Item 0001 Project Drawings.pdf
PDF 12 MB Posted
- Attached to
- Repair Fire Suppression System in WRM Warehouse Bldg#2462 and #2464, Osan AB (MATOC Work Plan)
- Solicitation number
- W90VN6-24-R-0026
About this file
This document is an Item 0001 Project Drawings file related to a federal contract opportunity issued by the Department of the Army Materiel Command Army Contracting Command to repair the fire suppression system in two warehouses at Osan Air Base.
The contract opportunity, identified as Solicitation Number W90VN6-24-R-0026, is a task order under a Multiple Award Task Order Contract (MATOC) where the contractor must develop a 100% plan and design and provide all necessary resources to complete the project. The scope of work is based on 30% concept design and as-built drawings and specifications provided by the government. The contract type is a Work Plan task order, which requires the contractor to submit a proposal. No other details about pricing, set-asides, or award dates are provided in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-001
E - 1 AS-BUILT DRAWINGS
E - 2 AS-BUILT DRAWINGS
E - 3 AS-BUILT DRAWINGS
E - 4 AS-BUILT DRAWINGS
S-001 STRUCTURAL NOTES - SHEET 1
S-102 ROOF STRENGTHENING PLAN
S-002 STRUCTURAL DETAILS - SHEET 2
S-501 STRUCTURAL DETAILS - SHEET 1
CIVIL
WATER LINE MAP
ELECTRICAL
(REFERENCE ONLY)
NOTE:
ALL DRAWING GRAPHIC SCALES SHOWN ARE FOR REFERENCE ONLY.
THESE MAY NOT BE COMPATIBLE WITH EACH DRAWING.
FP-101 FIRE SPRINKLER FLOOR PLAN
MECHANICAL
SOLAR AIR COLLECTOR ELEVATION
MECHANICAL
SOLAR AIR COLLECTOR ELEVATION
MECHANICAL
SOLAR AIR COLLECTOR ELEVATION
C 01
1378995880U Stamp c-001
W
AT
ER
L
IN
E
M
AP
WATER LINE MAP
1378995880U Stamp
1378995880U Rectangle
1378995880U Rectangle
1378995880U Typewritten Text
WATER LINE MAP
1378995880U Rectangle
1378995880U Polygon
1378995880U Typewritten Text
REPLACE W/ NEW
1378995880U Line
1378995880U Line
1378995880U Rectangle
1378995880U Typewritten Text
PIV
ASSEMBLY
Line
REMOVE EXST. MECH RM AND PROVIDE NEW MECH AND ELEC ROOM IAW SOW
REPLACE AND PROVIDE NEW DOOR PAD AND CONCRETE STOOP
NEW SSMR SYSTEM
Rectangle
1378995880U Typewritten Text
REPLACE W/ NEW SSMR SYSTEM
REPLACE EXIST. METAL ROOFING W/ NEW
STANDING SEAM METAL ROOF SYSTEM
REPLACE EXIST. OVERHEAD
COILING DOOR W/ NEW ONE REPLACE EXIST. OVERHEAD
COILING DOOR W/ NEW ONE
REPLACE EXIST. METAL ROOFING W/ NEW
STANDING SEAM METAL ROOF SYSTEM
REPLACE EXIST. METAL ROOFING W/ NEW
STANDING SEAM METAL ROOF SYSTEM
PROVIDE NEW
MECH RM AND
ELEC RM
E4
FP101
150.00ø
DV
DV
100.00ø
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
Remote Area Name Most Remote Sprinkler Zone Occupancy Classification Ordinary Group I Density 0.14 l/s*m2
Total Hose Streams 950 lpm Flowing Heads 30 Sprinkler Heads K-Factor 8.0 Total Water Required 4299.361 lpm Total Pressure Required 342.464 kPa Safety Margin +113.63 kPa
50.00ø
50.00ø
50.00ø
50.00ø
150.00ø 150.00ø
150.00ø
150.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
150.00ø
AREA B DRY SPRINKLER ZONE
ESTIMATED VOLUME: 2967 L
AREA A DRY SPRINKLER ZONE
ESTIMATED VOLUME: 2899 L
F F
F
F
D
SP
D
SP
D
SP
D
SP
D
SP
D
SP
D
SP
D
SP
FF
FF
TEST
UG
200.00ø
DSPFD
C
TH
FDCFDCFDC
150.00ø
DV
DV
100.00ø
DSPFD
C
TH
FP101
FL
O
O R
P
LA
N
FI
R E
Scale: 1:200
FIRE PROTECTION FLOOR PLANA2
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
A1
W
2U M
-1 0-
D -0
W
2U M
-2 0-
F-
N
O
VE
M
BE
R , 2
U N
IT
AP
O A
P
1-
FA
R
E
AS
T D
IS
TR
IC
T
R
EP
AI
R
W R
M W
AR
EH
O U
SE
, B
U
IL
D
IN
G
O
SA
N A
IR
B
AS
E, K O
R
EA
100% SUBMITTAL
T.
SU
LL
IV
AN
N .N
G U
YE
N
B.
BU
R D
IC
K
M .A
AB
Y
1. SEE SHEETS FP001 AND FP002 FOR FIRE PROTECTION
GENERAL NOTES, LEGEND, AND DETAILS.
2. ORDINARY HAZARD AREA. SPRINKLER DENSITY =
K-8.0, 0.14L/S*M2 (0.2 GPM/SQ. FT). OVER 325M2 (3,500
SQ. FT).
3. NEW DRY PIPE SPRINKLER SYSTEMS MUST UTILIZE
NITROGEN GENERATION SYSTEMS IN ACCORDANCE
WITH UFC 3-600-01, SECTIONS 9-7.7 AND 9-7.9
4. PROVIDE EMERGENCY LIGHTING FOR MECHANICAL
ROOM. REFER TO ELECTRICAL PLANS.
5. MECHANICAL AND ELECTRICAL ROOM SHALL BE
PROTECTED BY UPRIGHT SPRINKLERS.
6. SYSTEM SIZE SHALL BE SUCH THAT INITIAL WATER IS
DISCHARGED FROM THE SYSTEM TEST CONNECTION
IN NOT MORE THAN 60 SECONDS STARTING AT THE
NORMAL NITROGEN PRESSURE ON THE SYSTEM SIDE
AND AT THE TIME OF FULLY OPENED INSPECTION
TEST CONNECTION (TO BE LOCATED AT THE
FURTHEST POINT FROM THE MAIN VALVE) IN
ACCORDANCE WITH UFC 3-600-01 SECTION 9-7.9.2.
CONTRACTOR TO VERIFY WATER DELIVERY TIME.
(THE USE OF A QUICK-OPENING DEVICE IS ALLOWED.)
GENERAL NOTES:
KEYNOTES
1. CONNECTION TO EXISTING 200mm (8") FIRE SERVICE MAIN
2. NEW 150mm (6") DOUBLE CHECK BACKFLOW PREVENTER
ASSEMBLY WITH OS&Y VALVES WITH SUPERVISORY
SWITCHES. ASSEMBLY MUST BE LISTED FOR FIRE
PROTECTION USE AND VERTICAL (FLOW UP)
INSTALLATIONS. BACKFLOW PREVENTER TO BE INSTALLED
VERTICALLY SO THAT THE UPPER OPERATING
HANDWHEEL IS NO MORE THAN 1.8m ABOVE THE FINISHED
FLOOR IN ACCORDANCE WITH UFC 3-600-01 SECTION
9-6.6.2.3.
3. 100mm (4") FDC CHECK VALVE WITH AUTO BALL DRIP.
4. 2-WAY, SQUARE PATTERN FLUSH-MOUNTED FDC. PROVIDE
SIGNAGE ABOVE FDC INDICATING IT SERVES THE
WAREHOUSE ONLY.
5. NITROGEN GENERATOR FOR DRY PIPE VALVE ASSEMBLY
W/ BUILT-IN AIR COMPRESSOR AND AIR MAINTENANCE
DEVICE. REFER TO SHEET FP001 FOR FURTHER
INFORMATION.
6. TO DRY SPRINKLER ZONE 1.
7. TO DRY SPRINKLER ZONE 2.
8. NEW SKYLIGHT-TYPICAL OF 8 LOCATIONS. HIGH
TEMPERATURE SPRINKLERS SHALL BE INSTALLED IN THE
SKYLIGHTS. SEE A104 FOR DIMENSIONS
9. DOWN TO TEST CONNECTION AND LOW POINT DRAIN
10. EXISTING UNDERGROUND PIPE APPROXIMATELY 60960MM
(200 FT) TO FIRE HYDRANT
11. TEST HEADER FOR FULL FORWARD FLOW OF THE
BACKFLOW PREVENTER.
Scale: 1:20
ENLARGED MECHANICAL ROOME4
0 4 8m
0 0.5 1m
NOTE:
1. THE FIRE SPRINKER SYSTEM ROUTING AND PIPE SIZES
SHOWN ARE CONCEPTUAL FOR IGCE PURPOSE ONLY. THE
CONTRACTOR SHALL SUBMIT THE DETAILED SHOP
DRAWINGS AND THE DESIGN ANALYSIS TO GOVERNMENT
FOR APPROVAL PRIOR TO CONSTRUCTION.
2. THE EQUIPMENT ARE SHOWN IN SUGGESTED
LOCATIONS, FINAL QUANTITY AND LAYOUT SHALL BE IN
ACCORDANCE WITH APPLICABLE CODES,
MANUFACTURER'S RECOMMENDATIONS AND
EQUIPMENT LISTINGS.
NOTES
1. PROVIDED FIRE ALARM DRAWINGS ARE FOR REFERENCE ONLY.
CONTRACTOR MUST UPDATE AND DELVELOP FIRE ALRM DRAWINGS AS
NEW PLAN AND WORK.
3. REFER THE SCOPE OF WORK FOR REQUIREMENT.
INSTALL SOLAR AIR HEATER COLLECTOR
w/ CORRUGATED POLYCARBONATE PANEL
70M X 4M APPROX.
TYPICAL DRAWINGS
TYPICAL SECTION DRAWINGS
(SolarWall)
TYPICAL SECTION DRAWINGS
(SolarWall)
TYPICAL SECTION DRAWINGS
(SolarWall)
File details come from the government source that posted it. Updated .