Progreso Levee Improvements

Award Notice Posted

Solicitation number
IBM14B0001
Agency
Awarded
to Affolter Contracting Company, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
IBM14C0006 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Lower Rio Grande in Hidalgo and Cameron Counties, Texas, United States

Notice details come from SAM.gov. Updated .

Notice text

9 versions

Update #9 · Latest ·

This is an Award Notice. This requirement was awarded to EISG on 05/27/2014.

Update #8 ·

THIS IS AN AMENDMENT.

Please refer to the attached document, Amendment A005.

Update #7 ·

THIS IS AN AMENDMENT.

Please refer to the attached document, Amendment A004.

Update #6 ·

THIS IS AN AMENDMENT.

Please refer to the attached document, Amendment A003.

Update #5 ·

THIS IS AN AMENDMENT.

Please refer to the attached document, Amendment A002.

Update #4 ·

THIS IS AN AMENDMENT.

Please refer to the attached document, Amendment A001.

Update #3 ·

 THIS IS A SOLICITATION NOTICE.

The solicitation number is IBM14B0001 and is now available, at Federal Business Opportunities at www.fbo.gov. This acquisition is a 100% Small Business Set Aside.

ALL INTERESTED PARTIES MUST SUBMIT THEIR BID PACKAGE PRIOR TO THE CLOSING DATE OF THIS SOLICITATION ON FEBRUARY 14, 2014 by 14:00 MST, TO BE CONSIDERED FOR AWARD.

Update #2 ·

The work for this project generally consists of rehabilitation of approximately 6.0 miles of river levee in southern Texas in order to meet the Federal Emergency Management Agency's (FEMA) Levee Certification Requirements of National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). This project consists of two segments of river levee separated by a floodwall situated mostly in Hidalgo County, Texas and extending approximately 43 feet into Cameron County, Texas. The first segment is 2.0 miles in length and begins 3.8 miles downstream of the historic Donna Pump. The second segment is 4.0 miles in length and ends at approximately the Hidalgo-Cameron County Line. Major Construction Tasks -(1) Preparation of right of way (clearing and grubbing) (2) Improvement of existing top of levee (3) Construction of Flex Base (4) Construction of ramps (5) Construction of toe drain (6) Re-seeding and establishment of vegetation for erosion control on the side slopes of the levee (6) Replacement of sluice gate assemblies inside existing and new gatewell structures, and (7) Cleaning and removing debris from openings of culverts, and inlet and outlet structures of the existing gatewell systems.

The magnitude of this project is between $5 million and $10 million.

Performance Period - All work shall be completed within four hundred eighty-five (485) calendar days. All flood control levee and structure work, excluding maintenance of seeding, shall be completed within, three hundred sixty-five (365) calendar days. All maintenance of seeding shall be completed within one-hundred twenty (120) calendar days of completion of all other levee work.

This requirement will be a Total Small Business Set Aside pursuant to FAR 52.219-6.

The solicitation, plans, and specifications are expected to be posted on or about January 15, 2014 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by January 15, 2014 that is because the solicitation is not available for posting).

This is a Presolicitation Notice. The solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a bid to be considered by the Agency.

This is NOT a request for bid. Please do not submit a bid in response to this Presolicitation Notice.

Update #1 ·

The work for this project generally consists of rehabilitation of approximately 6.0 miles of river levee in southern Texas in order to meet the Federal Emergency Management Agency's (FEMA) Levee Certification Requirements of National Flood Insurance Program (NFIP) regulations (44 CFR 65.10). This project consists of two segments of river levee separated by a floodwall situated mostly in Hidalgo County, Texas and extending approximately 43 feet into Cameron County, Texas. The first segment is 2.0 miles in length and begins 3.8 miles downstream of the historic Donna Pump. The second segment is 4.0 miles in length and ends at approximately the Hidalgo-Cameron County Line. Major Construction Tasks -(1) Preparation of right of way (clearing and grubbing) (2) Improvement of existing top of levee (3) Construction of Flex Base (4) Construction of ramps (5) Construction of toe drain (6) Re-seeding and establishment of vegetation for erosion control on the side slopes of the levee (6) Replacement of sluice gate assemblies inside existing and new gatewell structures, and (7) Cleaning and removing debris from openings of culverts, and inlet and outlet structures of the existing gatewell systems.

The magnitude of this project is between $5 million and $7 million.

Performance Period - All work shall be completed within four hundred eighty-five (485) calendar days. All flood control levee and structure work, excluding maintenance of seeding, shall be completed within, three hundred sixty-five (365) calendar days. All maintenance of seeding shall be completed within one-hundred twenty (120) calendar days of completion of all other levee work.

This requirement will be a Total Small Business Set Aside pursuant to FAR 52.219-6.

The solicitation, plans, and specifications are expected to be posted on or about January 15, 2014 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by January 15, 2014 that is because the solicitation is not available for posting).

This is a Presolicitation Notice. The solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a bid to be considered by the Agency.

This is NOT a request for bid. Please do not submit a bid in response to this Presolicitation Notice.

Files

File Type Posted
Amendment_A005.pdf PDF
01-_Technical_Specifications_02-12-2014.pdf PDF
19-_Drawings_(Revisions).pdf PDF
Amendment_A004.pdf PDF
Amendment_A003 _Attachment_1_Q A.doc DOC document
Amendment_A003.pdf PDF
18-_Design_Report.pdf PDF
Amendment_A002.pdf PDF
Amendment_A001.pdf PDF
05-_Wage_Determination.pdf PDF
12-_SF_25B.pdf PDF
14-_SF_1413.pdf PDF
06-_IBWC_FORM_117.pdf PDF
IBM14B0001_FINAL_01_10_2014.pdf PDF
09-_SF_24.pdf PDF
04-_Geotechnical_Exploration_and_Engineering_Evaluation.pdf PDF
13-_SF_28.pdf PDF
16-_SF_1415.pdf PDF
15-_SF_1414.pdf PDF
07-_IBWC_FORM_110.pdf PDF
11-_SF_25A.pdf PDF
03-_Geotechnical_Addendum _Subreach_I.pdf PDF
02-_Drawings.pdf PDF
10-_SF_25.pdf PDF
01-_Technical_Specifications.pdf PDF
08-_IBWC_FORM_116.pdf PDF
Show all 26

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors