Amend 1 SF_30.doc

DOC document 89 KB Posted

Attached to
RECOVERY - 10 Cooper Elk Road Federal contract opportunity
Solicitation number
AG-82B1-S-09-0101
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - 10 Cooper Elk Road, newest first.
File Type Posted
Doc4 10 Cooper Elk Supplemental Specs.doc DOC document
AG-82B1-S-09-0101.rtf RTF text file
Doc5 10 Cooper Elk 21-30drawings.pdf PDF
95093594.pdf PDF
Doc5 10 Cooper Elk 41-51drawings.pdf PDF
Doc5 10 Cooper Elk 31-40drawings.pdf PDF
Doc5 10 Cooper Elk 11-20drawings.pdf PDF
General Decision Number.doc DOC document
Doc5 10 Cooper Elk 1-10drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRIVATE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

PRIVATE

2. AMENDMENT/MODIFICATION NO.PRIVATE

One

3. EFFECTIVE DATE

10/9/2009

4. REQUISITION/PURCHASE REQ. NO

5. PROJECT NO. (If applicable)

PRIVATE

6. ISSUED BY

CODE
7. ADMINISTERED BY (IF OTHER THAN ITEM 6)
CODE

PRIVATE

USDA - Forest Service

Intermountain EROC

740 Simms Street

Golden, CO 80401

PRIVATE

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and Zip Code)

FORMCHECKBOX

9A. AMENDMENT OF SOLICITATION NO. AG-82B1-S-09-0101

9B. DATED (SEE ITEM 11) 9/18/2009

FORMCHECKBOX

10A. MODIFICATION OF CONTRACT/ORDER NO.

CODE:

FACILITY CODE:

10B. DATED (SEE ITEM 11)

PRIVATE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered, solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning ONE copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers, FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

PRIVATE

12. ACCOUNTING AND APPROPRIATION DATA (If Required)

PRIVATE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO., AS DESCRIBED IN ITEM 14

PRIVATE

FORMCHECKBOX

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43,103 (b).

FORMCHECKBOX

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D. OTHER (Specify type of modification and authority)

PRIVATE

E. IMPORTANT: Contractor

FORMCHECKBOX

is NOT
FORMCHECKBOX
is required to sign this document and return
copies to the issuing office.

PRIVATE

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The purpose of this amendment to the above solicitation is to correct quantities for two items on the Schedule of Items. The first is Pay Item 251(10)1 which should be 4.5 CY of RipRap - this also should be 4.5 CY on page 5 of the drawings - the 4.25 as shown. The second is Pay Item 622(01) which should be 8 hours in the Schedule of Items as shown on page 6 of the drawings. Thus the new quantites for the SCHEDULE OF ITEMS are 251(10)1 - 4.5 CY & 622(01) - 8 HRS. This should be reflected in your total bid provided.

Additionally on the Schedule of Items - the header for ROAD 2174 was left mistakenly changed to Road 451. The items and quantities are correct the heading shows two Road 451 and the second one is actually ROAD 2174.

Call Bill Pfeifer at 406-587-6760 if you have any questions regarding this amendment.

PRIVATE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

PRIVATE

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

WILLIAM M. PFEIFER

PRIVATE

15B. CONTRACTOR/OFFEROR

15C. DATE

SIGNED

16B. UNITED STATES OF AMERICA

16C. DATE

SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

STANDARD FORM 30 (REV. 10-83)

Previous Edition Unusable

Prescribed by GSA FAR (48 CFR) 53.243

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

(a) Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date)

(1) For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

(2) For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

(3) For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

(4) For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

(5) For a modification confirming the contacting officer’s determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor’s name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9. (Amendment of Solicitation No. – Dated) and 10. (Modification of Contract/Order No.-Dated). Check the appropriate box and in the corresponding blanks insert the

Number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Date). When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(1) Accounting classification………..

Net Increase

(2) Accounting classification ……….

Net Decrease

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words “See continuation sheet.”

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103).

Item 14 (Description of Amendment/Modification).

(1) Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.

(2) Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $…….

(ii)Total contract price decreased by $……

(iii)Total contract price unchanged.

(3) State reason for modification.

(4) When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

(5) When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited –

(i) A reference to the letter determination; and

(ii)A statement of the net amount determined to be due in settlement of the contract.

(6) Include subject matter or short title of solicitation/contract where feasible.

Item 16B. The contracting officer’s signature is not required on solicitation amendments. The contracting officer’s signature is normally affixed last on supplemental agreements.

STANDARD FORM 30 (Rev 10-83) BACK

File details come from the government source that posted it. Updated .