PERL 264852 - Replace Shoreside Dock
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140P2021R0016
- Agency
- National Office National Park Service, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is seeking proposals to replace the existing shoreside floating dock and install a new mooring system at Pearl Harbor National Memorial in Honolulu, Hawaii. The National Park Service seeks to award a firm-fixed price contract to remove two aging concrete floating dock sections measuring 90 feet by 15 feet by 8 feet, and replace them with two new post-tensioned concrete floating dock sections of similar dimensions equipped with safety and operational features. The project also requires replacing two pedestrian gangways, removing four guide piles, and installing a new shoreside structural mooring system. The solicitation is expected to issue on April 20, 2021, with proposals due June 3, 2021. Evaluation will consider technical approach, past performance, and price.
This proposed 100% small business set-aside contract has an anticipated value between $1 million to $5 million. NAICS code 237990 for marine dock construction applies. The period of performance is from July 2021 to August 2022. The pre-proposal conference will be held on May 4, 2021 at the project site. Replacement of the 90-foot by 15-foot floating dock sections and installation of the new mooring system are intended to provide improved facilities for Pearl Harbor National Memorial visitors.
Notice text
The purpose of this project is to replace the existing two concrete floating dock sections at the Pearl Harbor Visitor Center shoreside dock area with two new post-tensioned, pre-fabricated floating dock sections of approximately the same size dimensions (each 90' L x 15' W x 8' D). The new dock sections will be equipped with skid resistant coatings, anodized aluminum rails and gates, mooring cleats and fenders, a dive ladder and a davit for lifting heavy items into/out of the water. The two existing pedestrian gangways will be replaced with new gangways and the existing guide piles that secure the dock sections in place will be removed. In addition, a new shoreside structural mooring system will be installed on the land to provide stabilization for the new dock and gangways.
Attachments
| File | Type | Posted |
|---|---|---|
| B01_PreSolitNotice_revised04.08.2021_4.docx | DOCX document | |
| B08_PERL 264852 Shoreside Dock Specifications 3.11.21_3.pdf | ||
| B01_Synopsis_PreSolitNotice_3.pdf | ||
| B08_PERL 264852 Shoreside Dock Drawings PM-signed 3.17.21 _3.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| PERL 264852 Pearl Harbor National Monument Repla | Award Notice | |
| PERL 264852 Pearl Harbor National Monument Repla | Solicitation | |
| PERL 264852 - Replace Shoreside Dock | Pre-Solicitation | |
| PERL 264852 Pearl Harbor National Monument Replace Shoreside Dock at Pearl Ha | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity