Refurbish 138 KV OCB Breaker

Closed Solicitation Posted

Solicitation number
FY265281014
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

PSC
5925 Circuit Breakers
Place of performance
Del Rio, Texas 78840, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The International Boundary and Water Commission seeks a price quote for refurbishment of a 138 KV Oil Circuit Breaker, with offers due June 19, 2026 at 3:00 PM Mountain Time and questions due by 3:00 PM Mountain on June 15. This is a 100% small business set-aside; only small businesses are eligible. The solicitation number is FY265281014, issued as a request for quote under FAR Subpart 12.6 commercial items procedures.

Place of performance is the IBWC Amistad Field Office at 670 Texas Spur 349, Del Rio, Texas 78840, situated on U.S. property adjacent to the U.S.-Mexico border. Work must be completed within 180 calendar days after contract award, with work hours restricted to 7:00 AM through 3:30 PM, Monday through Friday, except federal holidays.

The scope includes comprehensive assessment and maintenance, replacement of the air compressor, oil change with proper disposal, replacement of electrical contact boards and all pneumatic and mechanical parts as necessary, sandblasting and painting the enclosure, insulation resistance testing (megger testing) on communication and signal wires, current transformer and bushing testing per IEEE standards, replacement of heaters and moisture protection devices, removal and disposal of existing dielectric oil, installation of new insulator oil with high dielectric strength, and replacement of mechanical hardware connectors. The contractor must provide all personnel, equipment, supplies, materials, supervision, and transportation, and bears sole responsibility for permits, regulatory compliance with OSHA standards and electrical codes (IEEE NESC, NFPA 70-2017), site safety and security, waste disposal, and identification and proper handling of hazardous materials including asbestos-containing fabric sheath wiring.

Deliverables include a project schedule due within seven calendar days of award, licenses and certifications for electrical engineers and installers, material and equipment certifications complying with the Buy American Act, a Job Safety Analysis form, an installation procedure plan, and a two-year warranty on all work. Payment is lump-sum with progress payments tied to a Schedule of Values; invoices are submitted electronically to invoices@ibwc.gov in PDF format. The NAICS code is 335313, Switchgear and Switchboard Apparatus Manufacturing, with a small business size standard of 1,250 employees. Award will be made to the lowest price, technically acceptable, responsible offeror. Offers must include an active UEI#, completed price sheet, and be submitted via email in PDF format to angelica.baca@ibwc.gov; faxed quotes will not be accepted. In-person site visits are encouraged and should be scheduled by June 10. Applicable Service Contract Act wage determinations and FAR clauses including Buy American provisions, equal opportunity, and trafficking-in-persons restrictions apply.

Notice text

5 versions

Update #5 · Latest ·

This is a combined synopsis/solicitation for commercial items in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued separately.

The solicitation number is FY265281014 and this solicitation is issued as a request for quote (RFQ).

This is a 100% Small business Set Aside. The associated North American Industry Classification System (NAICS) code is 335313 Switchgear and Switchboard Apparatus Manufacturing with a corresponding small business standard of 1,250 employees.

Only offers from small businesses will be considered for this solicitation.

Offer due date/local time: 3:00 PM Mountain on June 19, 2026. Please reference the solicitation number FY265281014 in the subject line. PDF format is preferred.

Offers shall be emailed to angelica.baca@ibwc.gov. FAXED QUOTES WILL NOT BE ACCEPTED.

Active Unique Entity ID (UEI#) shall be included with your offer.

Price Sheet shall be included with your quote.

Only questions submitted by email to angelica.baca@ibwc.gov will be considered. Questions received from Offerors after 3:00 pm Mountain on June15, 2026, may not be responded to.

Contractors are highly encouraged to attend an agency organized site visit. Site visits may be scheduled with Mr.  Juan Escobar at juan.escobar@ibwc.gov or Evelio Siller at Evelio.siller@ibwc.gov. Virtual site visits (video/photographs) are not permitted.

Site visits should be scheduled for NLT June 10, 2026.

Description: The International Boundary and Water Commission is seeking a price quote for Refurbish Breakers as per SOW attached, for the IBWC Amistad Field Office located at 670 Texas Spur 349, Del Rio, TX 78840.

The Contractor shall complete work within 180 calendar days after the contract has been awarded.

The government will award to the lowest price, technically acceptable, responsible offeror. The Contractor shall provide all labor, material, equipment, subcontract, supervision, and management to perform the requirements of this Statement of Work (SOW).      

The Government will award a contract resulting from this solicitation to the responsible Offeror based on Lowest Price Technically Acceptable. Technical acceptability will be based on the Contractor’s Technical Approach, Expertise and Qualified Personnel to provide the services, and Past Performance.

Technical Approach - Quote must demonstrate the technical approach by providing a narrative addressing all the items in the scope. The narrative shall at a minimum include your plan of action, equipment, key team members, and schedule.

Past Performance – Quotes shall demonstrate successful past performance of at least 3 three (3) references for similar projects. The information shall include name of person, company, phone number, email address, and brief description of the project.

Offerors shall meet or exceed and specifications and scope of work of items being quoted.

Failure to submit required technical approach, past performance and Price Sheet form will deem a proposal non-responsive and no consideration for award will be given.

Offerors shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer. NOTE: The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) website accessed through http://www.acuisition.gov.

INVOICE PROCESSING PLATFORM

The U.S. Section International Boundary and Water Commission (USIBWC) has transitioned to an electronic invoicing system. The Invoice Processing Platform (IPP) is a secure, web-based system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis. IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.

Information concerning accessing the IPP system will be provided at time of award.

END of combined synopsis/solicitation.  

Attachments:

Performance Work Statement

Price Sheet

Applicable Provisions and Clauses

Wage Determination

5/28/26 Modification 001 - Submit Updated PWS, and 4 OCB attachments.

See Q&As as follows:

  1. Asbestos handling responsibility. PWS § 3.4 notes approximately 30% non-friable asbestos in legacy control wiring. Please confirm: (a) is asbestos abatement included in contractor scope? (b) Is the contractor expected to provide AHERA-trained personnel and a Texas-licensed asbestos disposal facility? (c) Or does USIBWC coordinate this work through a standing abatement contract? Any Asbestos Work shall be included in your submittal, but at this time we didn’t find any material with Asbestos on this Breaker  
  2. Re-energization scope. PWS § 2.1.O states IBWC personnel perform the electrical clearance and lockout-tagout. Please confirm the contractor’s scope ends at functional verification per § 2.3, and IBWC’s qualified personnel perform the final re-energization of the 138 kV OCB.. IBWC Personnel will de-energize and lock/tag out the equipment, but Contractor can install their own locks too. IBWC Personnel will energize the OCB Breaker after the project is completed.
  3. Dielectric oil — volume and disposal. Approximate volume of existing dielectric oil to be drained from the OCB tank (in gallons), and any IBWC-preferred or required Texas-licensed used-oil disposal facility. Information of amount of oil gallons shall be founded in the manual,   and Oil Disposal or any material will required to be required to follow the current standards.  

Schedule

  1. Outage window. The 138 kV OCB is identified as critical equipment (PWS § 3.1). What outage window does IBWC envision for the disassembly, refurbishment, and re-installation phases? Are there seasonal or Rio Grande operational constraints (e.g., irrigation demand cycle) that dictate timing? The outage time and date will be determined after the contract is awarded based on power production and maintenance schedule for the facility
  2. 180-day period of performance clock. Does the 180 calendar days run from contract award / Notice to Proceed, or from a specific milestone? Given typical HV breaker refurbishment-grade parts lead times of 8–16 weeks, please clarify any flexibility around the parts-procurement phase. At this time, this project is schedule for 180 days, but we’re flexible to extend it, as necessary.

6/4/26 M002 - Submit attachment with "close-up photographs" and see Q&As below.

1. Concerning the Air Compressor Scope referenced in PWS §1.4 and §2.1.D, please disregard the instruction in PWS §1.4, which lists "replace air compressor" as a refurbishment objective. Likewise, set aside the directive in PWS §2.1.D that instructs the Contractor to purchase and install a new air compressor within the 138 KV OCB Breaker enclosure. Instead, kindly refer to the McGraw-Edison Type AHF-54 manufacturer service literature (Instruction S290-50-1, "Type OA-3 Hydraulic Operating Mechanism"). This documentation specifies that the operating mechanism is hydraulic and utilizes a motor-driven pump alongside a nitrogen-pre-charged accumulator for storing and releasing operating energy.

2. Regarding the Scope of Work—Assessment versus Combined Assessment-and-Execution: Please disregard PWS §2.1.A through §2.1.C, which outline assessment activities such as inspection of current conditions, preparation of a maintenance plan report, and compilation of a parts list (including description, brand, lead time, manufacturer, supplier name, and location). Similarly, disregard PWS §2.1.D, E, G, & M, which pertain to execution activities including the purchase and installation of a new air compressor. Instead, proceed with PWS §2.1.F, H, I, J, K, L, & N, covering execution tasks such as removal and disposal of dielectric oil, procurement and installation of new dielectric oil, purchasing and application of sandblast media, purchasing and application of epoxy paint, and replacement of electrical components, contact boards, pneumatic and hydraulic parts, as well as mechanical parts within the OCB Control Cabinet. Please note that this does not include 138 KV bushing hardware. Regarding PWS §2.1.I, submittals and conditions for parts procurement under these execution activities should be presented for Plant Superintendent approval.

