832_Load_Haul_and_Place_Materials_perf_based.docx

DOCX document 21 KB Posted

Attached to
Recovery - Buck Forest and Fuels Roads Drainage Improvement
Solicitation number
AG-0489-S-10-0256
Issued by

About this file

832 Load Haul and Place Materials

View the file

Other files

File Type Posted
BUCK SOLICITATION.docx DOCX document
Buck ARRA roads map.docx DOCX document
834_Roadway_Drainage_System_Maintenance_pbsc.docx DOCX document
811_Surface Maintenance_perf_based.docx DOCX document
881_Mob_Equip_Moving_pbsc.docx DOCX document
833 drainage structure installation or removal pbsc.docx DOCX document
Buck ARRA Vicinity Map.docx DOCX document
Buck ARRA Roads Listing.docx DOCX document
abbrev_MLs_Rd_Structure_details.docx DOCX document
833-7 LowboyDrainDip.pdf PDF
834-1_Catch_Basin_Cleaning_Illustration.pdf PDF
BUCK BID PACKAGE.docx DOCX document
808_work area management.docx DOCX document
102-1_Illustration_of_Road_Structure_Terms.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

832 LOAD, HAUL, AND PLACE MATERIALS

832.01 Service Required

Load, haul, and place material at designated sites.

832.02 Performance Standard

Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and revegetation as ordered by the Contracting Officer.

832.03 Location of Work

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

832.04 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles.

B. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

832.05 Payment

A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 832 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item Pay Unit

832(1) Load, Haul, and Place MaterialCubic Yard
832(2) Load, Haul, and Place MaterialMile
832(3) Load, Haul, and Place MaterialLump Sum

832 – LOAD, HAUL, AND PLACE MATERIALS (09/10/04) 1

832.06 Acceptable Quality Levels

Description
Major
Minor
Allowable Defects
Required Action
Defect
Defect
Major
Minor
Major
Minor
Slopes
Unstable material left on slopes
Material left on slopes that can be stabilized and won't block drainages
0
N/A
Remove
N/A
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0
N/A
Repair and Stabilize
Revegetate if greater than X minor defects
Ditches, inlet/outlet channels, streams and catch basins
water will be diverted out of the drainage structure or soil enters system
< 20% impeded, but water will stay in the channel.
0
10% of work ordered
Rework
Rework if greater than 10% of work ordered
Debris on Road (ML 4-5)
Any debris in traveled way
Debris in traveled way that may slow or impede traffic.
0
0
Rework
Rework
Debris on Road (ML 3)
Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic.
0
Greater than 10% of road length treated
Rework
Rework
Debris on Road (ML 2)
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles
0
Greater than 10% of road length treated
Rework
Rework

Placed Material (Disposal Sites) Unstable material on designated sites.

N/A

0
N/A
Stabilize

N/A

Revegetation
No revegetation work done
Revegetation work incomplete
N/A
N/A
N/A
N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0
0
Suspend work until in compliance
Suspend work until in compliance