Recovery chippewa CG wastewater project at the chippewa campground chequmegon-nicolet national forest
Award Notice Posted
- Solicitation number
- AG-4419-S-10-0720
- Agency
-
Operations Center East
Economic Recovery Operations, Department of Agriculture
- Awarded
- to John S. Olynick, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-4419-C-10-0581 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Usda Forest Service Chippewa Campground Chequmegon-Nicolet National Forest Florence, Wisconsin 54121, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
RECOVERY - This project is funded in whole by the American Recovery and Reinvestment Act (ARRA) PROJECT DESCRIPTION: Summary of Scope of Work: Construction Service includes demolition of existing wastewater utility system and replacement of the wastewater collection and treatment system including pressure sewer, STEP stations, wastewater treatment facility, lagoon abandonment, and surface restoration work including asphalt paving. PROJECT LOCATION: The project is located in Taylor County, Wisconsin. ESTIMATE COST RANGE: between $500,000 and $1,000,000. SET-ASIDE: UNRESTRICTED IN ACCORDANCE WITH THE SMALL BUSINESS COMPETITIVENESS DEMONSTRATION PROJECT. SOLICITATION DOCUMENTS, SPECIFICATIONS, and DRAWINGS: The solicitation, AG-4419-S-10-0720 will be issued via FedBizOpps, as an RFP and will be available for downloading on or about 6/15/2010 at the website address: http://www.fedbizopps.gov/ All vendors are required to be registered in the Central Contractor Registration (CCR) prior to award of a contract, http://www.ccr.gov/ **THIS PROJECT SET-ASIDE UNRESTRICTED**
**SEE ATTACHED SF30 AMENDMENT AND REVISED RFP*******
PROPOSAL DUE DATE CHANGE FROM JULY 27, 2010 TO JULY 16, 2010.
Update #1 ·
RECOVERY - This project is funded in whole by the American Recovery and Reinvestment Act (ARRA)
PROJECT DESCRIPTION: Summary of Scope of Work:
Construction Service includes demolition of existing wastewater utility system and replacement of the wastewater collection and treatment system including pressure sewer, STEP stations, wastewater treatment facility, lagoon abandonment, and surface restoration work including asphalt paving.
PROJECT LOCATION: The project is located in Taylor County, Wisconsin.
ESTIMATE COST RANGE: between $500,000 and $1,000,000. SET-ASIDE: UNRESTRICTED IN ACCORDANCE WITH THE SMALL BUSINESS COMPETITIVENESS DEMONSTRATION PROJECT.
SOLICITATION DOCUMENTS, SPECIFICATIONS, and DRAWINGS: The solicitation, AG-4419-S-10-0720 will be issued via FedBizOpps, as an RFP and will be available for downloading on or about 6/15/2010 at the website address: http://www.fedbizopps.gov/
All vendors are required to be registered in the Central Contractor Registration (CCR) prior to award of a contract, http://www.ccr.gov/
**THIS PROJECT SET-ASIDE UNRESTRICTED**
Files
| File | Type | Posted |
|---|---|---|
| Questions Answers.pdf | ||
| amendment.pdf | ||
| Revised RFP0720.pdf | ||
| Specifications revised.pdf | ||
| 22x34 PlansDrawings.pdf | ||
| Construction RFP.pdf | ||
| 11x17 PlansDrawings.pdf |