881 Mobilization/Equipment Moving

View the file

Other files

File Type Posted
BUCK SOLICITATION.docx DOCX document
Buck ARRA roads map.docx DOCX document
834_Roadway_Drainage_System_Maintenance_pbsc.docx DOCX document
811_Surface Maintenance_perf_based.docx DOCX document
833 drainage structure installation or removal pbsc.docx DOCX document
Buck ARRA Vicinity Map.docx DOCX document
Buck ARRA Roads Listing.docx DOCX document
abbrev_MLs_Rd_Structure_details.docx DOCX document
833-7 LowboyDrainDip.pdf PDF
832_Load_Haul_and_Place_Materials_perf_based.docx DOCX document
834-1_Catch_Basin_Cleaning_Illustration.pdf PDF
BUCK BID PACKAGE.docx DOCX document
808_work area management.docx DOCX document
102-1_Illustration_of_Road_Structure_Terms.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

881 MOBILIZATION / EQUIPMENT MOVING

881.01 Service Required

A. Mobilization of personnel, equipment, and material to the project site.

B. Moving of equipment outside the established work schedule as ordered.

881.02 Performance Standards

A. Make equipment available for inspection before it is used on National Forest System lands.

B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.

C. Equipment will be clean and weed free before it arrives on National Forest System lands.

881.03 Location of Work:

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

881.04 Measurement:

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.

881.05 Payment

A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 881 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.

Pay Item Pay Unit

881(1) Mobilization Lump Sum

813 - SPOT SURFACING (03/21/2007) 2

881.06 Acceptable Quality Levels

Description
Major
Minor
Allowable Defects
Required Action
Defect
Defect
Major
Minor
Major
Minor
Weed free equipment
Equipment not weed free.
N/A
0
N/A
Equipment rejected until it can be made weed free
N/A
Ordered Movement of Equipment
Equipment not moved within designated time
N/A
X
N/A
Reduce unit cost by X for X amount of time over designated time
N/A
Equipment meets all state and federal regulations
Does not meet state and federal regulations
N/A
0
N/A
Bring equipment up to state and federal regulations or replace equipment
N/A
Equipment leaks
Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment
Small leaks inherent in the specific type equipment
0
N/A
Replace equipment and restore affected site as directed by the Contracting Officer
Place absorbent pads under equipment when not operating.