Remove and replace existing R-22 Freon using Air Condition (AC) units

Closed Solicitation Posted

Solicitation number
70CMSW21Q00000017
Agency
Immigration and Customs Enforcement Department of Homeland Security
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
4120 Air Conditioning Equipment
Place of performance
Florence, Arizona 85132, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks quotes to remove and replace existing R-22 air conditioning units at the Florence Detention Center in Florence, Arizona for Immigration and Customs Enforcement. The contractor will remove four 7.5-ton, two 4-ton, and two 5-ton jail units and ten 7.5-ton pod units, reconfiguring two jail units and replacing 28 additional units ranging from 3 to 12.5 tons. The contractor must integrate new energy management controllers and fans into the existing Niagra building management system. Quotes will be evaluated on technical approach and price, and are due by August 18, 2021. The award will be a firm-fixed-price purchase order not to exceed six months.

This is a total small business set-aside. The NAICS code is 238220 and PSC code R499. Work will take place at the Florence Detention Center and includes removing and replacing the specified AC units over a period not exceeding six months. Prevailing wage rates for Pinal County, Arizona crafts will apply.

Notice text

Remove and replace Jail Units - (4ea) 7.5-ton, (2ea) 4-ton, and (2ea) 5-ton package gas electric units and adapter curbs.

• Remove and replace Pod Units A,B,C,D,E – (10ea) 7.5-ton package gas electric 2 stage high efficiency units and adapter curbs.

• The Jail units 3 & 4 need to be re-configured to avoid intake and discharge of air into each other.

• Relocate and replace the jail POD disconnects to the outside of the surrounding wall and replace all other disconnects.

• Remove and replace 28 AC units and air handling units . The units range from 3-12.5 ton, an inventory list will be provided upon request.

• Crane up new units with new adapter curbs for all roof mounted units. Verify ground units accessibility and provide quotes accordingly.

• Install new A/C whips to each unit.

• Install new gas flex to each unit where applicable.

Check conduit for good condition and reuse. Replace if necessary.

• Install energy management controllers with discharge air sensors, fan/compressor stats, tie into existing system to Building Management Systems, install Wi-Fi routers and hard wire units on roof with new space temp stainless steel plates. The existing BMS is Niagra by Tritium Bacnet to interface. The final integration of this system must be coordinated by onsite ICE staff and local servicing contractor.

Contractor shall pass along any applicable manufacturer and installer warranty to the Government .

Attachments

Files attached to this notice, newest first
File Type Posted
RFQ Letter - Replace AC Units - Final .pdf PDF
Attachment 2_Wage Determination.pdf PDF
Attachment 1_SOW - AC Replacement - Final.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity