Please find attached site visit sign in sheets. Site Visits were held on:
- 20 June 19, with four companies in attendance
- 27 June 19, with three companies in attendance
- 1 July 29, with one company in attendance..

Update #2 ·

52.237-1 Site Visit.
Site Visit (APR 1984)
Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
52.236-27 Site Visit (Construction).
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigation and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for June 20th, 2019 at 9:00am Central Standard Time
(c) Participants will meet at â€" The FEAD building, 427 Allen road, Meridian MS 39309
OR
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Jason Clayton, Contracting Officer
Address: 427 Allen Road, Meridian MS 39309
Telephone: 601-679-2510
Email: jason.e.clayton@navy.mil
Base access procedures require that all individuals seeking access to NAS Meridian are subject to a federal background check. New SECNAV 5512/1 (Background Forms) must be completed and turned in to Pass and ID by the individuals’ Base Sponsor. (For the purposes of this site visit, the Base Sponsor will be Jason Clayton)
All individuals entering the installation will need to complete the following tasks:
1. Completing a SECNAV 5512/1 (attached with solicitation)
2. Provide two forms of Government ID, for example a Valid Driver’s License, Social Security Card, Current Firearms Permit, or Hunting/Fishing License.
3. Provide proof of Current Insurance and Vehicle registration.
4. Be entered into the DBIDS system (takes about 5 to 10 minutes)
Pass and ID issues daily passes, but If a contractor is completing a project that will take more than one day, Pass and ID can issue an extended Pass at the request of the Contractors Base Sponsor no exceptions. Extended requests should include the name of the individuals to receive an extended pass and a start and end date.
- PDF File of UFC for clearer drawings in Appendix C
- PDF drawing of fence layout to replace file that is cut off
- PDF fillable federal background check form.

Update #1 ·

Contractor will remove approximately 500 linear feet of existing chainlink fencing, post, rails, gates and any other fencing accessories from the building 418 compound.
• Upon removal of the existing fencing system, install a New Chainlink Fencing fabric with all post, rails, gates, and any other accessories required for a complete fencing system to be installed at the same boundary locations as the existing fencing. Fencing fabric shall be no less than 7 (seven) feet tall, with a 1 (one) foot top guard of barbed wire, for a total fence height of 8 feet.
The new fencing must be minimum 9â€gage wire mesh and mesh openings must be not be greater than 2â€inches (51 mm) per side. Fence fabric material will be galvanized steel, or
aluminum coated steel fabric.
See UFC 4â€022â€03 for all fencing requirements.
• Install a 21 linear foot gate system as indicated on the provided drawings. Install outriggers(support arms) at 45â€degree angles in a single arm (towards the threat side) or “Yâ€/â€V†configuration, constructed of a single or double outrigger consisting of 18â€inch (457 mm) arm(s),
each having three strands of barbed wire at regular intervals along the top of the fence.
o The outriggers must provide a minimum of an additional 12 inches (305 mm) to the fence height. The top guard fencing adjoining gates may range from a vertical height of 18 inches (457 mm) to the normal 45 degree outward protection, but for a limited distance along the fence line to adequately open the gates.
Outriggers must be permanently affixed to the fence posts with screws or by spot welding. Screws used to affix outriggers to posts must be made tamperâ€proof either by design, peening, or welding..

Files

Notice history

Notice Type Posted
Bld 418 Pest Control Fencing Project Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors