Item 0002 Project Drawings.pdf
PDF 13 MB Posted
- Attached to
- Repair Fire Suppression System in WRM Warehouse Bldg#2462 and #2464, Osan AB (MATOC Work Plan)
- Solicitation number
- W90VN6-24-R-0026
About this file
This document is a set of project drawings related to a federal contract opportunity for the repair of the fire suppression system in two WRM warehouses at Osan Air Base. The contract is a Work Plan task order issued under a Multiple Award Task Order Contract (MATOC) by the Army Contracting Command. The contractor will be responsible for developing a 100% plan and design, as well as providing all management, labor, materials, and other resources necessary to complete the project based on the 30% concept design and scope of work provided. The project is described in general terms, and the contractor must follow the drawings and specifications in Appendices A and B. This document does not contain further details on the specific products or services required, response dates, award dates, pricing terms, or set asides.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-001 SOLAR AIR COLLECTOR ELEVATION
E - 1 AS-BUILT DRAWINGS
E - 2 AS-BUILT DRAWINGS
E - 3 AS-BUILT DRAWINGS
E - 4 AS-BUILT DRAWINGS
S-001 STRUCTURAL NOTES - SHEET 1
S-102 ROOF STRENGTHENING PLAN
S-002 STRUCTURAL DETAILS - SHEET 2
S-501 STRUCTURAL DETAILS - SHEET 1
STRUCTURAL
MECHANICAL
ELECTRICAL
(REFERENCE ONLY)
NOTE:
ALL DRAWING GRAPHIC SCALES SHOWN ARE FOR REFERENCE ONLY.
THESE MAY NOT BE COMPATIBLE WITH EACH DRAWING.
C-001 WATER LINE MAP
CIVIL
1378995880U Line c-001
W
AT
ER
L
IN
E
M
AP
WATER LINE MAP
1378995880U Stamp
1378995880U Rectangle
1378995880U Rectangle
1378995880U Typewritten Text
WATER LINE MAP
1378995880U Rectangle
1378995880U Polygon
1378995880U Typewritten Text
REPLACE W/ NEW
1378995880U Line
1378995880U Line
1378995880U Rectangle
1378995880U Typewritten Text
PIV
ASSEMBLY
Line
REMOVE EXST. MECH RM AND PROVIDE NEW MECH AND ELEC ROOM IAW SOW
REPLACE AND PROVIDE NEW DOOR PAD AND CONCRETE STOOP
Rectangle
REMOVE/REPLACE EXST METAL ROOFING,
INSUL AND WIRE MESH W/ NEW SSMR SYSTEM
REPLACE W/ NEW SSMR SYSTEM
REPLACE W/ NEW SSMR SYSTEM
REPLACE W/ NEW OVERHEAD
COILING DOOR
REPLACE W/ NEW OVERHEAD
COILING DOOR
REPLACE EXIST. METAL ROOFING W/ NEW
STANDING SEAM METAL ROOF SYSTEM
E4
FP101
150.00ø
DV
DV
100.00ø
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
Remote Area Name Most Remote Sprinkler Zone Occupancy Classification Ordinary Group I Density 0.14 l/s*m2
Total Hose Streams 950 lpm Flowing Heads 30 Sprinkler Heads K-Factor 8.0 Total Water Required 4299.361 lpm Total Pressure Required 342.464 kPa Safety Margin +113.63 kPa
50.00ø
50.00ø
50.00ø
50.00ø
150.00ø 150.00ø
150.00ø
150.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
50.00ø
150.00ø
AREA B DRY SPRINKLER ZONE
ESTIMATED VOLUME: 2967 L
AREA A DRY SPRINKLER ZONE
ESTIMATED VOLUME: 2899 L
F F
F
F
D
SP
D
SP
D
SP
D
SP
D
SP
D
SP
D
SP
D
SP
FF
FF
TEST
UG
200.00ø
DSPFD
C
TH
FDCFDCFDC
150.00ø
DV
DV
100.00ø
DSPFD
C
TH
FP101
FL
O
O R
P
LA
N
FI
R E
Scale: 1:200
FIRE PROTECTION FLOOR PLANA2
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
A
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
A1
W
2U M
-1 0-
D -0
W
2U M
-2 0-
F-
N
O
VE
M
BE
R , 2
U N
IT
AP
O A
P
1-
FA
R
E
AS
T D
IS
TR
IC
T
100% SUBMITTAL
T.
SU
LL
IV
AN
N .N
G U
YE
N
B.
BU
R D
IC
K
M .A
AB
Y
1. SEE SHEETS FP001 AND FP002 FOR FIRE PROTECTION
GENERAL NOTES, LEGEND, AND DETAILS.
2. ORDINARY HAZARD AREA. SPRINKLER DENSITY =
K-8.0, 0.14L/S*M2 (0.2 GPM/SQ. FT). OVER 325M2 (3,500
SQ. FT).
3. NEW DRY PIPE SPRINKLER SYSTEMS MUST UTILIZE
NITROGEN GENERATION SYSTEMS IN ACCORDANCE
WITH UFC 3-600-01, SECTIONS 9-7.7 AND 9-7.9
4. PROVIDE EMERGENCY LIGHTING FOR MECHANICAL
ROOM. REFER TO ELECTRICAL PLANS.
5. MECHANICAL AND ELECTRICAL ROOM SHALL BE
PROTECTED BY UPRIGHT SPRINKLERS.
6. SYSTEM SIZE SHALL BE SUCH THAT INITIAL WATER IS
DISCHARGED FROM THE SYSTEM TEST CONNECTION
IN NOT MORE THAN 60 SECONDS STARTING AT THE
NORMAL NITROGEN PRESSURE ON THE SYSTEM SIDE
AND AT THE TIME OF FULLY OPENED INSPECTION
TEST CONNECTION (TO BE LOCATED AT THE
FURTHEST POINT FROM THE MAIN VALVE) IN
ACCORDANCE WITH UFC 3-600-01 SECTION 9-7.9.2.
CONTRACTOR TO VERIFY WATER DELIVERY TIME.
(THE USE OF A QUICK-OPENING DEVICE IS ALLOWED.)
GENERAL NOTES:
KEYNOTES
1. CONNECTION TO EXISTING 200mm (8") FIRE SERVICE MAIN
2. NEW 150mm (6") DOUBLE CHECK BACKFLOW PREVENTER
ASSEMBLY WITH OS&Y VALVES WITH SUPERVISORY
SWITCHES. ASSEMBLY MUST BE LISTED FOR FIRE
PROTECTION USE AND VERTICAL (FLOW UP)
INSTALLATIONS. BACKFLOW PREVENTER TO BE INSTALLED
VERTICALLY SO THAT THE UPPER OPERATING
HANDWHEEL IS NO MORE THAN 1.8m ABOVE THE FINISHED
FLOOR IN ACCORDANCE WITH UFC 3-600-01 SECTION
9-6.6.2.3.
3. 100mm (4") FDC CHECK VALVE WITH AUTO BALL DRIP.
4. 2-WAY, SQUARE PATTERN FLUSH-MOUNTED FDC. PROVIDE
SIGNAGE ABOVE FDC INDICATING IT SERVES THE
WAREHOUSE ONLY.
5. NITROGEN GENERATOR FOR DRY PIPE VALVE ASSEMBLY
W/ BUILT-IN AIR COMPRESSOR AND AIR MAINTENANCE
DEVICE. REFER TO SHEET FP001 FOR FURTHER
INFORMATION.
6. TO DRY SPRINKLER ZONE 1.
7. TO DRY SPRINKLER ZONE 2.
8. NEW SKYLIGHT-TYPICAL OF 8 LOCATIONS. HIGH
TEMPERATURE SPRINKLERS SHALL BE INSTALLED IN THE
SKYLIGHTS. SEE A104 FOR DIMENSIONS
9. DOWN TO TEST CONNECTION AND LOW POINT DRAIN
10. EXISTING UNDERGROUND PIPE APPROXIMATELY 60960MM
(200 FT) TO FIRE HYDRANT
11. TEST HEADER FOR FULL FORWARD FLOW OF THE
BACKFLOW PREVENTER.
Scale: 1:20
ENLARGED MECHANICAL ROOME4
0 4 8m
0 0.5 1m
NOTE:
1. THE FIRE SPRINKER SYSTEM ROUTING AND PIPE SIZES
SHOWN ARE CONCEPTUAL FOR IGCE PURPOSE ONLY. THE
CONTRACTOR SHALL SUBMIT THE DETAILED SHOP
DRAWINGS AND THE DESIGN ANALYSIS TO GOVERNMENT
FOR APPROVAL PRIOR TO CONSTRUCTION.
2. THE EQUIPMENT ARE SHOWN IN SUGGESTED
LOCATIONS, FINAL QUANTITY AND LAYOUT SHALL BE IN
ACCORDANCE WITH APPLICABLE CODES,
MANUFACTURER'S RECOMMENDATIONS AND
EQUIPMENT LISTINGS.
Stamp
NOTES
1. PROVIDED FIRE ALARM DRAWINGS ARE FOR REFERENCE ONLY.
CONTRACTOR MUST UPDATE AND DELVELOP FIRE ALRM DRAWINGS AS
NEW PLAN AND WORK.
3. REFER THE SCOPE OF WORK FOR REQUIREMENT.
INSTALL SOLAR AIR HEATER COLLECTOR
w/ CORRUGATED POLYCARBONATE PANEL
70M X 4M APPROX.
Rectangle
TYPICAL DRAWINGS
TYPICAL SECTION DRAWINGS
(SolarWall)
File details come from the government source that posted it. Updated .