3. The Image Binder posted by the Government on May 29, 2026 includes site photographs of the three OCB tanks and the operating mechanism cabinet. Page 14 of the Binder shows the control cabinet interior with the Gould Pump motor and the Parker Hannifin nitrogen-precharged accumulator visible, but the pump and motor nameplate detail is not legible in the available image. AEEI requires the pump and motor model number, horsepower rating, voltage, RPM, and serial number to source replacement service parts (seals, bearings, drive coupling, pressure-relief assemblies) and to determine whether the Gould motor and the pump are catalog or OEM-rebuild items. Could the Government provide a close-up photograph of the OA-3 operating mechanism pump and motor nameplate (and any associated tags on the pump body or pressure-relief block)? If the nameplate is illegible or missing, a written transcription of any visible model, serial, and rating information would be acceptable.

Attached close-up photographs of the OA-3 Hydraulic Pump/Motor nameplate as requested.

4. PWS §2.1.M references replacement of control wiring runs; PWS §3.4 identifies approximately 30% non-friable asbestos content in the legacy fabric-sheath control wiring requiring AHERA-credentialed handling and abatement. The Image Binder does not provide a measured cable-run distance between the OCB local control panel at the dam apron and the main control room equipment to which the control circuits land. Could the Government provide the approximate one-way cable-run distance (in linear feet) between the OCB local control panel and the main control room termination equipment? An estimate to the nearest 25 feet is sufficient. This information is required to size the control wiring takeoff for pricing, to estimate asbestos abatement scope per PWS §3.4, and to assess whether the legacy raceways can be reused.

The cable-run distance from the OCB Control Panel to the Main Control Room Equipment is, according to the prints, 730 feet.

6/9/26 M003 - Does USIBWC have any prior testing records on PCB content of the dielectric oil inside the 138 kV OCB? If so, AEEI would appreciate a copy of the report or test results.

The reason for the ask: Our tech has expressed concern about performing work on oil that may test positive for PCBs (worker safety, OSHA exposure protocol, insurance implications). Knowing the PCB content up front would let AEEI structure the disposal pathway and crew protocols correctly at bid submission rather than carrying a PCB-positive baseline assumption.

Response:  Attached are some oil test reports from 2007 & 92 conducted on the OCB Breaker 9635.See "OCB Breaker Oil Test Report by STEC" (OCB Breaker Oil Test Report by STEC)

6/15/26 M004 - Q&As Below:

There are two potential paths your customer should consider.

  1. Upgrade the existing breaker to a new or remanufactured SF6 breaker solution.
  2. Perform a partial refurbishment of the existing oil circuit breaker.

If vendors are willing to submit both proposals, but we only have the funds for the refurbish for FY26.

3. PCBs or PCB Testing - 

Polychlorinated biphenyls (PCBs) were frequently used in the insulating and arc-quenching oil of Oil Circuit Breakers (OCBs) manufactured before July 2, 1979. Because PCBs are highly toxic and bioaccumulate, their use was banned. Identifying and handling PCB-contaminated OCBs requires strict regulatory compliance and specialized disposal.

The US Environmental Protection Agency (EPA) strictly regulates electrical equipment manufactured before the 1979 ban.

  • Assumption Rules: Under 40 CFR Part 761, you must assume any mineral oil-filled electrical equipment manufactured before July 2, 1979, is contaminated with PCBs. Equipment manufactured after this date is assumed to be non-PCB (< 50
Update #4 ·

This is a combined synopsis/solicitation for commercial items in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued separately.

The solicitation number is FY265281014 and this solicitation is issued as a request for quote (RFQ).

This is a 100% Small business Set Aside. The associated North American Industry Classification System (NAICS) code is 335313 Switchgear and Switchboard Apparatus Manufacturing with a corresponding small business standard of 1,250 employees.

Only offers from small businesses will be considered for this solicitation.

Offer due date/local time: 3:00 PM Mountain on June 19, 2026. Please reference the solicitation number FY265281014 in the subject line. PDF format is preferred.

Offers shall be emailed to angelica.baca@ibwc.gov. FAXED QUOTES WILL NOT BE ACCEPTED.

Active Unique Entity ID (UEI#) shall be included with your offer.

Price Sheet shall be included with your quote.

Only questions submitted by email to angelica.baca@ibwc.gov will be considered. Questions received from Offerors after 3:00 pm Mountain on June15, 2026, may not be responded to.

Contractors are highly encouraged to attend an agency organized site visit. Site visits may be scheduled with Mr.  Juan Escobar at juan.escobar@ibwc.gov or Evelio Siller at Evelio.siller@ibwc.gov. Virtual site visits (video/photographs) are not permitted.

Site visits should be scheduled for NLT June 10, 2026.

Description: The International Boundary and Water Commission is seeking a price quote for Refurbish Breakers as per SOW attached, for the IBWC Amistad Field Office located at 670 Texas Spur 349, Del Rio, TX 78840.

The Contractor shall complete work within 180 calendar days after the contract has been awarded.

The government will award to the lowest price, technically acceptable, responsible offeror. The Contractor shall provide all labor, material, equipment, subcontract, supervision, and management to perform the requirements of this Statement of Work (SOW).      

The Government will award a contract resulting from this solicitation to the responsible Offeror based on Lowest Price Technically Acceptable. Technical acceptability will be based on the Contractor’s Technical Approach, Expertise and Qualified Personnel to provide the services, and Past Performance.

Technical Approach - Quote must demonstrate the technical approach by providing a narrative addressing all the items in the scope. The narrative shall at a minimum include your plan of action, equipment, key team members, and schedule.

Past Performance – Quotes shall demonstrate successful past performance of at least 3 three (3) references for similar projects. The information shall include name of person, company, phone number, email address, and brief description of the project.

Offerors shall meet or exceed and specifications and scope of work of items being quoted.

Failure to submit required technical approach, past performance and Price Sheet form will deem a proposal non-responsive and no consideration for award will be given.

Offerors shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer. NOTE: The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) website accessed through http://www.acuisition.gov.

INVOICE PROCESSING PLATFORM

The U.S. Section International Boundary and Water Commission (USIBWC) has transitioned to an electronic invoicing system. The Invoice Processing Platform (IPP) is a secure, web-based system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis. IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.

Information concerning accessing the IPP system will be provided at time of award.

END of combined synopsis/solicitation.  

Attachments:

Performance Work Statement

Price Sheet

Applicable Provisions and Clauses

Wage Determination

5/28/26 Modification 001 - Submit Updated PWS, and 4 OCB attachments.

See Q&As as follows:

  1. Asbestos handling responsibility. PWS § 3.4 notes approximately 30% non-friable asbestos in legacy control wiring. Please confirm: (a) is asbestos abatement included in contractor scope? (b) Is the contractor expected to provide AHERA-trained personnel and a Texas-licensed asbestos disposal facility? (c) Or does USIBWC coordinate this work through a standing abatement contract? Any Asbestos Work shall be included in your submittal, but at this time we didn’t find any material with Asbestos on this Breaker  
  2. Re-energization scope. PWS § 2.1.O states IBWC personnel perform the electrical clearance and lockout-tagout. Please confirm the contractor’s scope ends at functional verification per § 2.3, and IBWC’s qualified personnel perform the final re-energization of the 138 kV OCB.. IBWC Personnel will de-energize and lock/tag out the equipment, but Contractor can install their own locks too. IBWC Personnel will energize the OCB Breaker after the project is completed.
  3. Dielectric oil — volume and disposal. Approximate volume of existing dielectric oil to be drained from the OCB tank (in gallons), and any IBWC-preferred or required Texas-licensed used-oil disposal facility. Information of amount of oil gallons shall be founded in the manual,   and Oil Disposal or any material will required to be required to follow the current standards.  

Schedule

  1. Outage window. The 138 kV OCB is identified as critical equipment (PWS § 3.1). What outage window does IBWC envision for the disassembly, refurbishment, and re-installation phases? Are there seasonal or Rio Grande operational constraints (e.g., irrigation demand cycle) that dictate timing? The outage time and date will be determined after the contract is awarded based on power production and maintenance schedule for the facility
  2. 180-day period of performance clock. Does the 180 calendar days run from contract award / Notice to Proceed, or from a specific milestone? Given typical HV breaker refurbishment-grade parts lead times of 8–16 weeks, please clarify any flexibility around the parts-procurement phase. At this time, this project is schedule for 180 days, but we’re flexible to extend it, as necessary.

6/4/26 M002 - Submit attachment with "close-up photographs" and see Q&As below.

1. Concerning the Air Compressor Scope referenced in PWS §1.4 and §2.1.D, please disregard the instruction in PWS §1.4, which lists "replace air compressor" as a refurbishment objective. Likewise, set aside the directive in PWS §2.1.D that instructs the Contractor to purchase and install a new air compressor within the 138 KV OCB Breaker enclosure. Instead, kindly refer to the McGraw-Edison Type AHF-54 manufacturer service literature (Instruction S290-50-1, "Type OA-3 Hydraulic Operating Mechanism"). This documentation specifies that the operating mechanism is hydraulic and utilizes a motor-driven pump alongside a nitrogen-pre-charged accumulator for storing and releasing operating energy.

2. Regarding the Scope of Work—Assessment versus Combined Assessment-and-Execution: Please disregard PWS §2.1.A through §2.1.C, which outline assessment activities such as inspection of current conditions, preparation of a maintenance plan report, and compilation of a parts list (including description, brand, lead time, manufacturer, supplier name, and location). Similarly, disregard PWS §2.1.D, E, G, & M, which pertain to execution activities including the purchase and installation of a new air compressor. Instead, proceed with PWS §2.1.F, H, I, J, K, L, & N, covering execution tasks such as removal and disposal of dielectric oil, procurement and installation of new dielectric oil, purchasing and application of sandblast media, purchasing and application of epoxy paint, and replacement of electrical components, contact boards, pneumatic and hydraulic parts, as well as mechanical parts within the OCB Control Cabinet. Please note that this does not include 138 KV bushing hardware. Regarding PWS §2.1.I, submittals and conditions for parts procurement under these execution activities should be presented for Plant Superintendent approval.

