Amendment_A003.pdf
PDF 12 KB Posted
- Attached to
- Progreso Levee Improvements
- Solicitation number
- IBM14B0001
About this file
Amendment A003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 01-_Technical_Specifications_02-12-2014.pdf | ||
| 19-_Drawings_(Revisions).pdf | ||
| Amendment_A005.pdf | ||
| Amendment_A004.pdf | ||
| 18-_Design_Report.pdf | ||
| Amendment_A003 _Attachment_1_Q A.doc | DOC document | |
| Amendment_A002.pdf | ||
| Amendment_A001.pdf | ||
| 14-_SF_1413.pdf | ||
| 02-_Drawings.pdf | ||
| 10-_SF_25.pdf | ||
| 06-_IBWC_FORM_117.pdf | ||
| 01-_Technical_Specifications.pdf | ||
| IBM14B0001_FINAL_01_10_2014.pdf | ||
| 09-_SF_24.pdf | ||
| 05-_Wage_Determination.pdf | ||
| 04-_Geotechnical_Exploration_and_Engineering_Evaluation.pdf | ||
| 08-_IBWC_FORM_116.pdf | ||
| 12-_SF_25B.pdf | ||
| 15-_SF_1414.pdf | ||
| 07-_IBWC_FORM_110.pdf | ||
| 11-_SF_25A.pdf | ||
| 03-_Geotechnical_Addendum _Subreach_I.pdf | ||
| 13-_SF_28.pdf | ||
| 16-_SF_1415.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE RATING
2. AMENDMENT/MODIFICATION NO.
A003
3. EFFECTIVE DATE
02/04/2014
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
IBWC_CODE
International Boundary and Water Commission
(IBWC)
USIBWC - ACQUISITIONS DIV
4171 NORTH MESA, STE. C100
EL PASO, TX 79902-1441
Laura A. Baker
NAME
TEL.
laura.baker@ibwc.gov
6. ISSUED BY IBWC_CODE
International Boundary and Water Commission (IBWC)
USIBWC - ACQUISITIONS DIV
4171 NORTH MESA, STE. C100
EL PASO, TX 79902-1441
7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NO.
IBM14B0001
CONTACT DUNS
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
01/10/2014
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.__1__X
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to:
a. Provide the written questions received and the Government's answers to those questions. Reference Attachment 1 of this Amendment.
b. Modify SF 1442, Block 10, P. 1 of this Solicitation to correct the spelling of "Progreso".
c. Modify Section B, P. 7 of this Solicitation to change the "Unit" from "EA" to "LS".
d. Modify Section H, Clause H.11, P. 18 through P. 19 of this Solicitation to revise the text of the clause.
e. Add Clause 52.227-17 Rights in Data - Special Works (DEC 2007) to this Solicitation under Section I.
f. Add Attachment 18, Design Report to the Solicitation under Section J - Identifier 18 of this Solicitation.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Laura A. Baker
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
02/04/2014
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
IBM14B0001
Table of Contents
Section Description Page Number
B Supplies or Services and Prices/Costs H Special Contract Requirements
H.11 Contract Work Schedule -- IBWC (Dec 2013) I Contract Clauses
52.227-17 Rights in Data - Special Works (Dec 2007) J List of Attachments
001 1.00 0.00
1.00 LS
The Contractor shall furnish all labor, material, and equipment necessary to complete the construction of the rehabilitation of the Progresso Levee within the Lower Rio Grande in Hidalgo and Cameron, Counties, TX in accordance with provided plans and specifications.
Doc Ref No: 4309S4201017 Delivery Date FOB:
IBM14B0001
Line Item Summary
Solicitation Number:
IBM14B0001
Contract Number: Title: Progreso Levee Improvements Date of Solicitation:
02/04/2014
Line Item No. Description Quantity Unit Unit Price Total Cost
Section H- Special Contract Requirements
H.11 Contract Work Schedule -- IBWC (Dec 2013)
Normal working hours for the Contractor shall be between the hours of 7:00 AM and 6:00 PM, Monday through Friday, excluding Federal Holidays. The Contractor shall not exceed 40 hours per week for normal working hours. If the Contractor wishes to work during periods other than that above or in excess of 40 hours per week, additional Government inspection forces will be required. The Contractor shall notify in writing the Contracting Officer (CO) and the Contracting Officer’s Representative (COR) 5 business days in advance of the desire to work during other periods to allow assignment of additional Government inspection forces when the CO de-termines that the additional Government inspection forces are reasonably available. If such forces are reason-ably available, the CO may authorize the Contractor to perform work during periods other than those noted as normal duty hours/days or in excess of 40 normal duty hours per week; however, if Government inspector forces are required to perform in excess of their normal 40 hours per week, the actual cost of the overtime in-ceptions at overtime rates will be charged to the Contractor and will be deducted from the “Final” payment of the contract amount. The estimated Government Inspector overtime rate is $108.00.
2014 Holiday Schedule
DATE HOLIDAY
Wednesday, January 1 New Year’s Day Monday, January 20 Birthday of Martin Luther King, Jr.
Monday, February 17 * Washington’s Birthday Monday, May 26 Memorial Day Friday, July 4 Independence Day Monday, September 1 Labor Day Monday, October 13 Columbus Day Tuesday, November 11 Veterans Day Thursday, November 27 Thanksgiving Day Thursday, December 25 Christmas Day
*This holiday is designated as "Washington’s Birthday" in section 6103(a) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Though other institutions such as state and local governments and private businesses may use other names, it is our policy to always refer to holidays by the names designated in the law.
2015 Holiday Schedule
DATE HOLIDAY
Thursday, January 1 New Year’s Day Monday, January 19 Birthday of Martin Luther King, Jr.
Monday, February 16* Washington’s Birthday Monday, May 25 Memorial Day Friday, July 3** Independence Day Monday, September 7 Labor Day Monday, October 12 Columbus Day Wednesday, November 11 Veterans Day Thursday, November 26 Thanksgiving Day Friday, December 25 Christmas Day
*This holiday is designated as "Washington’s Birthday" in section 6103(a) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Though other institutions such as state and local governments and private businesses may use other names, it is our policy to always refer to holidays by the names designated in the law.
** July 4, 2015 (the legal public holiday for Independence Day), falls on a Saturday. For most Federal employ-ees, Friday, July 3, will be treated as a holiday for pay and leave purposes. (See 5 U.S.C. 6103(b).)
2016 Holiday Schedule
DATE HOLIDAY
Friday, January 1 New Year’s Day Monday, January 18 Birthday of Martin Luther King, Jr.
Monday, February 15* Washington’s Birthday Monday, May 30 Memorial Day Monday, July 4 Independence Day Monday, September 5 Labor Day Monday, October 10 Columbus Day Friday, November 11 Veterans Day Thursday, November 24 Thanksgiving Day Monday, December 26** Christmas Day
*This holiday is designated as "Washington’s Birthday" in section 6103(a) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Though other institutions such as state and local governments and private businesses may use other names, it is our policy to always refer to holidays by the names designated in the law.
** December 25, 2016 (the legal public holiday for Christmas Day), falls on a Sunday. For most Federal em-ployees, Monday, December 26, will be treated as a holiday for pay and leave purposes. (See section 3(a) of Ex-ecutive order 11582, February 11, 1971.)
Section I- Contract Clauses
Clause Title
52.227-17 Rights in Data - Special Works (Dec 2007)
Section J- List of Attachments Identifier Title Date Number of
Pages 18 J.18 Design Report - ADDED 02/04/2014 262