RECOVERY - 10 Cooper Elk Road
Awarded Award Notice Posted
- Solicitation number
- AG-82B1-S-09-0101
- Agency
- Operations Center Intermountain Economic Recovery Operations, Department of Agriculture
- Awarded
- to Latigo Construction Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG82B1C100026 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Lolo National Forest Missoula, Montana 59804, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Sep 01, 2009 10:37 am
This project consists of 18.11 miles of road reconstruction involving reconditioning, ditch construction, surface drainage, roadway narrowing, catchbasin reconditioning and construction, placement of surface aggregate, cleaning of culverts and installation of signs and gate. In addition is the replacement of the existing culvert on West Fork Butte Creek with a 19 span x 9-5 rise structural plate arch with concrete footings and all associated streambed simulation
This project is located approximately 15 air miles southwest of Missoula, Montana in the Lolo Creek Drainage. It can be reached by taking Highway 93 south of Missoula to the intersection with Highway 12 at Lolo. Travel west on Highway 12 to the intersection of Road 451 at MileMarker 22.6. The government furnished stockpile of riprap is located along road 451 in Sec. 28, T.11N., R.22E.
The Forest Service intends to issue a solicitation for this project using FAR Part 14 procedures for sealed bidding. The solicitation package for this project should be available approximately 10 September 2009 and will be posted on the FEDBIZOPPS website. It will contain all information necessary to formulate and submit a bid.
The project cost estimate is between $250,000 and $500,000. Performance and Payment Bonds will be required per the Miller Act. Davis-Bacon wage rates will apply.
All responsible sources may submit a response which, if timely received, will be considered by the Forest Service. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Database prior to award of a contract. Lack of registration in the CCR on the part of the bidder will render a bidder ineligible for award. Bidders may obtain information on registration and annual confirmation requirements by call 888-227-2423 or via the Internet at http:www.ccr.gov//.
Attachments
| File | Type | Posted |
|---|---|---|
| Amend 1 SF_30.doc | DOC document | |
| Doc4 10 Cooper Elk Supplemental Specs.doc | DOC document | |
| 95093594.pdf | ||
| Doc5 10 Cooper Elk 41-51drawings.pdf | ||
| Doc5 10 Cooper Elk 31-40drawings.pdf | ||
| AG-82B1-S-09-0101.rtf | RTF text file | |
| Doc5 10 Cooper Elk 21-30drawings.pdf | ||
| Doc5 10 Cooper Elk 11-20drawings.pdf | ||
| General Decision Number.doc | DOC document | |
| Doc5 10 Cooper Elk 1-10drawings.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY - 10 Cooper Elk Road | Award Notice | |
| RECOVERY - 10 Cooper Elk Road | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity