00 31 32 Geotechnical Data.pdf
PDF 31 KB Posted
- Attached to
- RECOVERY - Construction of the Lateral A to Retamal Dam River Levee in Hidalgo County Texas
- Solicitation number
- IBM09B0009
About this file
IBM09B0009-A002 Spec 003132 Geotech Data
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract Spreadsheet 12-29-09.xls | XLS spreadsheet | |
| 02 02 00 ExistConds.pdf | ||
| Div35.pdf | ||
| IBM09B0009 A002.pdf | ||
| IBM09B0009-A001.pdf | ||
| IBM09B0009-Drawings.pdf | ||
| J-8_SF_28.pdf | ||
| J-4_IBWC_Form_116.pdf | ||
| Div01.pdf | ||
| Div50.pdf | ||
| Div02.pdf | ||
| J-11_SF_1413.pdf | ||
| J-6_SF_25.pdf | ||
| Div31.pdf | ||
| IBM09TO020-GeotechReport.pdf | ||
| J-9_IBWC-105.pdf | ||
| J-7_SF_25A.pdf | ||
| Div60.pdf | ||
| Div00.pdf | ||
| J-5_SF_24.pdf | ||
| J-10_IBWC_Form_108.pdf | ||
| J-2_IBWC_Form_117.pdf | ||
| Div90.pdf | ||
| J-1_General_Decision_TX829.pdf | ||
| IBM09B0009.pdf | ||
| J-3_IBWC_Form_110.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lower Rio Grande Flood Control Project Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike Reach Hidalgo County, Texas
GEOTECHNICAL DATA
USIBWC Contract No.: IBM09B0009 Page 00.31.32 - 1
AVAILABLE INFORMATION 00.31.32
Geotechnical investigations for this project included the following:
• “Geotechnical Exploration and Engineering Evaluation of Levee System for Lateral A to Donna Pump to Retamal Dam, Lower Rio Grande Flood Control Project, Technical Memorandum,” September 22, 2009, Raba-Kistner Consultants, Inc.; and,
• “Geotechnical Engineering Report, Lateral “A” Floodwall at Donna-Rio Bravo
International Bridge (Sta 1769+08.11 to 1773+62.62),” December 7, 2009, L&G Engineering Laboratory, LLC.
The Contractor may request a copy of the report from the Government.
The data and report are not intended as a representation or warranty of continuity of conditions between soil borings nor of groundwater levels at dates and times other than date and time when measured. The Government will not be responsible for interpretations or conclusions drawn there by the Contractor.
Data are solely made available for the convenience of Contractor. Additional test borings and other exploratory operations may be made by Contractor subsequent to award of the Contract at no additional cost to the Government.
Lower Rio Grande Flood Control Project Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike Reach Hidalgo County, Texas
USIBWC Contract No.: IBM09B0009 Page 00.31.32 - 2
This Page Intentionally Blank
File details come from the government source that posted it. Updated .