Amendment_A003 _Attachment_1_Q A.doc

DOC document 44 KB Posted

Attached to
Progreso Levee Improvements
Solicitation number
IBM14B0001
Issued by

About this file

Amendment A003 Attachment 1

View the file

Other files

File Type Posted
01-_Technical_Specifications_02-12-2014.pdf PDF
19-_Drawings_(Revisions).pdf PDF
Amendment_A005.pdf PDF
Amendment_A004.pdf PDF
18-_Design_Report.pdf PDF
Amendment_A003.pdf PDF
Amendment_A002.pdf PDF
Amendment_A001.pdf PDF
14-_SF_1413.pdf PDF
02-_Drawings.pdf PDF
10-_SF_25.pdf PDF
06-_IBWC_FORM_117.pdf PDF
01-_Technical_Specifications.pdf PDF
IBM14B0001_FINAL_01_10_2014.pdf PDF
09-_SF_24.pdf PDF
05-_Wage_Determination.pdf PDF
04-_Geotechnical_Exploration_and_Engineering_Evaluation.pdf PDF
08-_IBWC_FORM_116.pdf PDF
12-_SF_25B.pdf PDF
15-_SF_1414.pdf PDF
07-_IBWC_FORM_110.pdf PDF
11-_SF_25A.pdf PDF
03-_Geotechnical_Addendum _Subreach_I.pdf PDF
13-_SF_28.pdf PDF
16-_SF_1415.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment A003

Attachment 1

Q#
Page #
Section
Para #
QUESTION
Answer
1
00.31.43-1

Sheet 2

Part 1 Section 1.2

“GENERAL NOTES”

B, D

Note 25

Which Paragraph/Note “B”, “D” or Note 25 take precedence for permitting and state licensing requirements on real estate owned or controlled by USIBWC?

Note 25 refers to the Contractor’s License. There is no conflict between Specification 01.31.43 and Note 25. Paragraph 1.2B refers specifically to local building codes and building permits, whereas, Paragraph 1.2D refers to all permits that may be required by Federal, state, and local entities, unless otherwise specified in the Contract Provisions and technical specifications. There is no conflict between Specification 00.31.43 1.2B and 1.2D.

2
PGS 14 of 202 through 41 of 202
Construction Drawings

Plan and profile

Can the USBIWC provide existing topographical information without proposed elevation overlays for purpose of estimating quantities?
No.
3
01.71.00

01.46.00-4

01.39.00-5 Part 1 Section 1.3

Part 1 Section 1.7

Part 1 Section 1.6 A

A-C

A Due to the cost impact of this requirement can the government please confirm its intent to follow this specification in its entirety of contractor providing a full time P.E. onsite for the duration of contract?

Can the government please confirm its intent of the CQC manager and staff being full time onsite for the project duration as well?

If so can the CQC manager and the Field engineer fulfill dual roles?

Will the government allow any dual roles of site Superintendent and SSHO?

The intent of the Government 01.71.00 is to obtain a Field Engineer that is qualified per Specification 01.71.00 Paragraph 1.3 and satisfactorily performs the tasks as outlined in Specification 01.71.00 Paragraph 1.4. The duration on site is dependent on the accomplishment of these tasks.

The CQC Manager shall be full time onsite at all times when work is in progress and shall have not other responsibilities. (01.46.001 1.7A.

Other positions can be combined as the Contractor sees fit.

Will concrete riprap would be allowed for Progreso Levee Improvements?
No. Specification 35.42.00 calls for durable natural stone riprap with specific requirements. Crushed concrete riprap does not meet this specification and will not be allowed on the project.
5
PG 1
SF 1442 of IBM14B0001
Solicitation IBM14B0001 is for a 6 mile reach with a projected magnitude of between $5 million and $10 million, is the projected performance period of four hundred eighty-five (485) calendar days, as stated within the synopsis, a correct time period for this effort? If it is not, will you be revising the current synopsis, issued Dec. 24, 2013 with a change on Jan 6, 2014 to reflect a revised performance period.
Timeframe was corrected with Amendment A001. See Amendment A001.

Questions and Answers for Solicitation IBM14B0001

File details come from the government source that posted it. Updated .