Physical Access Control System (PACS)
Closed Solicitation Posted
- Solicitation number
- FA485523Q0067
- Agency
- Air Force Special Operations Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 334290 Other Communications Equipment Manufacturing
- Place of performance
- Cannon AFB, New Mexico 88103, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force is seeking a contractor to provide a Physical Access Control System (PACS) for the 318 SOS at Cannon AFB, NM. The contractor will be responsible for providing all management, tools, supplies, equipment, and labor necessary to operate and maintain the system, including a 24-hour access control system, all necessary hardware and software, and hands-on training for facility managers and security personnel. The performance period for this contract will begin no more than 120 days from the date of award for a period of no more than 15 business days.
List of products and services to be provided by the contractor:
- A 24-hour access control system to building 190 at Cannon AFB, NM.
- The ability for CAC, visitor badge, and/or code entry to 3 exterior doors.
- The ability for specific badge or visitor badge entry to 1 interior door to an OSA/SCIF area.
- All necessary hardware, peripherals, and equipment for a complete installation of the system.
- A minimum of a one-year full warranty.
- Hands-on training for the facility managers and security personnel of building 190.
- A descriptive binder of reference materials.
- Control panel for CAC access with magnetic locks installed on doors for access.
- Control panel for OSA/SCIF badge access with magnetic locks installed on doors for access.
- Access Control System software configuration including the management of doors and user data via recommended stand-alone PC(s).
- Installation services between the hours of 0730-1630 until completion.
- Proper emergency communication details.
- Adherence to standards of conduct as established by the Installation Commander and current installation security policies.
- An interpreter if English is not the primary language of the workers.
Notice text
3 versions
Update #3 · Latest ·
The intent of this requirement is to provide the 318 Special Operations Squadron with a Physical Access Control System (PACS) to allow for secure entry and access to building 190. The vendor would both provide and install the physical access control system. The results of this installation would allow for four (4) total door access panels, with three (3) exterior door access panels with associated card readers/codes, one (1) interior door access panel for entry into a secure open storage area.
Please use the Combo Synopsis / Solicitation Attachment for your company information and quote.
QUOTES MUST BE VALID UNTIL 30 SEPTEMBER 2023
Combo Synopsis / Solicitaiton
Attachment 1 - Provisions and Clauses
Attachment 2 - PWS
Attachment 3 - Wage Determination 2015-5457
Questions
Bldg map attachment
Update #2 ·
The intent of this requirement is to provide the 318 Special Operations Squadron with a Physical Access Control System (PACS) to allow for secure entry and access to building 190. The vendor would both provide and install the physical access control system. The results of this installation would allow for four (4) total door access panels, with three (3) exterior door access panels with associated card readers/codes, one (1) interior door access panel for entry into a secure open storage area.
Please use the Combo Synopsis / Solicitation Attachment for your company information and quote.
QUOTES MUST BE VALID UNTIL 30 SEPTEMBER 2023
Combo Synopsis / Solicitaiton
Attachment 1 - Provisions and Clauses
Attachment 2 - PWS
Attachment 3 - Wage Determination 2015-5457
Questions
Bldg map attahcment
Update #1 ·
The intent of this requirement is to provide the 318 Special Operations Squadron with a Physical Access Control System (PACS) to allow for secure entry and access to building 190. The vendor would both provide and install the physical access control system. The results of this installation would allow for four (4) total door access panels, with three (3) exterior door access panels with associated card readers/codes, one (1) interior door access panel for entry into a secure open storage area.
Please use the Combo Synopsis / Solicitation Attachment for your company information and quote.
QUOTES MUST BE VALID UNTIL 30 SEPTEMBER 2023
Combo Synopsis / Solicitaiton
Attachment 1 - Provisions and Clauses
Attachment 2 - PWS
Attachment 3 - Wage Determination 2015-5457
Attachments
| File | Type | Posted |
|---|---|---|
| Questions.pdf | ||
| Questions.pdf | ||
| Bldg 190 - Office Map.pdf | ||
| Questions.pdf | ||
| Attachment 1 - Provisions and Clauses.pdf | ||
| Attachment 3 - WD 2015-5457.pdf | ||
| Combo Synopsis Solicitation - FA485523Q0067 - PACS.pdf | ||
| Attachment 2 - PWS.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity