RECOVERY - Construction of the Lateral A to Retamal Dam River Levee in Hidalgo County Texas
Award Notice Posted
- Solicitation number
- IBM09B0009
- Awarded
- to Sbbi, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- IBM10C0007 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Hidalgo County, Texas, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
RECOVERY - This project is UNRESTRICTED. Provide all plant, labor and material for the construction of the Lateral A to Retamal Dam River Levee in Hidalgo County Texas. This 13.2 mile levee reach has an estimated magnitude between $25 million and $50 million. Performance period is 313 calendar days. Work consists of preparation of removal and stockpiling, if suitable for reuse, of gravel/topsoil/caliche or riprap; removal of existing pavements and structures; clearing and grubbing, installation and maintenance of erosion control measures; silt fencing; construction entrances and exits. Work includes benched excavation; placement of embankment; placement of topsoil and riprap; and seeding of disturbed areas. Solicitation, plans and specifications will be posted in FBO.Gov on or before November 27, 2009. The applicable NAICS Code is 237990. All responsible sources may submit a bid which shall be considered by the agency. Mandatory pre-bid conference an site visit scheduled for 12-08-09 at 2:30 p.m. CDT at the Mercedes Field Office, 325 Golf Course Road, Mercedes, TX 78570-9677, telephone 956-565-3150 if in need of directions.
Update #2 ·
RECOVERY - This project is UNRESTRICTED. Provide all plant, labor and material for the construction of the Lateral A to Retamal Dam River Levee in Hidalgo County Texas. This 13.2 mile levee reach has an estimated magnitude between $10 million and $25 million. Performance period is 313 calendar days. Work consists of preparation of removal and stockpiling, if suitable for reuse, of gravel/topsoil/caliche or riprap; removal of existing pavements and structures; clearing and grubbing, installation and maintenance of erosion control measures; silt fencing; construction entrances and exits. Work includes benched excavation; placement of embankment; placement of topsoil and riprap; and seeding of disturbed areas. Solicitation, plans and specifications will be posted in FBO.Gov on or before November 27, 2009. The applicable NAICS Code is 237990. All responsible sources may submit a bid which shall be considered by the agency.
Update #1 ·
RECOVERY - This project is UNRESTRICTED. Provide all plant, labor and material for the construction of the Lateral A to Retamal Dam River Levee in Hidalgo County Texas. This 13.2 mile levee reach has an estimated magnitude between $10 million and $25 million. Performance period is 313 calendar days. Work consists of preparation of removal and stockpiling, if suitable for reuse, of gravel/topsoil/caliche or riprap; removal of existing pavements and structures; clearing and grubbing, installation and maintenance of erosion control measures; silt fencing; construction entrances and exits. Work includes benched excavation; placement of embankment; placement of topsoil and riprap; and seeding of disturbed areas. Solicitation, plans and specifications will be posted on or before Aug 19, 2009. The applicable NAICS Code is 237990. All responsible sources may submit a bid which shall be considered by the agency.
Files
| File | Type | Posted |
|---|---|---|
| Abstract Spreadsheet 12-29-09.xls | XLS spreadsheet | |
| 00 31 32 Geotechnical Data.pdf | ||
| IBM09B0009 A002.pdf | ||
| 02 02 00 ExistConds.pdf | ||
| Div35.pdf | ||
| IBM09B0009-A001.pdf | ||
| IBM09B0009-Drawings.pdf | ||
| IBM09TO020-GeotechReport.pdf | ||
| Div31.pdf | ||
| J-10_IBWC_Form_108.pdf | ||
| J-2_IBWC_Form_117.pdf | ||
| Div90.pdf | ||
| J-8_SF_28.pdf | ||
| Div50.pdf | ||
| J-7_SF_25A.pdf | ||
| J-4_IBWC_Form_116.pdf | ||
| Div01.pdf | ||
| IBM09B0009.pdf | ||
| J-3_IBWC_Form_110.pdf | ||
| Div02.pdf | ||
| J-11_SF_1413.pdf | ||
| J-6_SF_25.pdf | ||
| J-9_IBWC-105.pdf | ||
| Div60.pdf | ||
| J-5_SF_24.pdf | ||
| Div00.pdf | ||
| J-1_General_Decision_TX829.pdf |
Show all 27
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity