RECOVERY - 10 Cooper Elk Road

Awarded Award Notice Posted

Solicitation number
AG-82B1-S-09-0101
Agency
Operations Center Intermountain Economic Recovery Operations, Department of Agriculture
Awarded
to Latigo Construction Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG82B1C100026 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Lolo National Forest Missoula, Montana 59804, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Sep 01, 2009 10:37 am This project consists of 18.11 miles of road reconstruction involving reconditioning, ditch construction, surface drainage, roadway narrowing, catchbasin reconditioning and construction, placement of surface aggregate, cleaning of culverts and installation of signs and gate. In addition is the replacement of the existing culvert on West Fork Butte Creek with a 19 span x 9-5 rise structural plate arch with concrete footings and all associated streambed simulation



This project is located approximately 15 air miles southwest of Missoula, Montana in the Lolo Creek Drainage. It can be reached by taking Highway 93 south of Missoula to the intersection with Highway 12 at Lolo. Travel west on Highway 12 to the intersection of Road 451 at MileMarker 22.6. The government furnished stockpile of riprap is located along road 451 in Sec. 28, T.11N., R.22E.



The Forest Service intends to issue a solicitation for this project using FAR Part 14 procedures for sealed bidding. The solicitation package for this project should be available approximately 10 September 2009 and will be posted on the FEDBIZOPPS website. It will contain all information necessary to formulate and submit a bid.



The project cost estimate is between $250,000 and $500,000. Performance and Payment Bonds will be required per the Miller Act. Davis-Bacon wage rates will apply.



All responsible sources may submit a response which, if timely received, will be considered by the Forest Service. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Database prior to award of a contract. Lack of registration in the CCR on the part of the bidder will render a bidder ineligible for award. Bidders may obtain information on registration and annual confirmation requirements by call 888-227-2423 or via the Internet at http:www.ccr.gov//.

Attachments

Files attached to this notice, newest first
File Type Posted
Amend 1 SF_30.doc DOC document
Doc4 10 Cooper Elk Supplemental Specs.doc DOC document
95093594.pdf PDF
Doc5 10 Cooper Elk 41-51drawings.pdf PDF
Doc5 10 Cooper Elk 31-40drawings.pdf PDF
AG-82B1-S-09-0101.rtf RTF text file
Doc5 10 Cooper Elk 21-30drawings.pdf PDF
Doc5 10 Cooper Elk 11-20drawings.pdf PDF
General Decision Number.doc DOC document
Doc5 10 Cooper Elk 1-10drawings.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
RECOVERY - 10 Cooper Elk Road Latest Award Notice
RECOVERY - 10 Cooper Elk Road This notice · Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity