Recovery - Buck Forest and Fuels Roads Drainage Improvement

Award Notice Posted

Solicitation number
AG-0489-S-10-0256
Agency
Awarded
to Cook & Sons Construction, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
AG0489C100203 Federal contract award
PSC
Not on record
Place of performance
Roads for which maintenance is required will be listed in the solicitation. The area of work involves roads within the Cub Creek watershed and its immediate vicinity, within the Methow Valley Ranger District. This area lies in the north central part of Washington State. No site visit is scheduled. Winthrop, Washington 98862, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) PROCUREMENT. Recovery Buck Forest and Fuels Roads Drainage Improvement



The U.S. Forest Service, EROC-NW, servicing Region 6 has a requirement to provide for the routine and reoccurring maintenance of Forest Service roads found within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest. Project work may include but is not limited to the blading of aggregate and native surfaced single lane roads, ditch cleaning, and culvert cleaning.



Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to maintain the facilities in accordance with drawings and specifications of the contract. Contractor will be paid for actual work performed. Items of work not listed herein that are considered within the general scope of the contract shall be negotiated on a lump sum basis based on material and equipment rental unit prices established in the contract. Award will be made in sufficient time for planning and preparation with on-site work to start on or about June 15, 2010. The period of performance is 90 calendar days after receipt of Notice to Proceed.



A negotiated, firm-fixed price contract is contemplated requiring submission of both a technical and a price proposal. Award will be made to the offeror whose proposal offers the best value to the Government.



This acquisition is determined to be under the Small Business Competitiveness Demonstration Program and 100% Small Business set aside. Contractors are required to be registered with the Central Contractor Registration (CCR) and the Online Representations and Certifications Application (ORCA). The solicitation with specifications and wage rates will be posted to the https://www.fbo.gov/ website on or about Feburary 19, 2010. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the Request for Proposal package and any applicable amendments, offerors must download them from the https://www.fbo.gov/ website.



Update #1 ·

THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) PROCUREMENT. Recovery Buck Forest and Fuels Roads Drainage Improvement



The U.S. Forest Service, EROC-NW, servicing Region 6 has a requirement to provide for the routine and reoccurring maintenance of Forest Service roads found within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest. Project work may include but is not limited to the blading of aggregate and native surfaced single lane roads, ditch cleaning, and culvert cleaning.



Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to maintain the facilities in accordance with drawings and specifications of the contract. Contractor will be paid for actual work performed. Items of work not listed herein that are considered within the general scope of the contract shall be negotiated on a lump sum basis based on material and equipment rental unit prices established in the contract. Award will be made in sufficient time for planning and preparation with on-site work to start on or about June 15, 2010. The period of performance is 90 calendar days after receipt of Notice to Proceed.



A negotiated, firm-fixed price contract is contemplated requiring submission of both a technical and a price proposal. Award will be made to the offeror whose proposal offers the best value to the Government.



This acquisition is determined to be under the Small Business Competitiveness Demonstration Program and 100% HubZone set aside. Contractors are required to be registered with the Central Contractor Registration (CCR) and the Online Representations and Certifications Application (ORCA). The solicitation with specifications and wage rates will be posted to the https://www.fbo.gov/ website on or about Feburary 19, 2010. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the Request for Proposal package and any applicable amendments, offerors must download them from the https://www.fbo.gov/ website.



Files

File Type Posted
833 drainage structure installation or removal pbsc.docx DOCX document
Buck ARRA Vicinity Map.docx DOCX document
Buck ARRA Roads Listing.docx DOCX document
BUCK SOLICITATION.docx DOCX document
Buck ARRA roads map.docx DOCX document
811_Surface Maintenance_perf_based.docx DOCX document
abbrev_MLs_Rd_Structure_details.docx DOCX document
834-1_Catch_Basin_Cleaning_Illustration.pdf PDF
832_Load_Haul_and_Place_Materials_perf_based.docx DOCX document
834_Roadway_Drainage_System_Maintenance_pbsc.docx DOCX document
881_Mob_Equip_Moving_pbsc.docx DOCX document
833-7 LowboyDrainDip.pdf PDF
808_work area management.docx DOCX document
BUCK BID PACKAGE.docx DOCX document
102-1_Illustration_of_Road_Structure_Terms.pdf PDF
Show all 15

Notice history

Notice Type Posted
Recovery - Buck Forest & Fuels roads Drainage Improvement Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors