PORTABLE OFFICE SPACE w/POWER GENERATION SUPPORT SYSTEM (GUAM)
Closed Solicitation Posted
- Solicitation number
- FA524025QM104
- Agency
- Pacific Air Forces Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 531120 Lessors of Nonresidential Buildings (except Miniwarehouses)
- PSC
- 5410 Prefabricated And Portable Buildings
- Place of performance
- Yigo Guam 96929, United States
- Points of contact
-
- Emily Gumataotao emily.gumataotao.1@us.af.mil (671) 366-6603
- Lee Michael D. Rosario lee_michael.rosario@us.af.mil (671) 366-4257
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Pacific Air Forces is seeking a small business contractor to provide portable office space and power generation support systems at Andersen Air Force Base in Guam. The solicitation (FA524025QM104) requires eight double-wide trailers (16'x45') and one single-wide trailer (8'x20'), along with security fencing and power generation capabilities to support a temporary passenger processing terminal. The requirement includes robust infrastructure to support 18 workstations, network cabling, emergency lighting, and equipment capable of withstanding winds up to 150 mph. The government will use a lowest price technically acceptable (LPТА) evaluation method, reviewing quotes starting with the lowest-priced offer until at least two acceptable proposals are identified. Critical deadlines include vendor questions due by January 16, 2025, and quote submissions due by January 23, 2025, at 0900 Chamorro Standard Time.
The solicitation is a 100% small business set-aside under NAICS code 531120 with a $34.0M size standard, targeting lessors of nonresidential buildings. The contract has a base performance period of 6 months (February 1 - July 31, 2025) with two potential 3-month option periods that could extend services through January 31, 2026. Delivery is required by January 31, 2025, to Building 19020 at Andersen Air Force Base in Yigo, Guam. The contractor must provide 24/7 emergency service with a 2-hour response time for power generation issues and must be prepared to remove equipment within 48 hours if evacuation is ordered. Specific requirements include electrical infrastructure to support workstations and office equipment, CAT5/CAT6 network cabling, security fencing with four double swing gates, and the ability to withstand extreme weather conditions typical of the Pacific region.
Notice text
See attachment for details.
Attachments
| File | Type | Posted |
|---|---|---|
| FA524025QM104 - Combined Synopsis-Solicitation_A002.pdf | ||
| Attachment 4 - Vendor RFI Questions and Answers - 21Jan25-25QM104.pdf | ||
| FA524025QM104 - Combined Synopsis-Solicitation_A001.pdf | ||
| Attachment 3 - Vendor RFI Questions and Answers - 16Jan25-25QM104.pdf | ||
| Attachment 1_SOW FA524025QM104.pdf | ||
| FA524025QM104 - Combined Synopsis-Solicitation.pdf | ||
| Attachment 2_CLS FA524025QM104.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity