Port everglades harbor, maintenance dredging, 42-foot project, broward county, florida

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
GROUP1-18-R-J002
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Fl Usa

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Revision 0002, dated 9/7/2020, has been posted.

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP18R0029, GROUP 1 - UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation
(W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029); Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034); The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging
(W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED DREDGING MATOC POOL.

The project work consists of maintenance dredging of shoal material from the Federal navigation channel and Port Everglades berthing areas and will be divided into a Base (Federal) and Option A (non-Federal). The Federal project consists of the Entrance Channel, 2 Turning Basins, Southport Access Channel, and Turning Notch. The non-Federal project consists of the Port Berths. The project will entail the dredging of the Outer Entrance Channel (OEC) to the required depth of 45 feet; the Inner Entrance Channel (IEC), Main Turning Basin (MTB), Southport Access Channel (SAC), and Turning Notch (TN) to the required depth of 42 feet; North Turning Basin (NTB) and Port Berths 1, 2, & 3 to the required depth of 31 feet; and Port Berths 7, 8, 9, 10 (Slip 1), 4, 5 (Slip 2), 12, 13, 14, 15 (Slip 3), 16, 26, 27 & 30 to the required depth of 42 feet. All dredging areas will incorporate 2 feet of allowable overdepth. All dredged material from the project will be disposed of in the Port Everglades Ocean Dredge Material Disposal Site (ODMDS) located approximately 2.5 nautical miles from the eastern end of the Entrance Channel except for the material dredged from the Entrance Channel up to Station 74+50 which will be placed in the Beach Disposal Area (D/A-B). Additional work includes, but is not limited to, construction vibration monitoring, beach tilling, endangered species monitoring, turbidity monitoring, and maintenance of traffic.

Please Note: Pre-Proposal Conference date has been changed from August 26, 2020 at 10:00 to 11:00 AM Local Time to August 31, 2020 at 10:00 to 11:00 AM Local Time.

Update #2 ·

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP18R0029, GROUP 1 - UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation
(W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029); Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034); The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging
(W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED DREDGING MATOC POOL.

The project work consists of maintenance dredging of shoal material from the Federal navigation channel and Port Everglades berthing areas and will be divided into a Base (Federal) and Option A (non-Federal). The Federal project consists of the Entrance Channel, 2 Turning Basins, Southport Access Channel, and Turning Notch. The non-Federal project consists of the Port Berths. The project will entail the dredging of the Outer Entrance Channel (OEC) to the required depth of 45 feet; the Inner Entrance Channel (IEC), Main Turning Basin (MTB), Southport Access Channel (SAC), and Turning Notch (TN) to the required depth of 42 feet; North Turning Basin (NTB) and Port Berths 1, 2, & 3 to the required depth of 31 feet; and Port Berths 7, 8, 9, 10 (Slip 1), 4, 5 (Slip 2), 12, 13, 14, 15 (Slip 3), 16, 26, 27 & 30 to the required depth of 42 feet. All dredging areas will incorporate 2 feet of allowable overdepth. All dredged material from the project will be disposed of in the Port Everglades Ocean Dredge Material Disposal Site (ODMDS) located approximately 2.5 nautical miles from the eastern end of the Entrance Channel except for the material dredged from the Entrance Channel up to Station 74+50 which will be placed in the Beach Disposal Area (D/A-B). Additional work includes, but is not limited to, construction vibration monitoring, beach tilling, endangered species monitoring, turbidity monitoring, and maintenance of traffic.

Please Note: Pre-Proposal Conference date has been changed from August 26, 2020 at 10:00 to 11:00 AM Local Time to August 31, 2020 at 10:00 to 11:00 AM Local Time.

Update #1 ·

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP18R0029, GROUP 1 - UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation
(W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029); Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034); The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging
(W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED DREDGING MATOC POOL.

The project work consists of maintenance dredging of shoal material from the Federal navigation channel and Port Everglades berthing areas and will be divided into a Base (Federal) and Option A (non-Federal). The Federal project consists of the Entrance Channel, 2 Turning Basins, Southport Access Channel, and Turning Notch. The non-Federal project consists of the Port Berths. The project will entail the dredging of the Outer Entrance Channel (OEC) to the required depth of 45 feet; the Inner Entrance Channel (IEC), Main Turning Basin (MTB), Southport Access Channel (SAC), and Turning Notch (TN) to the required depth of 42 feet; North Turning Basin (NTB) and Port Berths 1, 2, & 3 to the required depth of 31 feet; and Port Berths 7, 8, 9, 10 (Slip 1), 4, 5 (Slip 2), 12, 13, 14, 15 (Slip 3), 16, 26, 27 & 30 to the required depth of 42 feet. All dredging areas will incorporate 2 feet of allowable overdepth. All dredged material from the project will be disposed of in the Port Everglades Ocean Dredge Material Disposal Site (ODMDS) located approximately 2.5 nautical miles from the eastern end of the Entrance Channel except for the material dredged from the Entrance Channel up to Station 74+50 which will be placed in the Beach Disposal Area (D/A-B). Additional work includes, but is not limited to, construction vibration monitoring, beach tilling, endangered species monitoring, turbidity monitoring, and maintenance of traffic.

Files

Notice history

Notice Type Posted
Port everglades harbor, maintenance dredging, 42-foot project, broward county, florida Award Award Notice
This notice Latest solicitation Solicitation
Port everglades harbor, maintenance dredging, 42-foot project, broward county, florida Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors