J-1_General_Decision_TX829.pdf

PDF 12 KB Posted

Attached to
RECOVERY - Construction of the Lateral A to Retamal Dam River Levee in Hidalgo County Texas
Solicitation number
IBM09B0009
Issued by

About this file

J.1 General Wage Decision

View the file

Other files

File Type Posted
Abstract Spreadsheet 12-29-09.xls XLS spreadsheet
00 31 32 Geotechnical Data.pdf PDF
02 02 00 ExistConds.pdf PDF
Div35.pdf PDF
IBM09B0009 A002.pdf PDF
IBM09B0009-A001.pdf PDF
IBM09B0009-Drawings.pdf PDF
J-8_SF_28.pdf PDF
J-4_IBWC_Form_116.pdf PDF
Div01.pdf PDF
Div50.pdf PDF
Div02.pdf PDF
J-11_SF_1413.pdf PDF
J-6_SF_25.pdf PDF
Div31.pdf PDF
IBM09TO020-GeotechReport.pdf PDF
J-9_IBWC-105.pdf PDF
J-7_SF_25A.pdf PDF
Div60.pdf PDF
Div00.pdf PDF
J-5_SF_24.pdf PDF
J-10_IBWC_Form_108.pdf PDF
J-2_IBWC_Form_117.pdf PDF
Div90.pdf PDF
IBM09B0009.pdf PDF
J-3_IBWC_Form_110.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: TX080029 02/08/2008 TX29

Superseded General Decision Number: TX20070029

State: Texas

Construction Types: Heavy and Highway

Counties: Cameron, Hidalgo and Webb Counties in Texas.

Heavy (excluding tunnels and dams) and Highway Construction Projects (does not include building structures in rest area projects). *NOT TO BE USED FOR HEAVY PROJECTS in Nueces and San Patricio Counties.

Modification Number Publication Date * SUTX2005-004 01/05/2005 0 02/08/2008

Rates Fringes

Asphalt Distributor Operator...$ 9.57 0.00 Asphalt paving machine operator$ 9.73 0.00 Asphalt Raker..................$ 7.50 0.00 Asphalt Shoveler...............$ 9.35 0.00 Broom or Sweeper Operator......$ 7.55 0.00 Bulldozer operator ...........$ 9.28 0.00 Carpenter......................$ 10.20 0.00 Concrete Finisher, Paving......$ 10.73 0.00 Concrete Finisher, Structures..$ 9.59 0.00 Concrete Rubber................$ 9.87 0.00 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel Operator.......................$ 10.83 0.00 Flagger........................$ 7.40 0.00 Form Builder/Form Setter, Structures.....................$ 9.16 0.00 Form Setter, Paving & Curb.....$ 10.50 0.00 Foundation Drill Operator, Truck Mounted..................$ 12.50 0.00 Front End Loader Operator......$ 8.61 0.00 Laborer, common................$ 7.69 0.00 Laborer, Utility...............$ 9.05 0.00 Mechanic.......................$ 10.81 0.00 Motor Grader Operator, Fine Grade..........................$ 11.91 0.00 Motor Grader Operator, Rough...$ 11.27 0.00 Pipelayer......................$ 8.44 0.00 Reinforcing Steel Setter.......$ 10.44 0.00 Roller Operator, Pneumatic, Self-Propelled.................$ 7.16 0.00 Roller Operator, Steel Wheel, Flat Wheel/Tamping.............$ 7.17 0.00 Roller Operator, Steel Wheel, Plant Mix Pavement.............$ 8.00 0.00 Scraper Operator...............$ 8.61 0.00 Servicer.......................$ 8.81 0.00 Tractor operator, Pneumatic....$ 8.50 0.00 Traveling Mixer Operator.......$ 8.30 0.00 Truck driver, lowboy-Float.....$ 10.82 0.00 Truck driver, Single Axle, Heavy..........................$ 9.43 0.00 Truck driver, Single Axle, Light..........................$ 9.19 0.00 Truck Driver, Tandem Axle, Semi-Trailer...................$ 8.01 0.00 Welder.........................$ 10.31 0.00 Work Zone Barricade Servicer...$ 8.40 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination * a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION