833 Drainage Structure Installation or Removal

View the file

Other files

File Type Posted
BUCK SOLICITATION.docx DOCX document
Buck ARRA roads map.docx DOCX document
834_Roadway_Drainage_System_Maintenance_pbsc.docx DOCX document
811_Surface Maintenance_perf_based.docx DOCX document
881_Mob_Equip_Moving_pbsc.docx DOCX document
Buck ARRA Vicinity Map.docx DOCX document
Buck ARRA Roads Listing.docx DOCX document
abbrev_MLs_Rd_Structure_details.docx DOCX document
833-7 LowboyDrainDip.pdf PDF
832_Load_Haul_and_Place_Materials_perf_based.docx DOCX document
834-1_Catch_Basin_Cleaning_Illustration.pdf PDF
BUCK BID PACKAGE.docx DOCX document
808_work area management.docx DOCX document
102-1_Illustration_of_Road_Structure_Terms.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

833 DRAINAGE STRUCTURE INSTALLATION OR REMOVAL (8/07)

833.01 Service Required

Install or remove drainage structures including culverts, water-bars, drivable drain dips, and cross ditches.

833.02 Performance Standard

Drainage structure installation is complete when culverts, water-bars, drivable drain dips and cross ditches have been installed to the lines and grades specified, and drainage structure removal is complete when designated culverts, water-bars and cross ditches have been removed and culverts have been properly disposed of.

833.03 Location of Work

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

833.04 Measurement

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

B. Linear Foot: Work activities by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot. Culvert bands are incidental to the installation.

833.05 Payment

A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 833 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item Description Pay Unit

833(1)______ Inch corrugated metal pipe,
______ Inch thickness for steel,
______ Inch thickness for aluminum or
______ Inch thickness for PlasticLinear Foot
833(2)Culvert RemovalEach
833(3)Water-bar InstallationEach
833(4)Water-bar InstallationMile
833(5)Water-bar RemovalEach
833(6)Water-bar RemovalMile
833(7)Cross Ditch InstallationEach
833(8)Cross Ditch InstallationMile
833(9)Cross Ditch RemovalEach
833(10)Cross Ditch RemovalMile
833(11)Drivable Grade Dip InstallationEach
833(12)Drivable Grade Dip InstallationMile

833 - DRAINAGE STRUCTURE INSTALLATION OR REMOVAL (08/21/07) 2

833.06 Acceptable Quality Levels

Description
Major
Minor
Allowable Defects
Required Action
Defect
Defect
Major
Minor
Major
Minor
Culvert size
Culvert is smaller than the designated diameter shown on the drawings.
Culvert is larger than the designated diameter shown on the drawings.
0
N/A
Remove culvert and replace with designated size
Accept if culvert fits the geometry of the road but pay at designated size otherwise replace
Culvert is shorter than the designated length shown on the drawings.
Culvert is longer than the designated length shown on the drawings.
0
0
Replace or add section to fit geometry of road.
Remove excess culvert and treat cut end, or harden fill slope to prevent erosion and pay for ordered length
Grade and alignment of culvert
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
0
1 per unit
Remove and replace culvert
Repair if greater than X minor defects *
Sag or depression in road after placement of culvert and backfill material
Greater than 2 inch depression in traveled way
2 inch or less depression in traveled way
0
1 per unit
Furnish, place and compact designated material to repair depression.
Repair if greater than X minor defects *
Removed culvert or pieces left on National Forest System Lands
Culverts or pieces of culvert left on National Forest System Lands
N/A
0
N/A
Remove from National Forest System Lands
N/A
Water-bars and cross ditches
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
0
1 per unit
Rework
Rework if greater than X minor defects *
Drivable grade dip
More than 10% deviation from specified lines and grades
10% or less deviation from specified lines and grades
0
1 per unit

Rework Rework if minor defects interfere with proper drainage

Sedimentation
Operations cause or allow sediment to leave site.
N/A
0
N/A
Cease operations until sediment is controlled
N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0
0
Suspend work until in compliance
Suspend work until in compliance

* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.

Intent and use: User to establish threshold for the acceptable level of quality.