00 31 32 Geotechnical Data.pdf

PDF 31 KB Posted

Attached to
RECOVERY - Construction of the Lateral A to Retamal Dam River Levee in Hidalgo County Texas
Solicitation number
IBM09B0009
Issued by

About this file

IBM09B0009-A002 Spec 003132 Geotech Data

View the file

Other files

File Type Posted
Abstract Spreadsheet 12-29-09.xls XLS spreadsheet
02 02 00 ExistConds.pdf PDF
Div35.pdf PDF
IBM09B0009 A002.pdf PDF
IBM09B0009-A001.pdf PDF
IBM09B0009-Drawings.pdf PDF
J-8_SF_28.pdf PDF
J-4_IBWC_Form_116.pdf PDF
Div01.pdf PDF
Div50.pdf PDF
Div02.pdf PDF
J-11_SF_1413.pdf PDF
J-6_SF_25.pdf PDF
Div31.pdf PDF
IBM09TO020-GeotechReport.pdf PDF
J-9_IBWC-105.pdf PDF
J-7_SF_25A.pdf PDF
Div60.pdf PDF
Div00.pdf PDF
J-5_SF_24.pdf PDF
J-10_IBWC_Form_108.pdf PDF
J-2_IBWC_Form_117.pdf PDF
Div90.pdf PDF
J-1_General_Decision_TX829.pdf PDF
IBM09B0009.pdf PDF
J-3_IBWC_Form_110.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lower Rio Grande Flood Control Project Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike Reach Hidalgo County, Texas

GEOTECHNICAL DATA

USIBWC Contract No.: IBM09B0009 Page 00.31.32 - 1

AVAILABLE INFORMATION 00.31.32

Geotechnical investigations for this project included the following:

• “Geotechnical Exploration and Engineering Evaluation of Levee System for Lateral A to Donna Pump to Retamal Dam, Lower Rio Grande Flood Control Project, Technical Memorandum,” September 22, 2009, Raba-Kistner Consultants, Inc.; and,

• “Geotechnical Engineering Report, Lateral “A” Floodwall at Donna-Rio Bravo

International Bridge (Sta 1769+08.11 to 1773+62.62),” December 7, 2009, L&G Engineering Laboratory, LLC.

The Contractor may request a copy of the report from the Government.

The data and report are not intended as a representation or warranty of continuity of conditions between soil borings nor of groundwater levels at dates and times other than date and time when measured. The Government will not be responsible for interpretations or conclusions drawn there by the Contractor.

Data are solely made available for the convenience of Contractor. Additional test borings and other exploratory operations may be made by Contractor subsequent to award of the Contract at no additional cost to the Government.

Lower Rio Grande Flood Control Project Rehabilitation of Lateral A to Donna Pump Levee and Retamal Dike Reach Hidalgo County, Texas

USIBWC Contract No.: IBM09B0009 Page 00.31.32 - 2

This Page Intentionally Blank

File details come from the government source that posted it. Updated .