Propulsion Subsystem Support Contract (PSSC 2. 0)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA8214-20-R-7000
- Agency
- Nuclear Weapons Center Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541330 Engineering Services
- PSC
- 1410 Guided Missiles
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to provide propulsion subsystem support services for the Minuteman III Intercontinental Ballistic Missile system. The Department of the Air Force Materiel Command Nuclear Weapons Center requires sustaining engineering, maintenance, hardware and software support, modification, development, procurement, replenishment, repair and refurbishment services. Proposers must demonstrate the ability to conduct materials analysis, testing and evaluation to identify aging mechanisms and ensure performance is maintained or improved. Proposals will be evaluated based on responsiveness, quality, and cost. Proposals are due by October 30, 2020.
No set-aside designation applies. The solicitation involves NAICS code 541715 and PSC code R699. The incumbent contractor is Northrop Grumman. The contract is an indefinite delivery/indefinite quantity agreement with a minimum order amount of $11.8 million and a period of performance from May 2021 through May 2039 at various continental United States locations supporting the Minuteman III system through its deactivation and disposal.
Notice text
2 versions
Update #2 · Latest ·
This contract is to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) Propulsion Subsystem to ensure that it remains operational and meets warfighter requirements for an estimated 18-year period or until completion of MMIII deactivation and disposal. The MMIII Propulsion Subsystem includes boosters, liquids, support equipment, ordnance, and both flight and ground batteries. The Propulsion Mission Statement is to integrate and coordinate all activities necessary to assess, report, and sustain the operational capability and reliability of the ICBM Propulsion Subsystem through deactivation and disposal.
The Propulsion Subsystem Support Contract (PSSC) shall assist the Government in maintaining the MMIII weapon system. Work shall be in areas including, but not limited to; sustaining engineering, maintenance engineering, modification of systems and equipment, hardware and software maintenance, developmental and production engineering, procurement, replenishment, repair, and refurbishment. The contractor shall be required to conduct materials and subcomponent analysis and test, including aging surveillance test and evaluation. The primary focus shall be to identify aging mechanism, anomalous behavior, and ensure any modifications or changes to the system which shall maintain and/or improve system-level performance.
Update 9/17/2020: The purpose of this solicitation amendment is to adjust the anticipated award date of this contract from Nov 2020 to May 2021 (see attached document FA821420R7000 Amend1). Any necessary pricing updates caused by this change should be submitted to the AF NLT 30 Oct 2020.
Update #1 ·
This contract is to support the Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) Propulsion Subsystem to ensure that it remains operational and meets warfighter requirements for an estimated 18-year period or until completion of MMIII deactivation and disposal. The MMIII Propulsion Subsystem includes boosters, liquids, support equipment, ordnance, and both flight and ground batteries. The Propulsion Mission Statement is to integrate and coordinate all activities necessary to assess, report, and sustain the operational capability and reliability of the ICBM Propulsion Subsystem through deactivation and disposal.
The Propulsion Subsystem Support Contract (PSSC) shall assist the Government in maintaining the MMIII weapon system. Work shall be in areas including, but not limited to; sustaining engineering, maintenance engineering, modification of systems and equipment, hardware and software maintenance, developmental and production engineering, procurement, replenishment, repair, and refurbishment. The contractor shall be required to conduct materials and subcomponent analysis and test, including aging surveillance test and evaluation. The primary focus shall be to identify aging mechanism, anomalous behavior, and ensure any modifications or changes to the system which shall maintain and/or improve system-level performance.
Attachments
| File | Type | Posted |
|---|---|---|
| FA821420R7000 Amend1.pdf | ||
| GRID TEMPLATE.docx | DOCX document | |
| Award-Fee Plan.pdf | ||
| Intro Letter.docx | DOCX document | |
| FA821420R7000.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Propulsion Subsystem Support Contract (PSSC 2. 0) | Limited / Sole Source Justification | |
| Propulsion Subsystem Support Contract (PSSC 2. 0) | Award Notice | |
| Propulsion Subsystem Support Contract (PSSC 2. 0) | Solicitation | |
| Propulsion Subsystem Support Contract (PSSC 2. 0) | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity