RDU ATCT Parking Lot Improvements - Infrastructure Investment and Jobs Act (IIJA)
Closed Solicitation Posted
- Solicitation number
- 6973GH-25-R-00053
- Agency
-
Franchise Acquisition Servies
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Morrisville, North Carolina 27560, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Aviation Administration (FAA) is seeking a contractor to replace a slide gate at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Morrisville, NC. The procurement is a Firm Fixed-Price contract funded through the Bipartisan Infrastructure Law, with a targeted NAICS code of 238990 and a business size standard of $19M. Contractors must be registered in the System for Award Management (SAM) and will be responsible for quarterly reporting requirements related to the infrastructure project. The FAA will evaluate offers based on lowest price and responsibility, with offerors required to submit two Organizational Experience Questionnaires showing relevant projects valued over $350,000 completed within the past three years. Key dates include a mandatory site visit scheduled for December 10, 2024, at 0900 EST, and a proposal submission deadline of March 21, 2025, at 1700 CT, with all questions to be submitted in writing to Samantha.A.Pearce@faa.gov no later than one week prior to the closing date.
The solicitation is designated as a Total Small Business set-aside with an estimated contract value between $500,000 and $1,000,000. Performance requirements mandate that work begin within 5 days and be completed within 45 days after notice to proceed. Contractors must provide a proposal guarantee covering 20% of the proposal price and performance and payment bonds covering 100% of the contract price within 14 days of award. The place of performance is located at 1000 Sawyer Circle in Morrisville, NC, with work hours restricted to Monday through Friday from 7am to 7pm. The project includes full-depth replacement of existing asphalt pavement, replacement of concrete curb and gutter, sidewalks, storm drain repairs, and new pavement markings. Wage rates will be determined according to the Davis-Bacon Act wage determination NC20240075, which establishes minimum wage rates for various construction trades in Wake County, North Carolina.
Notice text
8 versions
Update #8 · Latest ·
Amendment 0006 posted on 12 March 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0006" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0006 is as follows:
1) The close date of the proposal is changed from 14 March 2025 at 1700 CT to 21 March 2025 at 1700 CT.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0006 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Posted Questions and Answers 11 March 2025
______________________________________________________________________________________________________
Amendment 0005 posted on 24 February 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0005" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0005 is as follows:
1) The close date of the proposal is changed from 02/28/2025 at 1700 CT to 03/14/2025 at 1700 CT.
2) Removal of Uniform Bipartisan Infrastructure Law Report
3) Removal of clauses that are no longer applicable
4) Incorporate Presidential Executive Orders in Section H
5) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0005 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0004 posted on 31 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0004" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0004 is as follows:
1) The close date of the proposal is changed from 01/31/2025 at 1700 CT to 02/28/2025 at 1700 CT.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0004 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0003 posted on 15 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0003" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0003 is as follows:
1) The close date of the proposal is changed from 01/17/2025 to 01/31/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0003 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0002 posted on 26 December 2024
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0002" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0002 is as follows:
1) The close date of the proposal is changed from 12/27/2024 to 01/17/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
________________________________________________________________________________________________________
Amendment 0001 posted on 12/16/2024:
The purpose of Amendment 0001 is to do the following:
1. Change the delivery date on the front page of the RFQ to match Section L.
2. The close date of the proposal is 12/27/2024.
3. All other terms and conditions remain unchanged and in full force and effect.
________________________________________________________________________________________________________
Original Posting
The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC.
It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M.
Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.
This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled “Uniform Bipartisan Infrastructure Law (BIL) Data Report” are available in the attachments of this announcement.
All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals.
Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible.
Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Update #7 ·
Posted Questions and Answers 11 March 2025
______________________________________________________________________________________________________
Amendment 0005 posted on 24 February 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0005" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0005 is as follows:
1) The close date of the proposal is changed from 02/28/2025 at 1700 CT to 03/14/2025 at 1700 CT.
2) Removal of Uniform Bipartisan Infrastructure Law Report
3) Removal of clauses that are no longer applicable
4) Incorporate Presidential Executive Orders in Section H
5) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0004 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0004 posted on 31 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0004" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0004 is as follows:
1) The close date of the proposal is changed from 01/31/2025 at 1700 CT to 02/28/2025 at 1700 CT.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0004 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0003 posted on 15 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0003" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0003 is as follows:
1) The close date of the proposal is changed from 01/17/2025 to 01/31/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0003 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0002 posted on 26 December 2024
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0002" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0002 is as follows:
1) The close date of the proposal is changed from 12/27/2024 to 01/17/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
________________________________________________________________________________________________________
Amendment 0001 posted on 12/16/2024:
The purpose of Amendment 0001 is to do the following:
1. Change the delivery date on the front page of the RFQ to match Section L.
2. The close date of the proposal is 12/27/2024.
3. All other terms and conditions remain unchanged and in full force and effect.
________________________________________________________________________________________________________
Original Posting
The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC.
It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M.
Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.
This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled “Uniform Bipartisan Infrastructure Law (BIL) Data Report” are available in the attachments of this announcement.
All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals.
Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible.
Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Update #6 ·
Amendment 0005 posted on 24 February 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0005" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0005 is as follows:
1) The close date of the proposal is changed from 02/28/2025 at 1700 CT to 03/14/2025 at 1700 CT.
2) Removal of Uniform Bipartisan Infrastructure Law Report
3) Removal of clauses that are no longer applicable
4) Incorporate Presidential Executive Orders in Section H
5) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0004 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0004 posted on 31 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0004" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0004 is as follows:
1) The close date of the proposal is changed from 01/31/2025 at 1700 CT to 02/28/2025 at 1700 CT.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0004 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0003 posted on 15 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0003" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0003 is as follows:
1) The close date of the proposal is changed from 01/17/2025 to 01/31/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0003 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0002 posted on 26 December 2024
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0002" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0002 is as follows:
1) The close date of the proposal is changed from 12/27/2024 to 01/17/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
________________________________________________________________________________________________________
Amendment 0001 posted on 12/16/2024:
The purpose of Amendment 0001 is to do the following:
1. Change the delivery date on the front page of the RFQ to match Section L.
2. The close date of the proposal is 12/27/2024.
3. All other terms and conditions remain unchanged and in full force and effect.
________________________________________________________________________________________________________
Original Posting
The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC.
It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M.
Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.
This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled “Uniform Bipartisan Infrastructure Law (BIL) Data Report” are available in the attachments of this announcement.
All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals.
Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible.
Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Update #5 ·
Amendment 0004 posted on 31 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0004" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0004 is as follows:
1) The close date of the proposal is changed from 01/31/2025 at 1700 CT to 02/28/2025 at 1700 CT.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0004 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0003 posted on 15 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0003" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0003 is as follows:
1) The close date of the proposal is changed from 01/17/2025 to 01/31/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge Amendment 0003 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0002 posted on 26 December 2024
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0002" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0002 is as follows:
1) The close date of the proposal is changed from 12/27/2024 to 01/17/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
________________________________________________________________________________________________________
Amendment 0001 posted on 12/16/2024:
The purpose of Amendment 0001 is to do the following:
1. Change the delivery date on the front page of the RFQ to match Section L.
2. The close date of the proposal is 12/27/2024.
3. All other terms and conditions remain unchanged and in full force and effect.
________________________________________________________________________________________________________
Original Posting
The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC.
It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M.
Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.
This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled “Uniform Bipartisan Infrastructure Law (BIL) Data Report” are available in the attachments of this announcement.
All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals.
Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible.
Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Update #4 ·
Amendment 0003 posted on 15 January 2025
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0003" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0003 is as follows:
1) The close date of the proposal is changed from 01/17/2025 to 01/31/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
______________________________________________________________________________________________________
Amendment 0002 posted on 26 December 2024
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0002" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0002 is as follows:
1) The close date of the proposal is changed from 12/27/2024 to 01/17/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
________________________________________________________________________________________________________
Amendment 0001 posted on 12/16/2024:
The purpose of Amendment 0001 is to do the following:
1. Change the delivery date on the front page of the RFQ to match Section L.
2. The close date of the proposal is 12/27/2024.
3. All other terms and conditions remain unchanged and in full force and effect.
________________________________________________________________________________________________________
Original Posting
The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC.
