IBM09B0004 Amendment A001 Boring Logs Nfw2

View the file

Other files

File Type Posted
GFMS IBM09B0004-A007.pdf PDF
GFMS IBM09B0004-A006.pdf PDF
GFMS IBM09B0004-A005.pdf PDF
60 80 00 Flood Gate-Rev.pdf PDF
NF1_12.63A.pdf PDF
GFMS IBM09B0004-A004.pdf PDF
60 23 00 Floodwall.pdf PDF
AC1_12.17.pdf PDF
01 19 00R ScopeofWork.pdf PDF
U0450517(acn2)_Addendum 2 09-03-09.pdf PDF
01 33 00 Submittals.pdf PDF
02 02 00 ExistConds.pdf PDF
01 19 00 ScopeofWork.pdf PDF
U0450515(nf1)_Addendum 2 09-03-09.PDF PDF
00 31 24 EA Information.pdf PDF
50 25 00 HotMix.pdf PDF
01 46 00 QC-QA.pdf PDF
00 31 21 Survey Information.pdf PDF
GFMS IBM09B0004-A003.pdf PDF
60 21 00 HydraCement.pdf PDF
U0450516(acn1)_Addendum 2 09-03-09.pdf PDF
u0450518(nf2)_ADDENDUM NO.2_09_03_09.pdf PDF
60 50 00 Railing.pdf PDF
60 41 00 SteelStr.pdf PDF
15.01-15.22.pdf PDF
06.01-06.02.pdf PDF
12.01-12.41.pdf PDF
05.01-05.06.pdf PDF
13.01.pdf PDF
09.01-09.33.pdf PDF
04.01.pdf PDF
03.01.pdf PDF
08.01-08.140.pdf PDF
07.01-07.10.pdf PDF
14.01.pdf PDF
01.01.pdf PDF
02.01-02.20.pdf PDF
10.01-10.336.pdf PDF
GFMS IBM09B0004-A002.pdf PDF
Appendix A.pdf PDF
Final Report - NFW2 NFE2.pdf PDF
nfe2.pdf PDF
Appendix G.pdf PDF
Appendix F.pdf PDF
Appendix B.pdf PDF
Appendix C.pdf PDF
Appendix D.pdf PDF
Appendix E.pdf PDF
Div02.pdf PDF
Div60.pdf PDF
Show 40 more

Latest 50 of 93 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPT

SH

SH

SH

SH

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

11-14-14 (28)

6-9-11 (20)

8-8-10 (18)

8-8-11 (19)

13-17-20 (37)

25-30-35 (65)

21-29-33 (62)

23-24-27 (51)

35-50-50 (100)

31-29-35 (64)

Caliche Base Material with Gravel, Roadway, 6" (SC) Sand, Clayey, Dark Brown, Dry, Medium Dense

(CH) Fat Clay, Slightly Sandy, Dark Brown, Dry to Moist, Stiff to Hard

(CL) Lean Clay, Slightly Sandy, Brown, Wet, Stiff

(SM) Sand, Silty, Tan, Wet, Medium Dense to Very Dense

Bottom of borehole at 60.0 feet.

3.5

4.5

NOTES Solid Stem Auger to 25' / Mud Rotary to 60'

GROUND ELEVATION 75.73 ft

LOGGED BY J. Holmes

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR Jordan Drilling, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/24/09 COMPLETED 4/24/09

AT TIME OF DRILLING 25.00 ft / Elev 50.73 ft during drilling

AT END OF DRILLING --- no water observed after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-002

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83 Mercedes TX 78570 Telephone: 956-565-0760

SH

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

5-5-6 (11)

10-7-8 (15)

10-6-5 (11)

8-10-11 (21)

9-6-7 (13)

6-9-11 (20)

6-7-9 (16)

13-16-21 (37)

10-14-16 (30)

12-15-17 (32)

32-50

35-41-50 (91)

31-35-40 (75)

Caliche Base Material with Gravel, Roadway, 6" (CH) Fat Clay, Dark Brown to Tan, Moist, Firm to Hard

(SM) Sand, Silty, Tan, Wet, Very Dense

(CL) Lean Clay, Tan, Moist, Hard

Bottom of borehole at 60.0 feet.

4.5

NOTES Solid Stem Auger to 28' / Mud Rotary to 60'

GROUND ELEVATION 75.91 ft

LOGGED BY J. Holmes

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR Jordan Drilling, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/27/09 COMPLETED 4/27/09

AT TIME OF DRILLING 28.00 ft / Elev 47.91 ft during drilling

AT END OF DRILLING 20.00 ft / Elev 55.91 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-003

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SH

SPT

SH

SPT

SH

SPT

SH

SPT

SH

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

3-3-5 (8)

4-5-7 (12)

3-3-5 (8)

6-9-12 (21)

4-4-5 (9)

5-6-13 (19)

9-16-19 (35)

7-13-21 (34)

4-6-13

Caliche Base Material, Roadway, 3" (CH) Fat Clay, Dark Brown, Moist, Soft

(MH) Silt, Dark Brown, Dry, Firm

(CH) Fat Clay, Dark Brown to Light Brown, Dry to Moist, Firm

(SM) Sand, Silty, Brown, Moist, Loose to Medium Dense

(CL) Lean Clay, Sandy, Reddish-Brown, Moist to Dry, Firm to Hard

NOTES Solid Stem Auger to 35' / Mud Rotary to 120'

GROUND ELEVATION 76.37 ft

LOGGED BY E. Hernandez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR JEDI, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/2/09 COMPLETED 5/2/09

AT TIME OF DRILLING 35.00 ft / Elev 41.37 ft during drilling

AT END OF DRILLING 25.00 ft / Elev 51.37 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-004

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(19)

4-5-10 (15)

9-13-14 (27)

5-7-13 (20)

10-12-19 (31)

8-9-14 (23)

13-16-19 (35)

21-25-27 (52)

14-16-23 (39)

40-34-40 (74)

24-28-31 (59)

18-24-21 (45)

14-15-26 (41)

(CL) Lean Clay, Sandy, Reddish-Brown, Moist to Dry, Firm to Hard (continued)

(CH) Fat Clay, Reddish-Brown to Tan, Moist, Stiff to Hard

(ML) Silt, Brown, Moist, Very Dense

(CL) Lean Clay, Tan, Moist, Hard

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-004

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SH

SH

SH

SH

SPT

SH

SPT

SPT

SPT

SPT

SH

SPT

8-6-6 (12)

3-6-6 (12)

3-3-15 (18)

5-5-7 (12)

8-10-11 (21)

11-16-21 (37)

7-8-10 (18)

16-18-17 (35)

Caliche Base Material, Roadway, 4" (CH) Fat Clay, Dark Brown, Dry to Moist, Firm to Hard

(CL) Lean Clay, Slightly Sandy, Tan, Wet, Stiff to Soft

(ML) Silt, Sandy, Tan, Wet to Moist, Medium Dense to Dense

(SP-SM) Sand, Silty, Poorly Graded, Tan, Wet, Medium Dense

(CL) Lean Clay, Silty, Tan, Moist, Stiff to Hard

(SC) Lean Clay, Silty, Tan, Moist, Dense Bottom of borehole at 60.0 feet.

4.5

4.5

4.5

3.0

1.0

2.5

NOTES Solid Stem Auger to 27' / Mud Rotary to 60'

GROUND ELEVATION 76.12 ft

LOGGED BY Erasmo C.

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. GIL

DATE STARTED 4/11/09 COMPLETED 4/11/09

AT TIME OF DRILLING 27.00 ft / Elev 49.12 ft during drilling

AT END OF DRILLING 24.50 ft / Elev 51.62 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-006

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SH

SPT

SH

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

4-5-5 (10)

4-4-6 (10)

5-6-6 (12)

8-9-16 (25)

6-6-10 (16)

10-11-22 (33)

15-16-20 (36)

21-27-30 (57)

17-20-26 (46)

20-21-32 (53)

24-23-27

Caliche Base Material, Roadway, 4" (SC) Sand, Clayey, Dark Brown, Dry, Loose

(CH) Fat Clay, Dark Brown, Moist, Firm

(CL) Lean Clay, Dark Brown, Moist, Firm

(CH) Fat Clay, Dark Brown, Moist, Firm

(SM) Sand, Silty, Brown, Moist, Medium Dense

(ML) Silt, Sandy, Tan, Wet, Medium Dense

(SM) Sand, Silty, Light Brown, Wet to Moist, Dense

(ML) Silt, Brown, Wet, Very Dense

(SM) Sand, Silty, Brown, Wet, Dense

(CH) Fat Clay, Reddish-Brown, Moist, Hard

NOTES Solid Stem Auger to 30' / Mud Rotary to 120'

GROUND ELEVATION 76.17 ft

LOGGED BY E. Hernandez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR JEDI, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/3/09 COMPLETED 5/3/09

AT TIME OF DRILLING 27.00 ft / Elev 49.17 ft during drilling

AT END OF DRILLING 26.00 ft / Elev 50.17 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-008

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(50)

10-13-18 (31)

14-16-28 (44)

7-13-26 (39)

9-22-29 (51)

5-5-12 (17)

7-6-10 (16)

4-5-11 (16)

5-6-4 (10)

4-5-10 (15)

5-6-9 (15)

19-20-23 (43)

18-24-31 (55)

(CH) Fat Clay, Reddish-Brown, Moist, Hard (continued)

(CL) Lean Clay, Slightly Sandy, Reddish-Brown to Tan, Moist to Dry, Hard to Stiff to Hard

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-008

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

6-5-10 (15)

3-3-4 (7)

7-10-20 (30)

13-21-31 (52)

15-24-38 (62)

25-28-34 (62)

16-25-31 (56)

46-45-50 (95)

41-42-50 (92)

Caliche Base Material, Roadway, 6" (CH) Fat Clay, Dark Brown, Moist, Stiff to Firm

(CL) Lean Clay, Tan, Moist, Soft

(SM) Sand, Silty, Brown, Wet, Medium Dense

(SP-SM) Sand, Silty, Poorly Graded, Brown, Wet, Very Dense

(CL) Lean Clay, Tan, Moist, Hard

(CH) Fat Clay, Reddish-Brown, Wet to Moist, Hard

Bottom of borehole at 60.0 feet.

2.5

NOTES Solid Stem Auger to 45' / Mud Rotary to 60'

GROUND ELEVATION 76.26 ft

LOGGED BY J. Holmes

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR Jordan Drilling, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/28/09 COMPLETED 4/28/09

AT TIME OF DRILLING 30.00 ft / Elev 46.26 ft during drilling

AT END OF DRILLING 24.00 ft / Elev 52.26 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-010

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

7-7-8 (15)

5-5-5 (10)

3-3-5 (8)

3-3-4 (7)

2-3-4 (7)

4-5-9 (14)

7-9-13 (22)

4-4-6 (10)

6-6-9 (15)

10-13-13 (26)

14-18-20 (38)

14-16-17 (33)

16-18-21 (39)

5-7-6

Caliche Base Material, Roadway, 4" (CL) Lean Clay, Sandy, Dark Brown, Dry, Firm

(SC) Sand, Clayey, Brown, Moist, Loose

(CH) Fat Clay, Sandy, Dark Brown, Moist, Soft

(CL) Lean Clay, Sandy, Tan, Moist, Firm to Stiff

(SM) Sand, Silty, Brown, Wet, Loose to Dense

(SP-SM) Sand, Silty, Poorly Graded, Brown, Wet, Dense

(CL) Lean Clay, Reddish-Brown, Moist, Firm to Stiff

NOTES Solid Stem Auger to 30' / Mud Rotary to 120'

GROUND ELEVATION 75.23 ft

LOGGED BY E. Castillo

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/2/09 COMPLETED 5/2/09

AT TIME OF DRILLING 25.00 ft / Elev 50.23 ft during drilling

AT END OF DRILLING 24.00 ft / Elev 51.23 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-012

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(13)

9-12-15 (27)

7-9-10 (19)

12-14-16 (30)

4-5-7 (12)

8-10-11 (21)

11-14-17 (31)

14-21-25 (46)

18-20-24 (44)

21-26-31 (57)

18-22-26 (48)

21-27-28 (55)

25-29-31 (60)

(CL) Lean Clay, Reddish-Brown, Moist, Firm to Stiff (continued)

(CL-ML) Lean Clay, Silty, Tan, Moist,Stiff

(CL) Lean Clay, Tan, Moist, Firm to Stiff

(CH) Fat Clay, Tan, Moist, Hard

(CL) Lean Clay, Tan to Reddish-Brown, Moist, Hard

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-012

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SH

SH

SPT

SH

SPT

SPT

SPT

SPT

SPT

SPT

SH

SH

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

4-5-6 (11)

3-3-6 (9)

4-3-4 (7)

6-9-11 (20)

7-10-9 (19)

20-30-32 (62)

22-26-28 (54)

10-11-15 (26)

26-41-27 (68)

Caliche Base Material, Roadway, 4" (SC) Sand, Clayey, Dark Brown to Tan, Moist to Dry to Moist, Medium Dense to Loose

(SM) Clay, Silty, Tan, Wet, Medium Dense to Very Dense

(SP-SM) Sand, Silty, Poorly Graded, Wet, Stiff

(SM) Sand, Silty, Tan, Wet, Very Dense

(SP-SM) Sand, Silty, Poorly Graded, Tan, Wet, Very Dense to Medium Dense to Very Dense

(CH) Fat Clay, Reddish-Brown, Moist, Stiff

Bottom of borehole at 60.0 feet.

3.0

4.0

1.5

4.5

3.5

NOTES Solid Stem Auger to 28' / Mud Rotary to 60'

GROUND ELEVATION 73.64 ft

LOGGED BY Erasmo C.

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. GIL

DATE STARTED 4/11/09 COMPLETED 4/11/09

AT TIME OF DRILLING 27.50 ft / Elev 46.14 ft during drilling

AT END OF DRILLING 23.00 ft / Elev 50.64 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-015

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

5-6-5 (11)

3-4-5 (9)

3-4-4 (8)

4-3-5 (8)

3-4-9 (13)

5-7-8 (15)

7-9-11 (20)

5-6-9 (15)

8-11-13 (24)

8-12-18 (30)

10-13-16 (29)

9-12-15 (27)

12-10-11 (21)

7-9-10

Caliche Base Material, Roadway, 4" (SC) Sand, Clayey, Light Brown, Dry, Loose to Medium Dense

(CH) Fat Clay, Dark Brown, Moist, Soft

(SC) Sand, Clayey, Dark Brown to Brown, Moist, Medium Dense

(CL) Lean Clay, Dark Brown to Brown, Moist, Firm to Stiff

(CH) Fat Clay, Slightly Sandy, Light Brown, Moist to Dry, Stiff

(ML) Silt, Reddish-Brown, Moist, Medium Dense

NOTES Solid Stem Auger to 35' / Mud Rotary to 120'

GROUND ELEVATION 73.79 ft

LOGGED BY Ram C.

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/2/09 COMPLETED 5/2/09

AT TIME OF DRILLING 27.00 ft / Elev 46.79 ft during drilling

AT END OF DRILLING 23.00 ft / Elev 50.79 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-016

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(19)

6-8-8 (16)

4-8-9 (17)

5-6-10 (16)

4-4-5 (9)

6-5-7 (12)

7-5-8 (13)

9-14-15 (29)

8-11-12 (23)

7-9-11 (20)

13-18-20 (38)

12-14-17 (31)

13-10-10 (20)

(ML) Silt, Reddish-Brown, Moist, Medium Dense (continued)

(CH) Fat Clay, Reddish-Brown, Moist, Stiff

(CL) Lean Clay, Sandy, Tan, Moist, Stiff

(SC) Sand, Clayey, Tan, Moist, Medium Dense

(CL) Lean Clay, Reddish-Brown to Tan, Moist, Firm to Hard

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-016

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SH

SH

SH

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

6-4-8 (12)

5-6-8 (14)

4-3-8 (11)

3-5-8 (13)

3-3-5 (8)

4-4-9 (13)

17-23-30 (53)

39-39-20 (59)

9-12-14 (26)

9-12-17 (29)

11-15-17 (32)

Caliche Base Material with Gravel, Roadway, 4" (CH) Fat Clay, Sandy to Slightly Sandy, Brown to Black, Dry to Moist, Firm to Soft

(CL) Lean Clay, Sandy, Brown, Moist, Soft

(SC) Sand, Clayey, Tan, Wet, Loose

(SM) Sand, Silty, Tan, Wet, Medium Dense to Dense

(ML) Silt, Sandy, Tan, Wet, Very Dense

(CH) Fat Clay, Tan to Reddish Brown, Moist, Stiff to Hard

Bottom of borehole at 60.0 feet.

1.5

NOTES Solid Stem Auger to 30' / Mud Rotary to 60'

GROUND ELEVATION 73.28 ft

LOGGED BY Chris T.

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. GIL

DATE STARTED 4/22/09 COMPLETED 4/22/09

AT TIME OF DRILLING 28.00 ft / Elev 45.28 ft during drilling

AT END OF DRILLING 20.00 ft / Elev 53.28 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-018

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SH

SH

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

4-5-6 (11)

5-7-9 (16)

3-4-5 (9)

5-5-10 (15)

6-9-11 (20)

9-14-16 (30)

11-15-18 (33)

14-17-19 (36)

13-18-21 (39)

12-15-18 (33)

14-17-17 (34)

7-9-14

NP

NP

NP

NP

Caliche Base Material, Roadway, 6" (ML) Silty, Dark Brown, Dry, Firm

(CL) Lean Clay, Slightly Sandy, Dark Brown, Dry, Stif

(CH) Fat Clay, Slightly Sandy, Dark Brown to Light Brown, Moist, Soft to Stiff

(SP-SM) Sand, Silty, Poorly Graded, Brown, Wet, Medium Dense

(SM) Sand, Silty, Brown, Wet, Dense

(CH) Fat Clay, Tan, Moist, Hard

(ML) Silt, Tan, Moist, Hard

(SC) Sand, Clayey, Dark Brown, Wet, Dense

(CH) Fat Clay, Tan, Moist, Hard

(CL) Lean Clay, Dark Brown to Tan, Moist, Stiff to Hard

4.5

4.5

NOTES Solid Stem Auger to 00' / Mud Rotary to 120'

GROUND ELEVATION 73.14 ft

LOGGED BY Angel / Ramiro

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/3/09 COMPLETED 5/3/09

AT TIME OF DRILLING 28.00 ft / Elev 45.14 ft during drilling

AT END OF DRILLING 21.00 ft / Elev 52.14 ft after24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-020

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(23)

11-13-14 (27)

7-7-13 (20)

9-12-15 (27)

7-7-10 (17)

8-7-14 (21)

8-13-15 (28)

9-20-26 (46)

20-40-47 (87)

31-39-43 (82)

21-17-20 (37)

31-33-33 (66)

16-17-20 (37)

(CL) Lean Clay, Dark Brown to Tan, Moist, Stiff to Hard (continued)

(SC) Sand, Clayey,Tan, Moist, Very Dense

(CL) Lean Clay, Tan, Moist, Hard

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-020

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

3-5-7 (12)

6-6-8 (14)

5-7-8 (15)

9-9-14 (23)

9-11-14 (25)

9-12-16 (28)

7-9-12 (21)

4-4-7 (11)

5-5-8 (13)

Caliche base material with gravel, roadway, 4" No samples obtained 0 to13 feet below top of levee.

(CL) Lean Clay, Slightly Silty, Tan, Wet, Soft

(CH) Fat Clay, Olive, Moist, Medium dense

(CL) Lean Clay, Slightly Silty, Olive, Dry, Stiff

(CH) Fat Clay, Slightly Sandy, Tan, Moist, Stiff

Bottom of borehole at 60.0 feet.

.5

NOTES Solid Stem Auger to 20' / Mud Rotary to 60'

GROUND ELEVATION 71.79 ft

LOGGED BY Chris T.

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. GIL

DATE STARTED 4/22/09 COMPLETED 4/22/09

AT TIME OF DRILLING 22.00 ft / Elev 49.79 ft during drilling

AT END OF DRILLING 11.00 ft / Elev 60.79 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-022

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SH

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

3-3-5 (8)

2-3-5 (8)

7-9-12 (21)

7-10-13 (23)

7-12-15 (27)

Caliche Base Material, Roadway, 4" No samples obtained 0 to 13 feet below top of levee.

(CH) Fat Clay, Dark Brown, Moist, Hard

(CL) Lean Clay, Sandy, Tan, Moist to Wet, Soft

(CH) Fat Clay, Sandy, Tan, Moist to Wet, Soft

(SC) Sand, Clayey, Tan, Wet, Loose

(CL) Lean Clay, Olive-Tan, Moist, Stiff

(CH) Fat Clay, Reddish-Brown, Moist, Stiff

Boring Terminated-Flowing Sand-Unable to Keep Borehole open

Bottom of borehole at 60.0 feet.

4.25

1.0

NOTES Solid Stem Auger to 25' / Mud Rotary to 60'

GROUND ELEVATION 70.89 ft

LOGGED BY A. Gomez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. GIL

DATE STARTED 4/11/09 COMPLETED 4/11/09

AT TIME OF DRILLING 23.00 ft / Elev 47.89 ft during drilling

AT END OF DRILLING --- Borehole Observed Dry after 24 hrs.

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-025

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SH

SH

SH

SH

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

4-7-8 (15)

4-5-8 (13)

4-7-8 (15)

5-8-9 (17)

4-7-8 (15)

5-7-10 (17)

7-9-15 (24)

7-10-11 (21)

5-10-13 (23)

6-7-9

Caliche Base Material, Roadway, 4" (CH) Fat Clay, Dark Brown, Moist, Firm

(CL) Lean Clay, Dark Brown to Light Brown, Moist, Firm to Stiff

(CH) Fat Clay, Reddish-Brown, Moist, Firm to Soft

(CL) Lean Clay, Reddish-Brown, Moist, Stiff

2.5

NOTES Solid Stem Auger to 30' / Mud Rotary to 120'

GROUND ELEVATION 70.34 ft

LOGGED BY A. Gomez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/3/08 COMPLETED 5/3/08

AT TIME OF DRILLING 30.00 ft / Elev 40.34 ft during drilling

AT END OF DRILLING 20.00 ft / Elev 50.34 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-028

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(16)

9-10-12 (22)

9-12-10 (22)

8-10-10 (20)

10-9-9 (18)

13-13-23 (36)

11-13-12 (25)

50-47-48 (95)

41-46-46 (92)

21-24-25 (49)

16-19-18 (37)

21-17-29 (46)

26-28-30 (58)

(CL) Lean Clay, Reddish-Brown, Moist, Stiff (continued)

(SM) Sand, Silty, Tan, Wet, Dense

(CL) Lean Clay, Sandy, Tan, Wet, Stiff

(SM) Sand, Silty, Brown, Wet, Very Dense

(CL) Lean Clay, Light Brown, Moist, Hard

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-028

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

6-8-12 (20)

20-20-23 (43)

20-24-40 (64)

35-45-50 (95)

38-35-31 (66)

19-23-33 (56)

19-22-29 (51)

19-23-27 (50)

12-15-20 (35)

Caliche Base Material, Roadway, 5" No samples obtained 0 to 13 feet below top of levee.

(CH) Fat Clay, Brown to Reddish Brown, Moist, Stiff to Hard

(CL) Lean Clay, Reddish Brown, Moist, Hard

Bottom of borehole at 60.0 feet.

NOTES Solid Stem Auger to 60'

GROUND ELEVATION 70.13 ft

LOGGED BY J. Holmes

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR Jordan Drilling, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/28/09 COMPLETED 4/28/09

AT TIME OF DRILLING --- None observed

AT END OF DRILLING 19.00 ft / Elev 51.13 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-030

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

5-6-7 (13)

3-4-3 (7)

5-6-4 (10)

4-5-7 (12)

2-3-3 (6)

4-3-4 (7)

6-6-8 (14)

5-10-15 (25)

7-10-14 (24)

7-7-6 (13)

11-13-16 (29)

10-10-11 (21)

9-11-12 (23)

10-9-10

Caliche Base Material, Roadway, 4" (CL) Lean Clay, Sandy , Light Brown, Moist to Dry, Soft to Firm

(CH) Fat Clay, Slightly Sandy, Dark Brown, Moist, Soft

(CL) Lean Clay, Slightly Sandy, Light Brown, Dry, Firm

(SP-SM) Sand, Silty, Poorly Graded, Brown, Wet, Medium Dense

(CL) Lean Clay, Sandy, Brown, Moist, Stiff

(CH) Fat Clay, Reddish-Brown, Moist, Firm to Stiff

(CL) Lean Clay, Reddish-Brown, Dry, Stiff

NOTES Solid Stem Auger to 00' / Mud Rotary to 120'

GROUND ELEVATION 70.39 ft

LOGGED BY Erasmo C.

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/3/09 COMPLETED 5/3/09

AT TIME OF DRILLING 32.00 ft / Elev 38.39 ft during drilling

AT END OF DRILLING 21.00 ft / Elev 49.39 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-032

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(19)

13-15-19 (34)

6-10-13 (23)

8-9-2 (11)

7-8-10 (18)

14-19-21 (40)

18-23-25 (48)

19-21-26 (47)

20-24-26 (50)

23-26-29 (55)

24-28-30 (58)

21-26-29 (55)

14-15-13 (28)

(CH) Fat Clay, Light Brown to Reddish-Brown, Dry, Stiff to Hard

(CL) Lean Clay, Reddish-Brown, Moist, Firm to Stiff

(SM) Sand, Silty, Brown, Wet, Dense

(SC) Sand, Clayey, Tan, Wet to Moist, Very Dense to Medium Dense

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-032

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SH

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

2-2-3 (5)

9-11-13 (24)

14-21-30 (51)

18-20-27 (47)

6-10-18 (28)

6-10-14 (24)

Caliche Base Material, Roadway, 4" No samples obtained 0 to 13 feet below top of levee.

(CL) Lean Clay, Dark Brown, Moist, Firm

(SC) Sand, Clayey, Light Brown, Moist, Very Loose

(SM) Sand, Silty, Tan, Wet, Medium Dense to Dense

(ML) Silt, Tan, Wet, Dense

(CH) Fat Clay, Reddish-Brown, Moist, Stiff

Borehole Terminated-Flowing Sand-Unable to Keep Borehole Open

Bottom of borehole at 60.0 feet.

2.5

0.5

NOTES Solid Stem Auger to 23.0' / Mud Rotary to 60'

GROUND ELEVATION 69.59 ft

LOGGED BY A. Gomez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR L&G Engineering Laboratory GROUND WATER LEVELS:

CHECKED BY R. GIL

DATE STARTED 4/11/09 COMPLETED 4/11/09

AT TIME OF DRILLING 23.50 ft / Elev 46.09 ft during drilling

AT END OF DRILLING 19.00 ft / Elev 50.59 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-035

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

6-7-8 (15)

3-3-5 (8)

3-3-3 (6)

2-2-2 (4)

3-5-7 (12)

4-6-8 (14)

4-5-6 (11)

5-7-8 (15)

9-12-14 (26)

11-14-16 (30)

10-16-20 (36)

7-10-16 (26)

5-9-4 (13)

8-12-15

Caliche Base Material, Roadway, 4" (SC) Sand, Clayey, Brown, Dry, Medium Dense

(CH) Fat Clay, Brown to Dark Brown, Dry to Moist, Soft to Firm

(CL) Lean Clay, Reddish Brown, Dry to Moist, Firm

(SM) Sand, Silty, Tan, Wet, Medium Dense

(ML) Silt, Brown, Wet, Medium Dense

(CH) Fat Clay, Reddish Brown, Dry to Moist, Medium Dense to Dense

NOTES Solid Stem Auger to 25' / Mud Rotary to 120'

GROUND ELEVATION 69.71 ft

LOGGED BY Rene Gonzalez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR JEDI, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/3/09 COMPLETED 5/3/09

AT TIME OF DRILLING 22.50 ft / Elev 47.21 ft during drilling

AT END OF DRILLING 18.00 ft / Elev 51.71 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-036

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(27)

9-12-18 (30)

8-10-12 (22)

6-9-10 (19)

6-7-11 (18)

9-12-15 (27)

11-13-17 (30)

13-15-16 (31)

9-11-13 (24)

10-13-14 (27)

12-16-18 (34)

15-16-20 (36)

17-19-24 (43)

NP

NP

(CH) Fat Clay, Reddish Brown, Dry to Moist, Medium Dense to Dense (continued)

(ML) Silt, Reddish Brown, Dry, Stiff

(CH) Fat Clay, Reddish Brown, Moist, Stiff

(SC) Sand, Clayey, Tan, Wet, Medium Dense

(CL) Lean Clay, Tan, Wet, Stiff

(SC) Sand, Clayey, Tan, Moist, Dense

(CL) Lean CLay, Reddish Brown, Dry to Wet, Stiff

(SM) Sand, Silty, Brown, Moist, Dense

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-036

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

4-6-8 (14)

3-4-21 (25)

3-3-7 (10)

23-27-33 (60)

50-50-50 (100)

10-14-21 (35)

24-23-26 (49)

23-23-26 (49)

20-15-21 (36)

Caliche Base Material, Roadway, 5" No samples obtained 0 to 13.5 feet below top of levee.

(CH) Fat Clay, Dark Brown, Moist, Stiff

(SC) Sand, Clayey, Light Brown, Moist, Medium Dense

(SP-SM) Sand, Silty, Poorly Graded, Brown, Wet, Loose

(SM) Sand, Silty, Brown, Wet, Very Dense

(CH) Fat Clay, Tan, Moist, Hard

Bottom of borehole at 60.0 feet.

NOTES Solid Stem Auger to 30' / Mud Rotary to 60'

GROUND ELEVATION 69.03 ft

LOGGED BY J. Holmes

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR Jordan Drilling, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/29/09 COMPLETED 4/29/05

AT TIME OF DRILLING 25.00 ft / Elev 44.03 ft during drilling

AT END OF DRILLING 21.00 ft / Elev 48.03 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-038

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

2-3-5 (8)

3-3-4 (7)

4-5-7 (12)

3-4-4 (8)

4-6-6 (12)

5-5-8 (13)

5-7-8 (15)

4-6-8 (14)

7-9-10 (19)

9-12-14 (26)

14-27-50 (77)

37-40-50 (90)

7-12-16 (28)

8-14-15

Caliche Base Material, Roadway, 6" (CH) Fat Clay, Slightly Sandy, Dark Brown, Moist Soft

(CL) Lean Clay, Slightly Sandy, Dark Brown, Moist, Firm

(CH) Fat Clay, Dark Brown to Reddish-Brown, Dry to Moist, Soft to Firm

(SC) Sand, Clayey, Reddish-Brown, Moist, Medium Dense

(CL) Lean Clay, Brown, Moist, Stiff

(SM) Sand, Silty, Brown, Wet, Very Dense

(CL) Lean Clay, Tan, Dry, Stiff

NOTES Solid Stem Auger to 30' / Mud Rotary to 120'

GROUND ELEVATION 69.37 ft

LOGGED BY Rene Gonzalez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR JEDI, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 5/2/09 COMPLETED 5/2/09

AT TIME OF DRILLING 27.50 ft / Elev 41.87 ft during drilling

AT END OF DRILLING 18.00 ft / Elev 51.37 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-040

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(29)

8-12-14 (26)

7-14-17 (31)

11-13-19 (32)

10-15-20 (35)

6-7-7 (14)

5-6-5 (11)

28-41-50 (91)

39-50-50 (100)

37-40-50 (90)

38-50-50 (100)

42-46-50 (96)

50-50-50 (100)

(CL) Lean Clay, Tan, Dry, Stiff (continued)

(CH) Fat Clay, Reddish Brown, Dry, Stiff

(SC) Sand, Clayey, Reddish-Brown, Dry, Dense

(CH) Fat Clay, Reddish-Brown, Moist, Hard

(SM) Sand, Silty, Tan to Brown, Moist, Medium Dense to Very Dense

(CL) Lean Clay, Sandy, Brown, Dry, Hard

(SM) Sand, Silty, Brown, Wet, Very Dense

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-040

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

2-2-2 (4)

2-1-1 (2)

4-5-9 (14)

14-20-24 (44)

29-38-50 (88)

37-50-50 (100)

38-50-50 (100)

23-33-36 (69)

27-27-27 (54)

23-24-33 (57)

Caliche Base Material, Roadway, 6" No samples obtained 0 to 13.5 feet below top of levee.

(SC) Sand, Clayey, Dark Brown to Brown, Moist to Wet, Very Loose

(SP-SM) Sand, Silty, Poorly Graded, Brown, Moist to Wet, Medium Dense to Dense to Very Dense

(CH) Fat Clay, Tan, Moist, Hard

(CL) Lean Clay, Tan, Moist, Hard

Bottom of borehole at 60.0 feet.

NOTES Solid Stem Auger to 20' / Mud Rotary to 60'

GROUND ELEVATION 69.17 ft

LOGGED BY J. Holmes

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR Jordan Drilling, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/29/09 COMPLETED 4/29/09

AT TIME OF DRILLING 20.00 ft / Elev 49.17 ft during drilling

AT END OF DRILLING 19.00 ft / Elev 50.17 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-042

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

6-4-9 (13)

2-3-2 (5)

2-1-2 (3)

3-2-2 (4)

3-4-5 (9)

4-6-7 (13)

4-5-7 (12)

8-11-18 (29)

17-28-50 (78)

14-16-24 (40)

6-11-14 (25)

9-14-18 (32)

8-14-17 (31)

11-17-18

Caliche Base Material, Roadway, 8" (CH) Fat Clay, Brown to dark Brown, Dry, Soft to Firm

(SP-SM) Sand, Silty, Poorly Graded, Brown, Wet, Medium Dense

(SM) Sand, Silty, Brown, Wet, Medium Dense

(SP-SM) Sand, Silty, Poorly Graded, Brown, Wet, Very Dense to Dense

(CH) Fat Clay, Tan, Moist, Stiff to Hard

(SC) Sand, Clayey, Tan, Wet to Moist, Medium Dense to Dense

NOTES Solid Stem Auger to 24' / Mud Rotary to 120'

GROUND ELEVATION 69.35 ft

LOGGED BY Rene Gonzalez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR JEDI, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/30/09 COMPLETED 4/30/09

AT TIME OF DRILLING 21.00 ft / Elev 48.35 ft during drilling

AT END OF DRILLING 20.00 ft / Elev 49.35 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-044

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(35)

12-14-16 (30)

6-7-9 (16)

7-12-15 (27)

9-11-17 (28)

6-9-12 (21)

19-36-50 (86)

38-46-50 (96)

43-50-50 (100)

41-46-50 (96)

36-40-50 (90)

28-36-50 (86)

21-34-50 (84)

(SC) Sand, Clayey, Tan, Wet to Moist, Medium Dense to Dense (continued)

(CL) Lean CLay, Tan, Moist, Stiff

(SM) Sand, Silty, Brown, Wet, Very Dense

(SP-SM) Sand, Silty, Poorly Graded, Brown, Wet, Very Dense

(SM) Sand, Silty, Light Brown, Wet, Very Dense

(CL) Lean Clay, Tan, Moist, Hard

(CH) Fat Clay, Tan, Moist, Hard

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-044

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

17-10-9 (19)

7-5-3 (8)

2-1-3 (4)

2-2-2 (4)

3-3-3 (6)

2-3-3 (6)

8-7-9 (16)

12-19-16 (35)

17-37-28 (65)

26-31-40 (71)

32-40-44 (84)

10-12-18 (30)

15-16-28 (44)

23-26-19 (45)

Caliche Base Material, Roadway, 8.5" (CL) Lean Clay, Sandy, Tan to Dark Brown, Dry to Moist, Stiff to Soft

(CL) Lean Clay, Silty, Tan, Moist, Soft

(SP-SM) Sand, Silty, Poorly Graded, Tan, Moist to Wet, Medium Dense to Dense

(SP-SM) Poorly Graded Sand w/ Silt, Moist, Very Dense

(CH) Fat Clay, Reddish-Brown, Moist, Stiff to Hard

Bottom of borehole at 60.0 feet.

NOTES Solid Stem Auger to 22' / Mud Rotary to 60'

GROUND ELEVATION 69.44 ft

LOGGED BY B. Wylie

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR Jordan Drilling, Inc. GROUND WATER LEVELS:

CHECKED BY R. GIL

DATE STARTED 4/11/09 COMPLETED 4/11/09

AT TIME OF DRILLING 22.00 ft / Elev 47.44 ft during drilling

AT END OF DRILLING 19.00 ft / Elev 50.44 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-045

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

9-13-9 (22)

7-9-12 (21)

3-2-3 (5)

2-3-3 (6)

3-3-3 (6)

3-3-3 (6)

2-3-4 (7)

3-5-6 (11)

10-13-15 (28)

18-19-18 (37)

9-11-15 (26)

8-10-14 (24)

7-11-16 (27)

6-9-12

Caliche Base Material, Roadway, 6" (CL) Lean Clay, Slightly Sandy, Light Brown, Dry, Stiff

(SC) Sand, Clayey, Dark Brown, Dry, Loose

(CL) Lean Clay, Sandy, Brown, Moist, Soft

(SM) Sand, Silty, Light Brown, Moist, Loose

(SP-SM) Sand, Silty, Poorly Graded, Light Brown, Moist, Loose to Medium Dense

(SM) Sand, Silty, Light Brown, Wet, Dense

(CL) Lean Clay, Sandy, Light Brown to Reddish-Brown, Dry to Moist, Stiff

NOTES Solid Stem Auger to 20' / Mud Rotary to 120'

GROUND ELEVATION 69.65 ft

LOGGED BY Rene Gonzalez

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR JEDI, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/29/09 COMPLETED 4/29/09

AT TIME OF DRILLING 19.50 ft / Elev 50.15 ft during drilling

AT END OF DRILLING 22.00 ft / Elev 47.65 ft after 24 hours

AFTER DRILLING ---

HOLE SIZE 4 inches

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

(Continued Next Page)

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-048

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(21)

8-11-13 (24)

8-10-14 (24)

10-11-16 (27)

5-6-9 (15)

5-9-17 (26)

7-11-19 (30)

8-12-18 (30)

13-18-29 (47)

11-26-50 (76)

31-40-50 (90)

41-50-50 (100)

46-50-50 (100)

(CL) Lean Clay, Sandy, Light Brown to Reddish-Brown, Dry to Moist, Stiff (continued)

(SC) Sand, Clayey, Tan, Moist, Medium Dense

(CL) Lean Clay, Sandy, Light Brown, Dry, Stiff

(CH) Fat Clay, Tan, Moist, Stiff

(SC) Sand, Clayey, Tan, Moist, Dense to Very Dense

Bottom of borehole at 120.0 feet.

S A

M P

LE

T

Y P

E N

U M

B E

R

R E

C O

V E

R Y

(R

Q D

B

LO

W C

O U

N T

S (N

V A

LU

E

D R

Y U

N

IT

W T

(p cf

M O

IS

T

U R

E C

O N

T E

N T

LI

Q

U

ID

LI

M

IT

P

LA

S T

IC

LI

M

IT

P

LA

S T

IC

IT

Y

IN

D E

X

F

IN

E S

C O

N T

E N

T

ATTERBERG

LIMITS

P

LA

S T

IC

IT

Y

IN

D E

X

G R

A P

H

IC

LO

G

D E

P T

H (f t)

MATERIAL DESCRIPTION

P O

C K

E T

P E

N

(t sf

BORING NUMBER BH-048

CLIENT S&B Infrastructure

PROJECT NUMBER NFW2

PROJECT NAME North Floodway Inp. Project - East & West Segments

PROJECT LOCATION Hidalgo County Texas

G E

O T

E C

H B

H C

O

LU

M N

S

G

IN

T S

T D

U S

L A

B .G

D T

/2 0/

:1

\\S

0\ L

A B

O R

A T

O R

Y \G

IN

T

\P R

O

JE

C T

S \N

F W

2.

G

P J

L&G Engineering Laboratory LLC 2100 W. Expressway 83

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

SPT

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

(100)

6-6-7 (13)

6-7-8 (15)

4-4-4 (8)

4-4-6 (10)

2-3-3 (6)

4-2-4 (6)

1-1-1 (2)

11-13-20 (33)

18-22-31 (53)

36-45-50 (95)

24-30-33 (63)

13-21-23 (44)

14-16-25 (41)

25-23-30 (53)

Caliche Base Material, Roadway, 6" (CL) Lean Clay, Slightly Sandy, Dark Brown, Dry, Firm to Hard

(CH) Fat Clay, Slightyly Sandy, Dark Brown, Moist, Soft

(SC) Sand, Clayey, Brown, Wet, Dense to Very Dense

(CL) Lean Clay, Tan to Reddish Brown, Moist, Hard

(CH) Fat Clay, Reddish-Brown, Moist, Hard

Bottom of borehole at 60.0 feet.

NOTES Solid Stem Auger to 20' / Mud Rotary to 60'

GROUND ELEVATION 69.54 ft

LOGGED BY J. Holmes

DRILLING METHOD Solid Stem Auger / Mud Rotary

DRILLING CONTRACTOR Jordan Drilling, Inc. GROUND WATER LEVELS:

CHECKED BY R. Gil

DATE STARTED 4/30/09 COMPLETED 4/30/09

AT TIME OF DRILLING 20.00 ft / Elev 49.54 ft during drilling

AT END…