881_Mob_Equip_Moving_pbsc.docx
DOCX document 21 KB Posted
- Solicitation number
- AG-0489-S-10-0256
About this file
881 Mobilization/Equipment Moving
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BUCK SOLICITATION.docx | DOCX document | |
| Buck ARRA roads map.docx | DOCX document | |
| 834_Roadway_Drainage_System_Maintenance_pbsc.docx | DOCX document | |
| 811_Surface Maintenance_perf_based.docx | DOCX document | |
| 833 drainage structure installation or removal pbsc.docx | DOCX document | |
| Buck ARRA Vicinity Map.docx | DOCX document | |
| Buck ARRA Roads Listing.docx | DOCX document | |
| abbrev_MLs_Rd_Structure_details.docx | DOCX document | |
| 833-7 LowboyDrainDip.pdf | ||
| 832_Load_Haul_and_Place_Materials_perf_based.docx | DOCX document | |
| 834-1_Catch_Basin_Cleaning_Illustration.pdf | ||
| BUCK BID PACKAGE.docx | DOCX document | |
| 808_work area management.docx | DOCX document | |
| 102-1_Illustration_of_Road_Structure_Terms.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
881 MOBILIZATION / EQUIPMENT MOVING
881.01 Service Required
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment outside the established work schedule as ordered.
881.02 Performance Standards
A. Make equipment available for inspection before it is used on National Forest System lands.
B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
C. Equipment will be clean and weed free before it arrives on National Forest System lands.
881.03 Location of Work:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
881.04 Measurement:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.
881.05 Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 881 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
881(1) Mobilization Lump Sum
813 - SPOT SURFACING (03/21/2007) 2
881.06 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Weed free equipment |
| Equipment not weed free. |
| N/A |
| 0 |
| N/A |
| Equipment rejected until it can be made weed free |
| N/A |
| Ordered Movement of Equipment |
| Equipment not moved within designated time |
| N/A |
| X |
| N/A |
| Reduce unit cost by X for X amount of time over designated time |
| N/A |
| Equipment meets all state and federal regulations |
| Does not meet state and federal regulations |
| N/A |
| 0 |
| N/A |
| Bring equipment up to state and federal regulations or replace equipment |
| N/A |
| Equipment leaks |
| Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment |
| Small leaks inherent in the specific type equipment |
| 0 |
| N/A |
| Replace equipment and restore affected site as directed by the Contracting Officer |
| Place absorbent pads under equipment when not operating. |
File details come from the government source that posted it. Updated .