- Place of performance
- Parris Island, South Carolina, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic has issued a Special Notice requesting information from the public regarding the potential use of a Project Labor Agreement (PLA) for a construction project to build two Recruit Barracks at the Marine Corps Recruit Depot (MCRD) in Parris Island, South Carolina. The project is estimated to cost between $100 million and $250 million and take approximately 1,095 calendar days to complete.
The purpose of this Request for Information (RFI) is to solicit feedback on the use of a PLA for this large-scale federal construction project, as required by Executive Order 14063. NAVFAC is seeking comments from the public, including information on the availability of union and non-union labor, interest in participating in the project, and potential impacts of a PLA requirement. Responses to the attached questionnaire must be submitted by 2:00 P.M. EDT on November 21, 2024. This RFI is for planning purposes only and does not constitute a solicitation or obligation to award a contract. All information provided will be kept confidential and used solely for the intended purposes.
Notice text
This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.
Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. The construction project is for two (2) Recruit Barracks located at the Marine Corps Recruit Depot (MCRD) in Parris Island, SC.
This project will construct two (2) new recruit barracks in support of gender integrated recruit
training and integrate it into a campus setting consistent with the installation master plan. Provide adequate open squad bay billeting and Battalion/Company administrative space for recruits and permanent party personnel at Marine Corps Recruit Depot Parris Island.
Operations and Maintenance Support Information (OMSI) is included in this project.
Site preparation includes site earthwork and grading, pavement demolition and utility demolition. Special foundation features include pile foundations. Electrical utilities include primary and secondary distribution systems, outside lighting, charging stations and telecommunications infrastructure. Mechanical utilities include potable water supply system, fire water supply system, sanitary sewer with lift station, storm sewer system, and geothermal wells.
Environmental mitigation will include unexploded ordnance (UXO) construction oversight.
Facilities will be designed to meet or exceed the useful service life specified in DOD UFC.
Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency.
The project site is within an identified 100-year floodplain. Federal Emergency Management Agency is currently working to update mapping of the floodplain which will reduce the established base flood elevation. However, this facility will be constructed with a crawl space and elevated first floor in order to mitigate potential flooding.
Project will be Design-Bid-Build (DBB). NAICS Code: 236220. The magnitude of construction is anticipated to be $100,000,000 and $250,000,000. General period of performance is anticipated to be approximately 1,095 calendar days.
A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction project with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement.
In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.
This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.
Responses shall be submitted on the attached questionnaire via email to Scott Schulz at scott.c.schulz.civ@us.navy.mil no later than 2:00 P.M. EDT on 21 November 2024.
Files
| File | Type | Posted |
|---|---|---|
| PLA Request for Information P440 441.docx | DOCX document | |
| Attachment 1 PLA Questionnaire 440 441.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Design-bid-build, for the P440 & 441 recruit barracks, mcrd parris island, south carolina | Award Notice | |
| Design-bid-build, for the P440 & 441 recruit barracks, mcrd parris island, south carolina | Solicitation | |
| Pre-Solicitation Design-Bid-Build, for the P440 & 441 Recruit Barracks, Marine Corps Recruit Depot (MCRD) Parris Island, South Carolina | Pre-Solicitation | |
| This notice | Special Notice | |
| Sources sought notice for design-bid-build, for the P440 & 441 recruit barracks, mcrd parris island, south carolina | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity