GROUP1-18-R-J002
Jacksonville District
Port Everglades Harbor, Maintenance Dredging, 42-Foot Project
Broward County, Florida
Construction Solicitation and Specifications Task Order
14 AUG 2020
Port Everglades Harbor, Maintenance Dredging GROUP1-18-R-J002 42-Foot Project, Broward County, Florida
DESIGN AUTHENTICATION
This project was designed by the Jacksonville District, U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.
WILLIAM L. REILLY, P.E.
HIEF, WATERWAYS SECTION
DESIGN BRANCH, ENGINEERING DIVISION
DENNIS J. ZEVENEY, P.E.
CHIEF, GEO BRANCH
ENGINEERING DIVISION
DAVID DUDLEY, P.E.
CHIEF, DESIGN BRANCH
ENGINEERING DIVISION
LAUREEN A. BOROCHANER, P.E.
CHIEF, ENGINEERING DIVISION
ZEVENEY.DENNIS.J.
1249349085
Digitally signed by
ZEVENEY.DENNIS.J.1249349085
Date: 2020.07.16 13:47:04 -04'00'
WIGNER.WILLIAM.
KEITH.1230084617
Digitally signed by
WIGNER.WILLIAM.KEITH.1230084
Date: 2020.07.16 14:32:31 -04'00'
REILLY.WILLIAM.L
UKE.1527897994
Digitally signed by
REILLY.WILLIAM.LUKE.15278979
Date: 2020.07.16 16:16:08 -04'00'
DUDLEY.DAVID.F.1
399388569
Digitally signed by
DUDLEY.DAVID.F.1399388569
Date: 2020.07.16 16:25:52 -04'00'
GROUP1-18-R-J002 SF1442-A1
ADDENDUM TO THE STANDARD FORM 1442
PORT EVERGLADES HARBOR,
MAINTENANCE DREDGING 42-FOOT PROJECT,
BROWARD COUNTY, FLORIDA
NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO
THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER
SOLICITATION NUMBER W912EP18R0029, GROUP 1 - UNRESTRICTED:
Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029); Manson Construction Co.
(W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc.
(W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034); The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).
PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE
PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED
DREDGING MATOC POOL.
EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors. The factors for evaluation will be as follows:
FACTOR 1 - Availability of technically acceptable dredge(s).
FACTOR 2 - Past performance.
FACTOR 3 – Price.
Note: Coast Guard Certified Equipment is REQUIRED.
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
FACTOR 1 - Availability of technically acceptable dredge(s).
The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).
GROUP1-18-R-J002 SF1442-A2
Evaluation Method:
The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.
To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and available to meet the required period of performance.
FACTOR 2 - Past performance.
NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.
Evaluation Method:
Past Performance was evaluated for all contractors under the Dredging MATOC. An "Acceptable" rating was earned under Past Performance for all offeros that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No. W912EP18R0029). Therefore, for this task order all offeros will receive the Past Performance rating of "Acceptable".
Note: The Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance, and Safety/Security will be reviewed from the aforementioned additional sources to determine the offeror “Acceptable” or “Unacceptable.
FACTOR 3 – Price.
The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.
GROUP1-18-R-J002 SF1442-A3
Offerors are required to submit the following:
(1) Completed Bid Schedule (see Section 00010A).
(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.
(3) Completed “Addendum to the Standard Form 1442 with the latest revision”.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS
TASK ORDER:
Block 7. ISSUED BY:
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
Block 9 -- For additional information contact:
A. NAME: Timothy Humphrey
EMAIL ADDRESS: Timothy.G.Humphrey@usace.army.mil
B. TELEPHONE NO.: 904-232-1072
Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK
DESCRIBED IN THESE DOCUMENTS:
DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.
MAGNITUDE OF CONSTRUCTION: Between $5,000,000 and $10,000,000.
THIS SOLICITATION IS FOR GROUP 1 - UNRESTRICTED
YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM
THIS NOTICE OF INTENT. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.
THE NAICS CODE FOR THIS NOTICE OF INTENT IS 237990 AND THE SMALL
BUSINESS SIZE STANDARD IS $27.5 MILLION.
mailto:Timothy.G.Humphrey@usace.army.mil http://www.sam.gov/
GROUP1-18-R-J002 SF1442-A4
Block 11 -- The Contractor shall begin performance within 60 calendar days and complete work NLT 140 calendar days after receipt of NTP, including 125 calendar days for the Base and 15 calendar days for Option A. (See FAR Clause 52.211-10 in Section 00700).
Block 12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE
AND PAYMENT BONDS: YES
Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER AWARD.
Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:
A. Offers to perform the work required are due electronically at the following email address by 2:00 PM, local time on 14 September 2020: timothy.g.humphrey@usace.army.mil and a carbon copy (cc) shall be sent to tedra.n.thompson@usace.army.mil and griselle.gonzalez@usace.army.mil.
B. An offer guarantee is required. An electronic copy of the bid guarantee shall be submitted with the offer while the Original must be received within two calendar days of the proposal response date.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.
GROUP1-18-R-J002 SF1442-A5
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19, and 20A-20D below:
Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)
DUNS: CAGE:
Block 15. TELEPHONE NO. (Include areacode):
Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)
Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D).
Block 18. The offeror agrees to furnish any required performance and payment bonds.
Block 19. ACKNOWLEDGMENT OF REVISIONS (The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)
REVISION
NO.
DATE
GROUP1-18-R-J002 SF1442-A6
Block 20A. NAME AND
TITLE OF PERSON
AUTHORIZED TO SIGN
OFFER (Type or print to include email address)
Block 20B. EMAIL
ADDRESS
Block 20C. SIGNATURE Block 20D.
OFFER DATE
Block 26 --This Task Order will be administered by:
MIAMI RESIDENT OFFICE
3000 SW 148TH AVENUE, SUITE 251
MIRAMAR, FLORIDA 33027
Block 27 -- Payment will be made by:
USACE FINANCE CENTER
ATTN: CEFC-AO-PEFC-AO-P
5722 INTEGRITY DRIVE
MILLINGTON, TN 38054-5005
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
PORT EVERGLADES HARBOR
MAINTENANCE DREDGING, 42-FOOT PROJECT
BROWARD COUNTY, FLORIDA
GROUP1-18-R-J002 00010A-1
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________
0002 EXCAVATION, UNCLASSIFIED
ENTRANCE CHANNEL WITH DISPOSAL AT D/A-B
(ESTIMATED QUANTITY) 96,000 CUBIC YARD $___________ $_______________
0003 EXCAVATION, UNCLASSIFIED
NTB, MTB, SP, AND TN WITH
DISPOSAL AT ODMDS (ESTIMATED QUANTITY) 137,000 CUBIC YARD $___________ $_______________
0004 TURBIDITY MONITORING JOB $_______________
0005 ENDANGERED SPECIES OBSERVER
(HOPPER DREDGE ONLY) JOB $_______________
0006 DEDICATED MANATEE OBSERVER
(CLAMSHELL/MECHANICAL DREDGING ONLY) JOB $_______________
0007 ENVIRONMENTAL SPECIES MONITORING JOB $_______________
0008 BEACH TILLING (ESTIMATED QUANTITY) 6 ACRE $_______________$_______________
0009 WRACK DEBRIS REMOVAL
(ESTIMATED QUANTITY) 27 TON $_______________$_______________
0010 CONSTRUCTION/VIBRATION CONTROL AND
MONITORING JOB $_______________
0011 MAINTENANCE AND PROTECTION OF TRAFFIC JOB $_______________
0012 STANDBY TIME (SEE NOTE 5) 24 HOUR $___________ $_______________
0013 PARTNERING REGROUP 1 EACH $___________ $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0013) $_______________
OPTION A
0014 EXCAVATION, UNCLASSIFIED
PORT BERTHING AREAS
DISPOSAL AT ODMDS (ESTIMATED QUANTITY) 59,000 CUBIC YARD $___________ $_______________
0015 TURBIDITY MONITORING JOB $_______________
0016 ENDANGERED SPECIES OBSERVER
(HOPPER DREDGE ONLY) JOB $_______________
0017 DEDICATED MANATEE OBSERVER
(CLAMSHELL/MECHANICAL DREDGING ONLY) JOB $_______________
0018 STANDBY TIME (SEE NOTE 5) 24 HOUR $___________ $_______________
TOTAL OPTION A (LINE ITEMS 0014 THROUGH 0018) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0018) $_______________
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
PORT EVERGLADES HARBOR
MAINTENANCE DREDGING, 42-FOOT PROJECT
BROWARD COUNTY, FLORIDA
GROUP1-18-R-J002 00010A-2
NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANITITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY
BE EXCEEDED.
(2) OFFERORS MUST PRICE ALL LINE ITEMS. SEE SECTION 00100 INSTRUCTIONS TO OFFERORS.
(3) AN ENDANGERED SPECIES OBSERVER IS REQUIRED FOR A HOPPER DREDGE ONLY. A DEDICATED MANATEE
OBSERVER IS REQUIRED FOR CLAMSHELL DREDGING ONLY.
(4) THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL BID ITEM(S) ON OR BEFORE 30 NOVEMBER
2020. SEE CLAUSE 52.217-7 OF SECTION 00700.
(5) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO ENDANGERED SPECIES CONCERNS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. REQUIREMENTS FOR WORK STOPPAGES, DELAYS, OR OTHER IMPACTS ASSOCIATED WITH COMPLIANCE WITH SECTION 01 57 20 ENVIRONMENTAL PROTECTION ARE NOT PAID FOR UNDER THIS LINE ITEM. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00
MEASUREMENT AND PAYMENT.
SECTION 00010A, Attachment A
INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) September 4, 2020, Close of Business. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet.
The Solicitation Number is: GROUP1-18-R-J002
The Bidder Inquiry Key is: IWTP4J-87CHZV
Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:
1. Identify the Agency. This should be marked as USACE.
2. Email. Enter the email address you would like to use for communication.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you used to register previously in ProjNet.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
THE FOLLOWING PAGES CONTAIN ADDENDUMS
TO SPECIFIC SECTIONS OF THE ORIGINAL SOLICITATION
NUMBER W12EP18R0029
THESE ADDENDUMS ARE ONLY APPLICABLE TO
THIS SPECIFIC TASK ORDER
REQUEST FOR PROPOSAL NUMBER: GROUP1-18-R-J002
TASK ORDER PROJECT TITLE:
PORT EVERGLADES HARBOR,
MAINTENANCE DREDGING 42-FOOT PROJECT,
BROWARD COUNTY, FLORIDA
NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.
GROUP1-18-R-J002 Clause Addendum-1
GROUP1-18-R-J002 00100-A1
ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00100
ARE HEREBY PROVIDED:
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
Broward County, FL.
15.5%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the
GROUP1-18-R-J002 00100-A2
(d) Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(e) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(f) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Broward County, Florida.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB
1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for August 25, 2020 at 11:00 AM Local Time.
(c) Participants will meet at -- (Location will be provided by the contract administration office via telephone. See (d)below.)
(d) Participants should email Mr. Leo Bastante at Leopoldo.A.Bastante@usace.army.mil on or before August 24, 2020 by 3:00 PM Local Time to make arrangements.
(e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 01 11 00 of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)
mailto:Leopoldo.A.Bastante@usace.army.mil
GROUP1-18-R-J002 00100-A3
(f) After the site visit, a memorandum summarizing the visit may be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Addendum to the Standard Form 1442.
(End of provision)
GROUP1-18-R-J002 00700-A1
ADDENDUM TO SECTION 00700, CONTRACT CLAUSES
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700
ARE HEREBY PROVIDED:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 140 calendar days after the NTP. The time stated for completion shall include final cleanup of the premises. Performance period consists of the Base:
(125 calendar days, including 60 calendar day’s commencement), Option A:
(15 calendar days).
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,516.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE
ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor on or before 30 November 2020. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
GROUP1-18-R-J002 00700-A2
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general—
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Port Everglades Harbor, GROUP1-18-R-J002 G-01 Maintenance Dredging.
42-Foot Project, Broward County, Florida
(End of clause)
GROUP1-18-R-J002 00800-A1
ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE
HEREBY PROVIDED:
LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR
SUBCONTRACTORS
The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following: plant and equipment.
ADDENDUM TO SECTION 00800A, WAGES DETERMINATIONS AND OTHER
ATTACHMENTS
THE FOLLOWING WAGES RATES ARE HEREBY INCORPORATED INTO THIS TASK
ORDER:
LIST OF CONSTRUCTION CONTRACT ATTACHMENTS
No. TITLE DATE NO. OF
PAGES
1 General Decision Number FL20200002 01/03/2020 5
2 General Decision Number FL20200003 01/03/2020 4
3 General Decision Number FL20200107 08/14/2020 5
GROUP1-18-R-J002 00800A-1
NOTE NOTE NOTE
THIS PROJECT INCORPORATES THE STATEWIDE HEAVY DREDGING AND HOPPER
DREDGING WAGE DECISIONS FOR FLORIDA AND THE HEAVY CONSTUCTION
WAGE DECISION FOR BROWARD COUNTY, FLORIDA
EXECUTIVE ORDER (EO) 13658 ESTABLISHES AN HOURLY MINIMUM WAGE OF
$10.80 FOR 2020 THAT APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-BACON
ACT FOR ALL HOURS PERFORMED ON THE CONTRACT IN CALENDAR YEAR 2020.
IF YOU HAVE ANY QUESTIONS CONCERNING THE APPLICATION OF THE WAGE DECISIONS
FURNISHED FOR THIS PROJECT, PLEASE CONTACT:
FRANRUSSELL,OFFICE OF COUNSEL,JACKSONVILLE DISTRICT, U.S. ARMY
CORPSOF ENGINEERS AT fran.g.russell@usace.army.mil
GROUP1-18-R-J002 00800A-2
mailto:fran.g.russell@usace.army.mil
"General Decision Number: FL20200002 01/03/2020
Superseded General Decision Number: FL20190002
State: Florida
Construction Type: Heavy Dredging
Counties: Florida Statewide.
Dredging Construction Projects FLORIDA (Excluding West of the Aucilla River and its tributary waterways)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(l)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.l(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number
Publication Date 01/03/2020
* ENGI0025-002 10/01/2019
Dredging : (Hydraulic Dredges Over 20'"')
CLASS Al .................... $
CLASS A2 •••••••••••••••••••• $
CLASS Bl .................... $
CLASS B2 .................... $
CLASS Cl .................... $
CLASS C2 .........•.......... $
CLASS D ..................... $
Hydraulic Dredges Under 20"" Cook ........................ $ Deckhand .........•.......... $ Engineer .................... $ Launchman ................... $ Leverman .................... $ Mate .............•.......... $
Rates
40.31 35.92 34.86 32.82 31.92 30.89 25.66
8.11 7.77 9.59 8.19
10.03 8.82
Fringes
17.71+a 17.71+a 17.71+a 17.71+a 17.61+a 17.61+a 17.51+a
1.73+b 1.73+b 1.73+b 1.73+b 1.73+b 1.73+b
GROUP1-18-R-J002 00800A-3
Mess Cook ................... $ 7.71 Messman & Janitor ........... $ 7.53 Oiler & Fireman ............. $ 8.11 Shoreman .........•.......... $ 7.82 Spider Barge Operator ....... $ 8.68 Spill Barge Operator ........ $ 8.68 Welder ...................... $ 9.79
CLASSIFICATIONS:
1.73+b 1.73+b 1.73+b 1.73+b 1.73+b 1.73+b 1.73+b
CLASS Al: Deck Captain, Leverman, Mechanical Dredge Operator.
Licensed Tug Operator over 1000 HP
CLASS A2: Crane Operator (360 swing) CLASS Bl: Derrick Operator (180 swing), Spider/Spill Barge Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician, Licensed Boat Operator, Licensed Crew Boat Operator.
CLASS B2: Certified Welder.
CLASS Cl: Mate, Drag Barge Operator, Welder, Assistant Fill Placer, Steward.
CLASS C2: Boat Operator.
CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor, Drill Oiler
PREMIUMS: Additional 20% for hazardous material work
FOOTNOTE APPLICABLE TO ABOVE CRAFTS:
a. New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.
b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.
INCENTIVE PAY : (Add to Hourly Rate)
Operator (NCCCO License/Certification) $1.80; Licensed Tug Operator over 1000 HP (Assigned as Master) USCG licensed Master of Towing Vessels (MOTV) $1.80; Licensed Boat Operator (assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80; Oiler QMED and Tankerman endorsement (USCG) $1.80; All classifications Tankerman endorsement only (USCG) $1.55; Deckhand or Mater AB w/Lifeboatman only (USCG) $1.80; Welder (ABS certification) $1.55
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including
GROUP1-18-R-J002 00800A-4
preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
GROUP1-18-R-J002 00800A-5
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, GROUP1-18-R-J002 00800A-6 etc.) that the requester considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
GROUP1-18-R-J002 00800A-7
"General Decision Number: FL20200003 01/03/2020
Superseded General Decision Number: FL20190003
State: Florida
Construction Types: Heavy Dredging
Counties: Florida Statewide.
HOPPER DREDGE CONSTRUCTION PROJECTS
Note: Under Executive Order {EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(l)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.l(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number
SUFL1993-010 05/24/1993
Publication Date 01/03/2020
Rates
Self-Propelled Hopper Dredge Drag Tenders ..•..•••..•..••. $ 8.21
Fringes
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this
GROUP1-18-R-J002 00800A-8
contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007
GROUP1-18-R-J002 00800A-9
in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor
200 Constitution Avenue, N.W.
GROUP1-18-R-J002 00800A-10
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requester considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
GROUP1-18-R-J002 00800A-11
GROUP1-18-R-J002 00800A-12
GROUP1-18-R-J002 00800A-13
GROUP1-18-R-J002 00800A-14
GROUP1-18-R-J002 00800A-15
GROUP1-18-R-J002 00800A-16
Port Everglades Harbor, Maintenance Dredging
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES (SEE BASE MATOC)
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES (SEE BASE MATOC)
01 35 25 OWNER SAFETY REQUIREMENTS - DIVING (SEE BASE MATOC)
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS (SEE BASE MATOC)
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) (SEE
BASE MATOC)
01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY
CONTROL (SEE BASE MATOC)
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 55 10 CLEARING AND GRUBBING FOR ACCESS AND STAGING AREAS
01 55 26 TRAFFIC CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 22 13 VIBRATION MONITORING REQUIREMENTS FOR EXISTING STRUCTURES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 93 00 COASTAL VEGETATION PLANTING
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23 DREDGING
35 20 26 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW -
ULLAGE PROFILE
35 20 27 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM PIPELINE
HYDRAULIC DREDGE
35 20 28 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION 00 31 21 CONTROL MONUMENT DESCRIPTIONS
SECTION 00 31 21 Page 1
Designation: USN NORTH RANGE NO. 5
PID: CS4034
Stamping: USN NORTH RANGE NO. 5 1981 1985 Setting: Set in top of concrete monument
Description: To reach from the intersection of US-1 and A1A N (E Dania Beach Blvd) in Fort Lauderdale, go east on A1A
2.0 miles to loop in road. Continue around loop and proceed north on N Ocean Dr 0.35 miles to entrance to Dr. Von D Mizell-Eula Johnson State Park. Continue north thru park for 2.25 miles to entrance to Naval Facility NAVSEA Warfare Center. Pass through gate and bear right to station location. Station is located 13 ft west of concrete slab, 32 ft south of asphalt road, and 39.4 ft NE of antenna tower. For access to this monument, contact Ms. Lisa Shortt, NAVSEA, at 954-926-4000 at least 5 days in advance.
Source: OPUS - page5 1209.04
SECTION 00 31 21 Page 2
DESIGNATION - 872 2957 TIDAL 2
PID - AD5884
TIDAL BM - This is a Tidal Bench Mark.
MARKER: TIDAL STATION DISK SET IN A MASSIVE RETAINING WALL
SP_SET: CONCRETE BULKHEAD
STAMPING: NO 2 1973
MARK LOGO: NOS
STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL
HISTORY - Date Condition Report By
HISTORY - 1973 MONUMENTED NOS
HISTORY - 1981 GOOD FLDNR
HISTORY - 19980205 GOOD USPSQD
STATION DESCRIPTION BY FL DEPT OF NAT RES 1981
3.9 MI ENE FROM DANIA. BEGIN AT THE INTERSECTION OF U.S. HIGHWAY 1
AND STATE ROAD A1A IN DANIA, GO 2.0 MILES EAST ON A1A TO ITS JUNCTION
WITH A PAVED ROAD LEADING NORTH TO DR. VON D. MIZELL-EULA JOHNSON
STATE PARK, GO NORTH ON THE PAVED ROAD FOR 1.9 MILES TO A BRIDGE OVER
NORTH DANIA SOUND AND THE MARK. THE MARK IS SET IN THE SOUTH BULKHEAD
UNDER THE BRIDGE, 39 FEET EAST OF A 45 DEGREE CORNER IN THE BULKHEAD,
36.4 FEET WEST OF ANOTHER 45 DEGREE CORNER, AND RECOVERED AS DESCRIBED
IN NOS TIDAL DATA. - - THE MARK IS 12 FT BELOW ROAD.
STATION RECOVERY NOTE BY US POWER SQUADRON 1998
RECOVERED IN GOOD CONDITION.
SECTION 00 31 21 Page 3
Designation: GANNET
PID: BBFH37
Stamping: GANNET, 2016, JAX DIST Stability: May hold, commonly subject to ground movement
Setting: Object surrounded by mass of concrete Description: Mark is located in Ft. Lauderdale, Florida on US Coast Guard Station Ft Lauderdale. To reach, enter Dr.
Von D. Mizell-Eula Johnson State Park and proceed north on Ocean Drive to entrance to USCG Ft Lauderdale on left. Proceed through entrance to mark located on the west seawall of USCG property.
Mark is a brass disk set in a concrete seawall. Located 26.5' south of a metal light pole, 3.1' east of the west edge of concrete seawall, and 7.9' west of the west edge of asphalt drive.
SECTION 00 33 50 WEATHER, WATER STAGE AND TIDE DATA
SECTION 00 33 50 Page 1
1. The following water stage, wave, wind, and weather data are provided for inclusion into the subject Plans and Specifications.