PIP-II Cryoplant Electrical Phase 3

Closed Pre-Solicitation Posted

Solicitation number
PIPII-367299-STE
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Batavia, Illinois 60510, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Energy's Fermi National Accelerator Laboratory (Fermilab) is seeking electrical contractors to complete the PIP-II Cryoplant Electrical Make Ready Phase 3 project. The scope of work involves comprehensive electrical infrastructure installation, including removing and installing conduit, junction boxes, wire, and motor controls for the cryogenic facility. Interested contractors must email sandraef@fnal.gov to receive the Request for Proposal (RFP), with the understanding that the Statement of Work, specifications, and drawings may change before final issuance. Potential bidders should be prepared to provide complete project management, including labor, equipment, transportation, overhead, bonding costs, safety oversight, and quality control. The pre-solicitation notice indicates a tight response timeline, with interested parties required to express interest by March 17, 2025.

The contract is designated as a total small business set-aside within the NAICS 238210 category for Electrical Contractors and Other Wiring Installation Contractors. While specific award value is not disclosed, the technical specifications suggest a complex project requiring sophisticated electrical engineering capabilities, detailed documentation, and strict safety protocols. The work involves intricate electrical system installations, including power distribution systems, grounding systems, UPS power distribution, and wiring for specialized scientific equipment. Contractors will need to provide comprehensive documentation, including operation and maintenance manuals, conduct staff training, maintain as-built drawings, and perform system commissioning and testing. The project scope indicates a highly technical engagement with specific requirements for coordination, safety procedures, and adherence to Fermilab's operational guidelines.

Notice text

PLEASE EMAIL SANDRAEF@FNAL.GOV WITH YOUR INTEREST IN RECEIVING AN RFP.

Note that the SOW, Specification and drawings may change at time of RFP issuance. 

Scope of Work
All labor, equipment, transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to mobilize, procure, and install the PIP-II Cryo Plant Electrical Make Ready Phase 3 work. This work primarily consists of electrical trades work removing and installing conduit, junction boxes, wire and motor controls.

Files

File Type Posted
4-3-3C3 Set r4 (3).pdf PDF
4-3-3C3 Specificaitons Set r2 (3).pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
PIP-II f-37 building LWC pump room piping system installation Batavia, Illinois 60510, United States · NAICS 23822 Fermi National Accelerator Laboratory No set-aside
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB Batavia, Illinois 60510, United States · NAICS 236210 Fermi National Accelerator Laboratory No set-aside
PIP-II ssrs and LB650 vacuum gauge and readout Illinois 60510, United States · NAICS 334513 Fermi National Accelerator Laboratory No set-aside
Building 510 Substation Upgrade - Phase I New York 11973, United States · NAICS 238210 Office of Science Total Small Business
PIP-II CM 2K Reclosable Pressure Safety Relief Valves NAICS 332911 Fermi National Accelerator Laboratory No set-aside