3. The Image Binder posted by the Government on May 29, 2026 includes site photographs of the three OCB tanks and the operating mechanism cabinet. Page 14 of the Binder shows the control cabinet interior with the Gould Pump motor and the Parker Hannifin nitrogen-precharged accumulator visible, but the pump and motor nameplate detail is not legible in the available image. AEEI requires the pump and motor model number, horsepower rating, voltage, RPM, and serial number to source replacement service parts (seals, bearings, drive coupling, pressure-relief assemblies) and to determine whether the Gould motor and the pump are catalog or OEM-rebuild items. Could the Government provide a close-up photograph of the OA-3 operating mechanism pump and motor nameplate (and any associated tags on the pump body or pressure-relief block)? If the nameplate is illegible or missing, a written transcription of any visible model, serial, and rating information would be acceptable.

Attached close-up photographs of the OA-3 Hydraulic Pump/Motor nameplate as requested.

4. PWS §2.1.M references replacement of control wiring runs; PWS §3.4 identifies approximately 30% non-friable asbestos content in the legacy fabric-sheath control wiring requiring AHERA-credentialed handling and abatement. The Image Binder does not provide a measured cable-run distance between the OCB local control panel at the dam apron and the main control room equipment to which the control circuits land. Could the Government provide the approximate one-way cable-run distance (in linear feet) between the OCB local control panel and the main control room termination equipment? An estimate to the nearest 25 feet is sufficient. This information is required to size the control wiring takeoff for pricing, to estimate asbestos abatement scope per PWS §3.4, and to assess whether the legacy raceways can be reused.

The cable-run distance from the OCB Control Panel to the Main Control Room Equipment is, according to the prints, 730 feet.

6/9/26 M003 - Does USIBWC have any prior testing records on PCB content of the dielectric oil inside the 138 kV OCB? If so, AEEI would appreciate a copy of the report or test results.

The reason for the ask: Our tech has expressed concern about performing work on oil that may test positive for PCBs (worker safety, OSHA exposure protocol, insurance implications). Knowing the PCB content up front would let AEEI structure the disposal pathway and crew protocols correctly at bid submission rather than carrying a PCB-positive baseline assumption.

Response:  Attached are some oil test reports from 2007 & 92 conducted on the OCB Breaker 9635.See "OCB Breaker Oil Test Report by STEC" (OCB Breaker Oil Test Report by STEC)

Update #3 ·

This is a combined synopsis/solicitation for commercial items in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued separately.

The solicitation number is FY265281014 and this solicitation is issued as a request for quote (RFQ).

This is a 100% Small business Set Aside. The associated North American Industry Classification System (NAICS) code is 335313 Switchgear and Switchboard Apparatus Manufacturing with a corresponding small business standard of 1,250 employees.

Only offers from small businesses will be considered for this solicitation.

Offer due date/local time: 3:00 PM Mountain on June 19, 2026. Please reference the solicitation number FY265281014 in the subject line. PDF format is preferred.

Offers shall be emailed to angelica.baca@ibwc.gov. FAXED QUOTES WILL NOT BE ACCEPTED.

Active Unique Entity ID (UEI#) shall be included with your offer.

Price Sheet shall be included with your quote.

Only questions submitted by email to angelica.baca@ibwc.gov will be considered. Questions received from Offerors after 3:00 pm Mountain on June15, 2026, may not be responded to.

Contractors are highly encouraged to attend an agency organized site visit. Site visits may be scheduled with Mr.  Juan Escobar at juan.escobar@ibwc.gov or Evelio Siller at Evelio.siller@ibwc.gov. Virtual site visits (video/photographs) are not permitted.

Site visits should be scheduled for NLT June 10, 2026.

Description: The International Boundary and Water Commission is seeking a price quote for Refurbish Breakers as per SOW attached, for the IBWC Amistad Field Office located at 670 Texas Spur 349, Del Rio, TX 78840.

The Contractor shall complete work within 180 calendar days after the contract has been awarded.

The government will award to the lowest price, technically acceptable, responsible offeror. The Contractor shall provide all labor, material, equipment, subcontract, supervision, and management to perform the requirements of this Statement of Work (SOW).      

The Government will award a contract resulting from this solicitation to the responsible Offeror based on Lowest Price Technically Acceptable. Technical acceptability will be based on the Contractor’s Technical Approach, Expertise and Qualified Personnel to provide the services, and Past Performance.

Technical Approach - Quote must demonstrate the technical approach by providing a narrative addressing all the items in the scope. The narrative shall at a minimum include your plan of action, equipment, key team members, and schedule.

Past Performance – Quotes shall demonstrate successful past performance of at least 3 three (3) references for similar projects. The information shall include name of person, company, phone number, email address, and brief description of the project.

Offerors shall meet or exceed and specifications and scope of work of items being quoted.

Failure to submit required technical approach, past performance and Price Sheet form will deem a proposal non-responsive and no consideration for award will be given.

Offerors shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer. NOTE: The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) website accessed through http://www.acuisition.gov.

INVOICE PROCESSING PLATFORM

The U.S. Section International Boundary and Water Commission (USIBWC) has transitioned to an electronic invoicing system. The Invoice Processing Platform (IPP) is a secure, web-based system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis. IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.

Information concerning accessing the IPP system will be provided at time of award.

END of combined synopsis/solicitation.  

Attachments:

Performance Work Statement

Price Sheet

Applicable Provisions and Clauses

Wage Determination

5/28/26 Modification 001 - Submit Updated PWS, and 4 OCB attachments.

See Q&As as follows:

  1. Asbestos handling responsibility. PWS § 3.4 notes approximately 30% non-friable asbestos in legacy control wiring. Please confirm: (a) is asbestos abatement included in contractor scope? (b) Is the contractor expected to provide AHERA-trained personnel and a Texas-licensed asbestos disposal facility? (c) Or does USIBWC coordinate this work through a standing abatement contract? Any Asbestos Work shall be included in your submittal, but at this time we didn’t find any material with Asbestos on this Breaker  
  2. Re-energization scope. PWS § 2.1.O states IBWC personnel perform the electrical clearance and lockout-tagout. Please confirm the contractor’s scope ends at functional verification per § 2.3, and IBWC’s qualified personnel perform the final re-energization of the 138 kV OCB.. IBWC Personnel will de-energize and lock/tag out the equipment, but Contractor can install their own locks too. IBWC Personnel will energize the OCB Breaker after the project is completed.
  3. Dielectric oil — volume and disposal. Approximate volume of existing dielectric oil to be drained from the OCB tank (in gallons), and any IBWC-preferred or required Texas-licensed used-oil disposal facility. Information of amount of oil gallons shall be founded in the manual,   and Oil Disposal or any material will required to be required to follow the current standards.  

Schedule

  1. Outage window. The 138 kV OCB is identified as critical equipment (PWS § 3.1). What outage window does IBWC envision for the disassembly, refurbishment, and re-installation phases? Are there seasonal or Rio Grande operational constraints (e.g., irrigation demand cycle) that dictate timing? The outage time and date will be determined after the contract is awarded based on power production and maintenance schedule for the facility
  2. 180-day period of performance clock. Does the 180 calendar days run from contract award / Notice to Proceed, or from a specific milestone? Given typical HV breaker refurbishment-grade parts lead times of 8–16 weeks, please clarify any flexibility around the parts-procurement phase. At this time, this project is schedule for 180 days, but we’re flexible to extend it, as necessary.

6/4/26 M002 - Submit attachment with "close-up photographs" and see Q&As below.

1. Concerning the Air Compressor Scope referenced in PWS §1.4 and §2.1.D, please disregard the instruction in PWS §1.4, which lists "replace air compressor" as a refurbishment objective. Likewise, set aside the directive in PWS §2.1.D that instructs the Contractor to purchase and install a new air compressor within the 138 KV OCB Breaker enclosure. Instead, kindly refer to the McGraw-Edison Type AHF-54 manufacturer service literature (Instruction S290-50-1, "Type OA-3 Hydraulic Operating Mechanism"). This documentation specifies that the operating mechanism is hydraulic and utilizes a motor-driven pump alongside a nitrogen-pre-charged accumulator for storing and releasing operating energy.

2. Regarding the Scope of Work—Assessment versus Combined Assessment-and-Execution: Please disregard PWS §2.1.A through §2.1.C, which outline assessment activities such as inspection of current conditions, preparation of a maintenance plan report, and compilation of a parts list (including description, brand, lead time, manufacturer, supplier name, and location). Similarly, disregard PWS §2.1.D, E, G, & M, which pertain to execution activities including the purchase and installation of a new air compressor. Instead, proceed with PWS §2.1.F, H, I, J, K, L, & N, covering execution tasks such as removal and disposal of dielectric oil, procurement and installation of new dielectric oil, purchasing and application of sandblast media, purchasing and application of epoxy paint, and replacement of electrical components, contact boards, pneumatic and hydraulic parts, as well as mechanical parts within the OCB Control Cabinet. Please note that this does not include 138 KV bushing hardware. Regarding PWS §2.1.I, submittals and conditions for parts procurement under these execution activities should be presented for Plant Superintendent approval.

3. The Image Binder posted by the Government on May 29, 2026 includes site photographs of the three OCB tanks and the operating mechanism cabinet. Page 14 of the Binder shows the control cabinet interior with the Gould Pump motor and the Parker Hannifin nitrogen-precharged accumulator visible, but the pump and motor nameplate detail is not legible in the available image. AEEI requires the pump and motor model number, horsepower rating, voltage, RPM, and serial number to source replacement service parts (seals, bearings, drive coupling, pressure-relief assemblies) and to determine whether the Gould motor and the pump are catalog or OEM-rebuild items. Could the Government provide a close-up photograph of the OA-3 operating mechanism pump and motor nameplate (and any associated tags on the pump body or pressure-relief block)? If the nameplate is illegible or missing, a written transcription of any visible model, serial, and rating information would be acceptable.

Attached close-up photographs of the OA-3 Hydraulic Pump/Motor nameplate as requested.

4. PWS §2.1.M references replacement of control wiring runs; PWS §3.4 identifies approximately 30% non-friable asbestos content in the legacy fabric-sheath control wiring requiring AHERA-credentialed handling and abatement. The Image Binder does not provide a measured cable-run distance between the OCB local control panel at the dam apron and the main control room equipment to which the control circuits land. Could the Government provide the approximate one-way cable-run distance (in linear feet) between the OCB local control panel and the main control room termination equipment? An estimate to the nearest 25 feet is sufficient. This information is required to size the control wiring takeoff for pricing, to estimate asbestos abatement scope per PWS §3.4, and to assess whether the legacy raceways can be reused.

The cable-run distance from the OCB Control Panel to the Main Control Room Equipment is, according to the prints, 730 feet.

Update #2 ·

This is a combined synopsis/solicitation for commercial items in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued separately.

The solicitation number is FY265281014 and this solicitation is issued as a request for quote (RFQ).

This is a 100% Small business Set Aside. The associated North American Industry Classification System (NAICS) code is 335313 Switchgear and Switchboard Apparatus Manufacturing with a corresponding small business standard of 1,250 employees.

Only offers from small businesses will be considered for this solicitation.

Offer due date/local time: 3:00 PM Mountain on June 19, 2026. Please reference the solicitation number FY265281014 in the subject line. PDF format is preferred.

Offers shall be emailed to angelica.baca@ibwc.gov. FAXED QUOTES WILL NOT BE ACCEPTED.

Active Unique Entity ID (UEI#) shall be included with your offer.

Price Sheet shall be included with your quote.

Only questions submitted by email to angelica.baca@ibwc.gov will be considered. Questions received from Offerors after 3:00 pm Mountain on June15, 2026, may not be responded to.

Contractors are highly encouraged to attend an agency organized site visit. Site visits may be scheduled with Mr.  Juan Escobar at juan.escobar@ibwc.gov or Evelio Siller at Evelio.siller@ibwc.gov. Virtual site visits (video/photographs) are not permitted.

Site visits should be scheduled for NLT June 10, 2026.

Description: The International Boundary and Water Commission is seeking a price quote for Refurbish Breakers as per SOW attached, for the IBWC Amistad Field Office located at 670 Texas Spur 349, Del Rio, TX 78840.

The Contractor shall complete work within 180 calendar days after the contract has been awarded.

The government will award to the lowest price, technically acceptable, responsible offeror. The Contractor shall provide all labor, material, equipment, subcontract, supervision, and management to perform the requirements of this Statement of Work (SOW).      

The Government will award a contract resulting from this solicitation to the responsible Offeror based on Lowest Price Technically Acceptable. Technical acceptability will be based on the Contractor’s Technical Approach, Expertise and Qualified Personnel to provide the services, and Past Performance.

Technical Approach - Quote must demonstrate the technical approach by providing a narrative addressing all the items in the scope. The narrative shall at a minimum include your plan of action, equipment, key team members, and schedule.

Past Performance – Quotes shall demonstrate successful past performance of at least 3 three (3) references for similar projects. The information shall include name of person, company, phone number, email address, and brief description of the project.

Offerors shall meet or exceed and specifications and scope of work of items being quoted.

Failure to submit required technical approach, past performance and Price Sheet form will deem a proposal non-responsive and no consideration for award will be given.

Offerors shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer. NOTE: The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) website accessed through http://www.acuisition.gov.

INVOICE PROCESSING PLATFORM

The U.S. Section International Boundary and Water Commission (USIBWC) has transitioned to an electronic invoicing system. The Invoice Processing Platform (IPP) is a secure, web-based system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis. IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.

Information concerning accessing the IPP system will be provided at time of award.

END of combined synopsis/solicitation.  

Attachments:

Performance Work Statement

Price Sheet

Applicable Provisions and Clauses

Wage Determination

5/28/26 Modification 001 - Submit Updated PWS, and 4 OCB attachments.

See Q&As as follows:

  1. Asbestos handling responsibility. PWS § 3.4 notes approximately 30% non-friable asbestos in legacy control wiring. Please confirm: (a) is asbestos abatement included in contractor scope? (b) Is the contractor expected to provide AHERA-trained personnel and a Texas-licensed asbestos disposal facility? (c) Or does USIBWC coordinate this work through a standing abatement contract? Any Asbestos Work shall be included in your submittal, but at this time we didn’t find any material with Asbestos on this Breaker  
  2. Re-energization scope. PWS § 2.1.O states IBWC personnel perform the electrical clearance and lockout-tagout. Please confirm the contractor’s scope ends at functional verification per § 2.3, and IBWC’s qualified personnel perform the final re-energization of the 138 kV OCB.. IBWC Personnel will de-energize and lock/tag out the equipment, but Contractor can install their own locks too. IBWC Personnel will energize the OCB Breaker after the project is completed.
  3. Dielectric oil — volume and disposal. Approximate volume of existing dielectric oil to be drained from the OCB tank (in gallons), and any IBWC-preferred or required Texas-licensed used-oil disposal facility. Information of amount of oil gallons shall be founded in the manual,   and Oil Disposal or any material will required to be required to follow the current standards.  

Schedule

  1. Outage window. The 138 kV OCB is identified as critical equipment (PWS § 3.1). What outage window does IBWC envision for the disassembly, refurbishment, and re-installation phases? Are there seasonal or Rio Grande operational constraints (e.g., irrigation demand cycle) that dictate timing? The outage time and date will be determined after the contract is awarded based on power production and maintenance schedule for the facility
  2. 180-day period of performance clock. Does the 180 calendar days run from contract award / Notice to Proceed, or from a specific milestone? Given typical HV breaker refurbishment-grade parts lead times of 8–16 weeks, please clarify any flexibility around the parts-procurement phase. At this time, this project is schedule for 180 days, but we’re flexible to extend it, as necessary.
Update #1 ·

This is a combined synopsis/solicitation for commercial items in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued separately.

The solicitation number is FY265281014 and this solicitation is issued as a request for quote (RFQ).

This is a 100% Small business Set Aside. The associated North American Industry Classification System (NAICS) code is 335313 Switchgear and Switchboard Apparatus Manufacturing with a corresponding small business standard of 1,250 employees.

Only offers from small businesses will be considered for this solicitation.

Offer due date/local time: 3:00 PM Mountain on June 19, 2026. Please reference the solicitation number FY26R5201028 in the subject line. PDF format is preferred.

Offers shall be emailed to angelica.baca@ibwc.gov. FAXED QUOTES WILL NOT BE ACCEPTED.

Active Unique Entity ID (UEI#) shall be included with your offer.

Price Sheet shall be included with your quote.

Only questions submitted by email to angelica.baca@ibwc.gov will be considered. Questions received from Offerors after 3:00 pm Mountain on June15, 2026, may not be responded to.

Contractors are highly encouraged to attend an agency organized site visit. Site visits may be scheduled with Mr.  Juan Escobar at juan.escobar@ibwc.gov or Evelio Siller at Evelio.siller@ibwc.gov. Virtual site visits (video/photographs) are not permitted.

Site visits should be scheduled for NLT June 10, 2026.

Description: The International Boundary and Water Commission is seeking a price quote for Refurbish Breakers as per SOW attached, for the IBWC Amistad Field Office located at 670 Texas Spur 349, Del Rio, TX 78840.

The Contractor shall complete work within 180 calendar days after the contract has been awarded.

The government will award to the lowest price, technically acceptable, responsible offeror. The Contractor shall provide all labor, material, equipment, subcontract, supervision, and management to perform the requirements of this Statement of Work (SOW).      

The Government will award a contract resulting from this solicitation to the responsible Offeror based on Lowest Price Technically Acceptable. Technical acceptability will be based on the Contractor’s Technical Approach, Expertise and Qualified Personnel to provide the services, and Past Performance.

Technical Approach - Quote must demonstrate the technical approach by providing a narrative addressing all the items in the scope. The narrative shall at a minimum include your plan of action, equipment, key team members, and schedule.

Past Performance – Quotes shall demonstrate successful past performance of at least 3 three (3) references for similar projects. The information shall include name of person, company, phone number, email address, and brief description of the project.

Offerors shall meet or exceed and specifications and scope of work of items being quoted.

Failure to submit required technical approach, past performance and Price Sheet form will deem a proposal non-responsive and no consideration for award will be given.

Offerors shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer. NOTE: The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) website accessed through http://www.acuisition.gov.

INVOICE PROCESSING PLATFORM

The U.S. Section International Boundary and Water Commission (USIBWC) has transitioned to an electronic invoicing system. The Invoice Processing Platform (IPP) is a secure, web-based system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis. IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.

Information concerning accessing the IPP system will be provided at time of award.

END of combined synopsis/solicitation.  

Attachments:

Performance Work Statement

Price Sheet

Applicable Provisions and Clauses

Wage Determination

Files

Show all 11

Similar open opportunities

Opportunity Agency Set-aside Responses due
Government Publishing Office FY26 Equipment Inspection Washington, District of Columbia 20401, United States · NAICS 541350 Government Publishing Office No set-aside
Open, Inspect, Report and Overhaul of Circuit Breakers NAICS 811310 Coast Guard Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity