RM

E4

FP101

150.00ø

DV

DV

100.00ø

1 2 3 4 5 6 7 8 9 10 11 12 13

A

B

C

D

E

F

Remote Area Name Most Remote Sprinkler Zone Occupancy Classification Ordinary Group I Density 0.14 l/s*m2

Total Hose Streams 950 lpm Flowing Heads 30 Sprinkler Heads K-Factor 8.0 Total Water Required 4299.361 lpm Total Pressure Required 342.464 kPa Safety Margin +113.63 kPa

50.00ø

50.00ø

50.00ø

50.00ø

150.00ø 150.00ø

150.00ø

150.00ø

50.00ø

50.00ø

50.00ø

50.00ø

50.00ø

50.00ø

50.00ø

50.00ø

50.00ø

50.00ø

50.00ø

50.00ø

150.00ø

AREA B DRY SPRINKLER ZONE

ESTIMATED VOLUME: 2967 L

AREA A DRY SPRINKLER ZONE

ESTIMATED VOLUME: 2899 L

F F

F

F

D

SP

D

SP

D

SP

D

SP

D

SP

D

SP

D

SP

D

SP

FF

FF

TEST

UG

200.00ø

DSPFD

C

TH

FDCFDCFDC

150.00ø

DV

DV

100.00ø

DSPFD

C

TH

FP101

FL

O

O R

P

LA

N

FI

R E

Scale: 1:200

FIRE PROTECTION FLOOR PLANA2

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

A

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

A1

W

2U M

-1 0-

D -0

W

2U M

-2 0-

F-

N

O

VE

M

BE

R , 2

U N

IT

AP

O A

P

1-

FA

R

E

AS

T D

IS

TR

IC

T

R

EP

AI

R

W R

M W

AR

EH

O U

SE

, B

U

IL

D

IN

G

O

SA

N A

IR

B

AS

E, K O

R

EA

100% SUBMITTAL

T.

SU

LL

IV

AN

N .N

G U

YE

N

B.

BU

R D

IC

K

M .A

AB

Y

1. SEE SHEETS FP001 AND FP002 FOR FIRE PROTECTION

GENERAL NOTES, LEGEND, AND DETAILS.

2. ORDINARY HAZARD AREA. SPRINKLER DENSITY =

K-8.0, 0.14L/S*M2 (0.2 GPM/SQ. FT). OVER 325M2 (3,500

SQ. FT).

3. NEW DRY PIPE SPRINKLER SYSTEMS MUST UTILIZE

NITROGEN GENERATION SYSTEMS IN ACCORDANCE

WITH UFC 3-600-01, SECTIONS 9-7.7 AND 9-7.9

4. PROVIDE EMERGENCY LIGHTING FOR MECHANICAL

ROOM. REFER TO ELECTRICAL PLANS.

5. MECHANICAL AND ELECTRICAL ROOM SHALL BE

PROTECTED BY UPRIGHT SPRINKLERS.

6. SYSTEM SIZE SHALL BE SUCH THAT INITIAL WATER IS

DISCHARGED FROM THE SYSTEM TEST CONNECTION

IN NOT MORE THAN 60 SECONDS STARTING AT THE

NORMAL NITROGEN PRESSURE ON THE SYSTEM SIDE

AND AT THE TIME OF FULLY OPENED INSPECTION

TEST CONNECTION (TO BE LOCATED AT THE

FURTHEST POINT FROM THE MAIN VALVE) IN

ACCORDANCE WITH UFC 3-600-01 SECTION 9-7.9.2.

CONTRACTOR TO VERIFY WATER DELIVERY TIME.

(THE USE OF A QUICK-OPENING DEVICE IS ALLOWED.)

GENERAL NOTES:

KEYNOTES

1. CONNECTION TO EXISTING 200mm (8") FIRE SERVICE MAIN

2. NEW 150mm (6") DOUBLE CHECK BACKFLOW PREVENTER

ASSEMBLY WITH OS&Y VALVES WITH SUPERVISORY

SWITCHES. ASSEMBLY MUST BE LISTED FOR FIRE

PROTECTION USE AND VERTICAL (FLOW UP)

INSTALLATIONS. BACKFLOW PREVENTER TO BE INSTALLED

VERTICALLY SO THAT THE UPPER OPERATING

HANDWHEEL IS NO MORE THAN 1.8m ABOVE THE FINISHED

FLOOR IN ACCORDANCE WITH UFC 3-600-01 SECTION

9-6.6.2.3.

3. 100mm (4") FDC CHECK VALVE WITH AUTO BALL DRIP.

4. 2-WAY, SQUARE PATTERN FLUSH-MOUNTED FDC. PROVIDE

SIGNAGE ABOVE FDC INDICATING IT SERVES THE

WAREHOUSE ONLY.

5. NITROGEN GENERATOR FOR DRY PIPE VALVE ASSEMBLY

W/ BUILT-IN AIR COMPRESSOR AND AIR MAINTENANCE

DEVICE. REFER TO SHEET FP001 FOR FURTHER

INFORMATION.

6. TO DRY SPRINKLER ZONE 1.

7. TO DRY SPRINKLER ZONE 2.

8. NEW SKYLIGHT-TYPICAL OF 8 LOCATIONS. HIGH

TEMPERATURE SPRINKLERS SHALL BE INSTALLED IN THE

SKYLIGHTS. SEE A104 FOR DIMENSIONS

9. DOWN TO TEST CONNECTION AND LOW POINT DRAIN

10. EXISTING UNDERGROUND PIPE APPROXIMATELY 60960MM

(200 FT) TO FIRE HYDRANT

11. TEST HEADER FOR FULL FORWARD FLOW OF THE

BACKFLOW PREVENTER.

Scale: 1:20

ENLARGED MECHANICAL ROOME4

0 4 8m

0 0.5 1m

NOTE:

1. THE FIRE SPRINKER SYSTEM ROUTING AND PIPE SIZES

SHOWN ARE CONCEPTUAL FOR IGCE PURPOSE ONLY. THE

CONTRACTOR SHALL SUBMIT THE DETAILED SHOP

DRAWINGS AND THE DESIGN ANALYSIS TO GOVERNMENT

FOR APPROVAL PRIOR TO CONSTRUCTION.

2. THE EQUIPMENT ARE SHOWN IN SUGGESTED

LOCATIONS, FINAL QUANTITY AND LAYOUT SHALL BE IN

ACCORDANCE WITH APPLICABLE CODES,

MANUFACTURER'S RECOMMENDATIONS AND

EQUIPMENT LISTINGS.

NOTES

1. PROVIDED FIRE ALARM DRAWINGS ARE FOR REFERENCE ONLY.

CONTRACTOR MUST UPDATE AND DELVELOP FIRE ALRM DRAWINGS AS

NEW PLAN AND WORK.

3. REFER THE SCOPE OF WORK FOR REQUIREMENT.

INSTALL SOLAR AIR HEATER COLLECTOR

w/ CORRUGATED POLYCARBONATE PANEL

70M X 4M APPROX.

TYPICAL DRAWINGS

TYPICAL SECTION DRAWINGS

(SolarWall)

TYPICAL SECTION DRAWINGS

(SolarWall)

TYPICAL SECTION DRAWINGS

(SolarWall)

File details come from the government source that posted it. Updated .