It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M.
Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.
This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled “Uniform Bipartisan Infrastructure Law (BIL) Data Report” are available in the attachments of this announcement.
All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals.
Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible.
Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Update #3 ·
Amendment 0002 posted on 26 December 2024
See formal SF30 Amendment titled "6973GH-25-R-00053 Amendment 0002" in the attachments/links section. This amendment makes changes to the solicitation as detailed on page 1 of the amendment which states:
The purpose of Amendment 0002 is as follows:
1) The close date of the proposal is changed from 12/27/2024 to 01/17/2025.
2) All other terms and conditions remain unchanged and in full force and effect.
All offerors are required to acknowledge amendment 0002 on page 2 of the SIR or provide a signed copy of the amendment (SF30) with their bid submission. If this amendment is not acknowledged or signed, the bid will be considered non-responsive.
Note: The FAR references cited in SAM.gov are not applicable to the Federal Aviation Administration (FAA) as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).
________________________________________________________________________________________________________
Amendment 0001 posted on 12/16/2024:
The purpose of Amendment 0001 is to do the following:
1. Change the delivery date on the front page of the RFQ to match Section L.
2. The close date of the proposal is 12/27/2024.
3. All other terms and conditions remain unchanged and in full force and effect.
________________________________________________________________________________________________________
Original Posting
The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC.
It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M.
Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.
This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled “Uniform Bipartisan Infrastructure Law (BIL) Data Report” are available in the attachments of this announcement.
All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals.
Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible.
Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Update #2 ·
Amendment 0001 posted on 12/16/2024:
The purpose of Amendment 0001 is to do the following:
1. Change the delivery date on the front page of the RFQ to match Section L.
2. The close date of the proposal is 12/27/2024.
3. All other terms and conditions remain unchanged and in full force and effect.
________________________________________________________________________________________________________
Original Posting
The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC.
It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M.
Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.
This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled “Uniform Bipartisan Infrastructure Law (BIL) Data Report” are available in the attachments of this announcement.
All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals.
Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible.
Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Update #1 ·
The Federal Aviation Administration (FAA) has a requirement for the slide gate to be replaced at the Raleigh-Durham Tower Air Traffic Control Tower (RDU ATCT) in Raleigh, NC.
It is anticipated that a stand-alone contract with Firm Fixed-Price pricing arrangement will be awarded as a result of this solicitation. The NAICS code applicable to this requirement is 238990. The business size standard for this NAICS is $19M.
Contractors must be registered with the System for Award Management (SAM,) www.sam.gov on the date established for receipt of offers. Reference AMS Clause 3.3.1-33, paragraph (d), "if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror." The FAA reserves the right to review and verify each offerors program eligibility. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of proposals.
This project is intended to be funded by the Bipartisan Infrastructure Law (BIL). As such this project will be subject to associated FAA reporting requirements. If a contract is awarded, the contractor will be responsible for associated reporting requirements on a quarterly basis and prior to final payment per the associated contract clause AMS 3.18-1 Bipartisan Infrastructure Law – Reporting Requirements (October 2022) that will be included in any resulting solicitation and contract. A copy of this clause and report form titled “Uniform Bipartisan Infrastructure Law (BIL) Data Report” are available in the attachments of this announcement.
All questions regarding the project/specifications/plans must be received in writing (Samantha.A.Pearce@faa.gov) no later than 3:00 p.m. CT, 1 week prior to the closing date to allow for responses to be provided prior to due date for receipt of proposals.
Per 3.2.2.3-63 SITE VISIT (CONSTRUCTION)(JUL 2004), a site visit is scheduled for 10 December 2024 at 0900 EST at RDU ATCT (1000 Sawyer Circle Morrisville, NC 27560). Provide the name of attendees to the Contracting Officer four (4) days prior to Site Visit. Attendees are required to perform a self-wellness check prior to arriving and social distance while on-site when possible.
Any responses received after the time specified may not be considered in accordance with AMS Provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of Submittals, incorporated by reference in the solicitation. If all requested information is not furnished, the vendor's response may be determined ineligible.
Files
Show all 16
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| RDU ATCT Parking Lot and Drainage Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities