RECOVERY - Construction of Levee Improvements on the North Floodway (Phases 1 and 2) and Arroyo Colorado (Phases 1 & 2)

Award Notice Posted

Solicitation number
IBM09B0004
Agency
Awarded
to Fidelity & Deposit Co Of Maryland
Set-aside
No set-aside

Opportunity facts

Contract number
IBM10C0002 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Hidalgo County, United States

Notice details come from SAM.gov. Updated .

Notice text

8 versions

Update #8 · Latest ·

This is a correction to previously synopsized award to correct the posted award amount from $20,998,112.28 to $20,988,112.28.

Update #7 ·

Note bid opening date has been extended to Sep 25, 2009.

Update #6 ·

RECOVERY - Construction of Levee Improvements on the North Floodway (Phase 1 and 2) and Arroyo Colorado (Phases 1 & 2).  Provide all plant, labor and equipment for the construction of the Arroyo Colorado North Levee Phase 1 & 2 (a 10.5 mile reach) and construction of the North Floodway Levees Phases 1 from FM1015 to Baseline Road, Texas (a 14.1 mile reach).   Work includes clearing and grubbing, installation and maintenance of erosion control measures, silt fencing, benched excavation, placement of embankment, placement of topsoil, placement of riprap, seeding and revegetation of disturbed areas.   The magnitude of the project is between $25million and $50 million.  The period of performance is 381 calendar days.  This requirement is UNRESTRICTED to all responsible offerors.  The applicable NAICS Code is 237990.  The applicable small business size standard is $33.5 million.  Interested PRIME contractors and trade associations shall submit requests for solicitation in writing to IBWC, Attn:  Colleen Elliott, Contracting Officer, 4171 N. Mesa, C-100, El Paso, Tx  79902-14441.  Subcontractors may request a bidders mailing list to locate available planholders.  All responsible sources may submit a bid which shall be considered by the agency.


 


 

Update #5 ·

RECOVERY - Construction of Levee Improvements on the North Floodway (Phase 1) and Arroyo Colorado (Phases 1 & 2).  Provide all plant, labor and equipment for the construction of the Arroyo Colorado North Levee Phase 1 & 2 (a 10.5 mile reach) and construction of the North Floodway Levees Phases 1 from FM1015 to Baseline Road, Texas (a 14.1 mile reach).   Work includes clearing and grubbing, installation and maintenance of erosion control measures, silt fencing, benched excavation, placement of embankment, placement of topsoil, placement of riprap, seeding and revegetation of disturbed areas.   The magnitude of the project is between $25million and $50 million.  The period of performance is 381 calendar days.  This requirement is UNRESTRICTED to all responsible offerors.  The applicable NAICS Code is 237990.  The applicable small business size standard is $33.5 million.  Interested PRIME contractors and trade associations shall submit requests for solicitation in writing to IBWC, Attn:  Colleen Elliott, Contracting Officer, 4171 N. Mesa, C-100, El Paso, Tx  79902-14441.  Subcontractors may request a bidders mailing list to locate available planholders.  All responsible sources may submit a bid which shall be considered by the agency.


 


 

Update #4 ·

RECOVERY - Provide all plant, labor and equipment for the construction of the Arroyo Colorado North Levee Phase 1 & 2 (a 10.5 mile reach) and construction of the North Floodway Levees Phases 1 from FM1015 to Baseline Road, Texas (a 14.1 mile reach).   Work includes clearing and grubbing, installation and maintenance of erosion control measures, silt fencing, benched excavation, placement of embankment, placement of topsoil, placement of riprap, seeding and revegetation of disturbed areas.   The magnitude of the project is between $25million and $50 million.  The period of performance is 381 calendar days.  This requirement is UNRESTRICTED to all responsible offerors.  The applicable NAICS Code is 237990.  The applicable small business size standard is $33.5 million.  Interested PRIME contractors and trade associations shall submit requests for solicitation in writing to IBWC, Attn:  Colleen Elliott, Contracting Officer, 4171 N. Mesa, C-100, El Paso, Tx  79902-14441.  Subcontractors may request a bidders mailing list to locate available planholders.  All responsible sources may submit a bid which shall be considered by the agency.


 


 

Update #3 ·

RECOVERY - Provide all plant, labor and equipment for the construction of the Arroyo Colorado North Levee (a 10.5 mile reach) and construction of the North Floodway Levees Phases 1 and 2 from FM1015 to H/C County line Texas (a 14.1 mile reach).   Work includes clearing and grubbing, installation and maintenance of erosion control measures, silt fencing, benched excavation, placement of embankment, placement of topsoil, placement of riprap, seeding and revegetation of disturbed areas.   The magnitude of the project is between $25million and $50 million.  The period of performance is 381 calendar days.  This requirement is UNRESTRICTED to all responsible offerors.  The applicable NAICS Code is 237990.  The applicable small business size standard is $33.5 million.  Interested PRIME contractors and trade associations shall submit requests for solicitation in writing to IBWC, Attn:  Colleen Elliott, Contracting Officer, 4171 N. Mesa, C-100, El Paso, Tx  79902-14441.  Subcontractors may request a bidders mailing list to locate available planholders.  All responsible sources may submit a bid which shall be considered by the agency.


 


 

Update #2 ·

RECOVERY - Provide all plant, labor and equipment for the construction of the Arroyo Colorado North Levee (a 10.5 mile reach) and construction of the North Floodway Levees Phases 1 and 2 from FM1015 to H/C County line Texas (a 14.1 mile reach).   Work includes clearing and grubbing, installation and maintenance of erosion control measures, silt fencing, benched excavation, placement of embankment, placement of topsoil, placement of riprap, seeding and revegetation of disturbed areas.   The magnitude of the project is between $25million and $50 million.  The period of performance is 381 calendar days.  This requirement is UNRESTRICTED to all responsible offerors.  The applicable NAICS Code is 237990.  The applicable small business size standard is $33.5 million.  Interested PRIME contractors and trade associations shall submit requests for solicitation in writing to IBWC, Attn:  Colleen Elliott, Contracting Officer, 4171 N. Mesa, C-100, El Paso, Tx  79902-14441.  Subcontractors may request a bidders mailing list to locate available planholders.  All responsible sources may submit a bid which shall be considered by the agency.


 


 

Update #1 ·

RECOVERY - Provide all plant, labor and equipment for the construction of the Arroyo Colorado North Levee.   Work includes clearing and grubbing, installation and maintenance of erosion control measures, silt fencing, benched excavation, placement of embankment, placement of topsoil, placement of riprap, seeding and revegetation of disturbed areas.  The reach spans approximately 10.5 miles and the magnitude of the project is between $10 million and $25 million.  The period of performance is 381 calendar days.  This is a 100% total Small Business Set-Aside.  Interested PRIME contractors and trade associations shall submit requests for solicitation in writing to IBWC, Attn:  Hugo White, Supervisory Contracting Officer, 4171 N. Mesa, C-100, El Paso, Tx  79902-14441.  Subcontractors may request a bidders mailing list to locate available planholders.  All responsible sources may submit a bid which shall be considered by the agency.

Files

File Type Posted
GFMS IBM09B0004-A007.pdf PDF
GFMS IBM09B0004-A006.pdf PDF
GFMS IBM09B0004-A005.pdf PDF
NF1_12.63A.pdf PDF
01 19 00R ScopeofWork.pdf PDF
60 23 00 Floodwall.pdf PDF
GFMS IBM09B0004-A004.pdf PDF
AC1_12.17.pdf PDF
60 80 00 Flood Gate-Rev.pdf PDF
01 33 00 Submittals.pdf PDF
u0450518(nf2)_ADDENDUM NO.2_09_03_09.pdf PDF
U0450515(nf1)_Addendum 2 09-03-09.PDF PDF
02 02 00 ExistConds.pdf PDF
60 41 00 SteelStr.pdf PDF
50 25 00 HotMix.pdf PDF
01 19 00 ScopeofWork.pdf PDF
60 50 00 Railing.pdf PDF
00 31 24 EA Information.pdf PDF
01 46 00 QC-QA.pdf PDF
GFMS IBM09B0004-A003.pdf PDF
00 31 21 Survey Information.pdf PDF
U0450516(acn1)_Addendum 2 09-03-09.pdf PDF
60 21 00 HydraCement.pdf PDF
U0450517(acn2)_Addendum 2 09-03-09.pdf PDF
02.01-02.20.pdf PDF
13.01.pdf PDF
14.01.pdf PDF
10.01-10.336.pdf PDF
05.01-05.06.pdf PDF
06.01-06.02.pdf PDF
12.01-12.41.pdf PDF
09.01-09.33.pdf PDF
07.01-07.10.pdf PDF
03.01.pdf PDF
15.01-15.22.pdf PDF
04.01.pdf PDF
08.01-08.140.pdf PDF
01.01.pdf PDF
GFMS IBM09B0004-A002.pdf PDF
Appendix C.pdf PDF
Appendix A.pdf PDF
Appendix E.pdf PDF
Appendix D.pdf PDF
Final Report - NFW2 NFE2.pdf PDF
nfw2.pdf PDF
Appendix F.pdf PDF
nfe2.pdf PDF
Appendix B.pdf PDF
Appendix G.pdf PDF
Div60.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors