PRESOLICITATION NOTE - Design-Bid-Build (Dbb), Dry Dock 2, Portal Crane Rail And Tunnel Repairs located at Portsmouth Naval Shipyard in Kittery, ME.

Closed Solicitation Posted

This opportunity was awarded. See its 2 award notices in the notice history.

Solicitation number
N4008520R0069
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Kittery Me Usa

Notice details come from SAM.gov. Updated .

Notice text

SOLICITATION N40085-20-R-0069, DESIGN-BID-BUILD (DBB), DRY DOCK 2, PORTAL CRANE RAIL AND TUNNEL REPAIRS, PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE.

This acquisition will result in the award of a Firm-Fixed Price (FFP) contract for Design-Bid-Build (DBB) Construction Services.          

 These projects provide various infrastructure upgrades to the dry dock #2 area at Portsmouth Naval Shipyard (PNS) to increase the function and reliability of the ground level portal crane rails and adjacent facilities. The proposed upgrades are divided into two separate projects that will be awarded together: Dry Dock 2 Portal Crane Rail Repairs, and Dry Dock 2 Tunnel Repairs.

The Dry Dock #2 Portal Crane Rail Repair upgrades will increase the capacity of the ground level portal crane rails at the North and East sides of Dry Dock #2. Major work elements include: demolition of existing crane rails, baseplates, hardware, footings, beams, and pile caps; installation of micro piles; installation of reinforced concrete pile caps, beams, and footings; installation of crane rail, baseplates, and hardware; site grading, drainage improvements, and pavement restoration within the project limits.

The Dry Dock #2 Tunnel Repair upgrades will demolish and reconstruct the personnel access tunnel at the east side of Dry Dock 2, including integral and adjacent ground level portal crane rails and footings. Major work elements include; temporary re-routing of electrical, communication, and mechanical utilities; selective demolition of reinforced concrete personnel access tunnel, and crane rail footings; rock excavation; installation of new cast-in-place reinforced concrete personnel access tunnel with integral crane rails and adjacent crane rail footings; reconstruction of drainage, electrical, and mechanical utilities; site grading and paving.

 RFP and ALL ATTACHMENTS  INCLUDED IN THIS NOTICE (Drawings, specs, solicitation and all attachments, reference drawings files 1-13)  

Files

File Type Posted
8.2010-RFI #247 Backfill Clarifications for UG Steam and Condensate.pdf PDF
Spec Appendix C Utility Investigation Report.pdf PDF
Attachment C - Construction Experience Data Sheet.docx DOCX document
1. 1975-Additional Crane Rail System Construction Drydock No. 1 & Berths 6 & 7.pdf PDF
2.1975-Additional Crane Rail System Construction DryDock No. 3.pdf PDF
Attachment G - Small Business Subcontracting Plan Template.doc DOC document
3.1979-Entrance For DD2 Borings.pdf PDF
5.1990 - Drydock No. 2 Modernization.pdf PDF
Attachment F - One Day Pass Request.xls XLS spreadsheet
Attachment B _SECNAV_5512 (KITTERY).pdf PDF
Attachment A PPII log.doc DOC document
FINAL DD2 CR Specs.pdf PDF
7.2009-DD2 Caisson and Sill Drawings.pdf PDF
9.2014-Structural Repairs to Berths 6A, 6B and 6C.pdf PDF
Attachment E - Price Proposal Form.pdf PDF
10.1903 - Details of Tracks Around DD2.pdf PDF
Tunnel Drawings_signed.pdf PDF
Final RFP.pdf PDF
Spec Appendix A Geotechnical Data Report.pdf PDF
6.1987-Stiffleg Derrick Crane For DD2.pdf PDF
FINAL DD2 Tunnel Spec.pdf PDF
13.1975-Eval. of Fnds at Berths 6,7 & DD2.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
11.1968-Replacement of Crane Rails East Side of Dry Dock 2.pdf PDF
12.1972-Drydock 2 Crane Rails & RR Trackwork Details.pdf PDF
4.1982-Replace Trackage-DD2 East Side and Berths 6 & 7.pdf PDF
CR Drawings_signed.pdf PDF
Show all 27

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors