Raised Floor Repair/Replace

Closed Solicitation Posted

Solicitation number
FA462523Q1045
Agency
Global Strike Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
326199 All Other Plastics Product Manufacturing
PSC
7220 Floor Coverings
Place of performance
United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Contract Opportunity involves the repair and replacement of raised access flooring in Building 153 computer server rooms at Whiteman AFB, MO. The contractor is expected to provide all necessary supervision, personnel, equipment, tools, transportation, materials, supplies, off base storage and disposal for the project. The RFQ due date is 08 September 2023.

Products and Services to be provided:

  1. Supervision, personnel, equipment, and tools for the repair/replacement of the raised access flooring.
  2. Transportation, materials, supplies, off base storage and disposal services.
  3. Material to include but not limited to floor panel, stringers, pedestals, pedestal adhesive, edge strip, pedestal caps, and other supplementary materials.
  4. Removal of damaged flooring system and accessories and installation of new flooring panels, stringers, pedestals, pedestal caps, and accessories.
  5. Provision of dumpster and/or hauling service for material disposal.

Notice text

2 versions

Update #2 · Latest ·

Unless otherwise specified in this Statement of Work (SOW) the Contractor shall provide all supervision, personnel, equipment, tools, transportation, materials, supplies, off base storage and disposal as required to perform repair/replacement of the raised access flooring back to original conditions in Building 153 computer server rooms. The contractor shall provide material to include but not limited to floor panel, stringers, pedestals, pedestal adhesive, edge strip, pedestal caps, and other supplementary materials as needed and approved by the Government. The contractor will not be required to suspend or lift any equipment resting on the raised floors. All products shall be stored and installed per manufactures guidelines.  All work shall be in accordance with applicable federal, state, and local regulations, specifications, commercial practices, industry standards, and this SOW. At completion of the project, the Contractor shall remove all materials waste unless specified in writing by the Government. This introduction describes materials, work in general terms, and shall be used in conjunction with the entire SOW.  Work includes but is not limited to the following:  

  1. Perform overall visual inspection for the serviceability of the entire raised access flooring system located in computer server rooms (Rooms 115, 116, 170 and 171). 
  2. Removal of damaged flooring system and accessories where it is required. 
  3. Tiles, pedestals, and stringers that are damaged (cracked, rusted, or corridor, etc..) beyond repair need to be replaced and installed accordance with the products listed in this SOW and Manufacturer’s specifications. For those tiles that are in a serviceable condition with only the top of the tile become loose or disbanded (screwed down), will be re-laminated in accordance with Manufacturer’s specification.   Installation of new flooring panels, stringers, pedestals, pedestal caps, and accessories shall be in accordance with the products listed in this SOW and Manufacturer’s specifications. Room 115 has approximately 20 rusted/disbonded pedestals that require replacement/rebonded. Room 116 has approximately 100 rusted/disbonded pedestals that require replacement/rebonded and 25 rusted tiles that need replacement. Room 171 has approximately 25 rusted/disbonded pedestals that need require replacement/rebonded. 
  4. Re-laminate the floor panels where the laminated surfacing has separated from the floor panel.  Room 170 has approximately 7 tiles that require re-laminate. Room 171 has approximately 100 tiles that need re-laminate.
  5. The Contractor shall furnish to include but not limited to all: flooring materials, sealer, tools, equipment, supplies, accessories, etc. required removing, prepping, and installing all floor systems. 

Material Disposal.Contractor shall be responsible for providing dumpster and/or hauling service. The Government shall not furnish the Contractor with a dumpster. If a dumpster is used the Contractor shall inform the Government of the size of the dumpster needed for the job and will place the dumpster in the location as directed by the Government.     

A site visit will be held at Building 153 on Thursday, 8/31/23, at 1000hrs. Attendees must meet at the Whiteman AFB Visitors Center (Address: 101 Spirit Blvd Whiteman AFB, MO 65305) at 0950 for sign-in and sponsoring.  Attendees must be US Citizens; no cameras or other electronic devices will be allowed in the facility (anything with a battery, no Bluetooth, no Wi-Fi).  

Update #1 ·

Unless otherwise specified in this Statement of Work (SOW) the Contractor shall provide all supervision, personnel, equipment, tools, transportation, materials, supplies, off base storage and disposal as required to perform repair/replacement of the raised access flooring back to original conditions in Building 153 computer server rooms. The contractor shall provide material to include but not limited to floor panel, stringers, pedestals, pedestal adhesive, edge strip, pedestal caps, and other supplementary materials as needed and approved by the Government. The contractor will not be required to suspend or lift any equipment resting on the raised floors. All products shall be stored and installed per manufactures guidelines.  All work shall be in accordance with applicable federal, state, and local regulations, specifications, commercial practices, industry standards, and this SOW. At completion of the project, the Contractor shall remove all materials waste unless specified in writing by the Government. This introduction describes materials, work in general terms, and shall be used in conjunction with the entire SOW.  Work includes but is not limited to the following:  

  1. Perform overall visual inspection for the serviceability of the entire raised access flooring system located in computer server rooms (Rooms 115, 116, 170 and 171). 
  2. Removal of damaged flooring system and accessories where it is required. 
  3. Tiles, pedestals, and stringers that are damaged (cracked, rusted, or corridor, etc..) beyond repair need to be replaced and installed accordance with the products listed in this SOW and Manufacturer’s specifications. For those tiles that are in a serviceable condition with only the top of the tile become loose or disbanded (screwed down), will be re-laminated in accordance with Manufacturer’s specification.   Installation of new flooring panels, stringers, pedestals, pedestal caps, and accessories shall be in accordance with the products listed in this SOW and Manufacturer’s specifications. Room 115 has approximately 20 rusted/disbonded pedestals that require replacement/rebonded. Room 116 has approximately 100 rusted/disbonded pedestals that require replacement/rebonded and 25 rusted tiles that need replacement. Room 171 has approximately 25 rusted/disbonded pedestals that need require replacement/rebonded. 
  4. Re-laminate the floor panels where the laminated surfacing has separated from the floor panel.  Room 170 has approximately 7 tiles that require re-laminate. Room 171 has approximately 100 tiles that need re-laminate.
  5. The Contractor shall furnish to include but not limited to all: flooring materials, sealer, tools, equipment, supplies, accessories, etc. required removing, prepping, and installing all floor systems. 

Material Disposal.Contractor shall be responsible for providing dumpster and/or hauling service. The Government shall not furnish the Contractor with a dumpster. If a dumpster is used the Contractor shall inform the Government of the size of the dumpster needed for the job and will place the dumpster in the location as directed by the Government.     

A site visit is available upon request by the contractor.

Attachments

Files attached to this notice, newest first
File Type Posted
Attachment 1 Statement Of Work Feb 2023.pdf PDF
Attachment 3 Provisions and Clauses 22 Aug 2023.pdf PDF
Attachment 4 Synopsis Solicitation COMBO .pdf PDF
Attachment 2 Raised Floor Drawings.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity