About this opportunity

The National Park Service seeks to replace two floating dock sections and gangways at the Pearl Harbor Visitor Center. The project entails furnishing and installing two new post-tensioned prefabricated dock sections measuring approximately 90 feet by 15 feet by 8 feet along with anti-skid coatings, rails, gates, cleats, fenders, a dive ladder and davit. Interested parties must demonstrate experience with maritime construction, working in active harbors, protecting cultural resources, phased construction maintaining public access. Responses to the sources sought notice are due November 30th and must include capabilities for logistics, construction experience, and protecting resources while maintaining public access.

There is no set-aside designated for this procurement. The estimated cost range for replacement is between $1 million to $5 million to be completed between June 2021 through August 2022. The NAICS code is 237990 and PSC code is F999 for general construction. The incumbent contractor was not named but the purpose is to replace the existing dock ensuring continued safe access for over 1 million annual visitors to the USS Arizona Memorial and extend the lifespan to 20-30 years.

Notice text

2 versions

Update #2 · Latest ·

The purpose of this project is to replace the existing two concrete floating dock sections at the Pearl Harbor Visitor Center shoreside dock area with two new post-tensioned, pre-fabricated floating dock sections of approximately the same size dimensions (each 90' L x 15' W x 8' D). The new dock sections will be equipped with skid resistant coatings, anodized aluminum rails and gates, mooring cleats and fenders, a dive ladder and a davit for lifting heavy items into/out of the water. The two existing pedestrian gangways will be replaced with new gangways and the existing guide piles that secure the dock sections in place will be removed. In addition, a new shoreside structural mooring system will be installed on the land to provide stabilization for the new dock and gangways.

The shoreside dock provides the only access to the USS Arizona Memorial for over one million visitors annually. This project will extend the life cycle of the dock to a 20-30 year period ensuring safe, stable and continued visitor access to the USS Arizona Memorial which is a major destination for many US and international visitors to Hawaii. It reduces risks and hazards for the visitors and enables the park to meet it's mission.

Update #1 ·

The purpose of this project is to replace the existing two concrete floating dock sections at the Pearl Harbor Visitor Center shoreside dock area with two new post-tensioned, pre-fabricated floating dock sections of approximately the same size dimensions (each 90¿ L x 15¿ W x 8¿ D). The new dock sections will be equipped with skid resistant coatings, anodized aluminum rails and gates, mooring cleats and fenders, a dive ladder and a davit for lifting heavy items into/out of the water. The two existing pedestrian gangways will be replaced with new gangways and the existing guide piles that secure the dock sections in place will be removed. In addition, a new shoreside structural mooring system will be installed on the land to provide stabilization for the new dock and gangways.

The shoreside dock provides the only access to the USS Arizona Memorial for over one million visitors annually. This project will extend the life cycle of the dock to a 20-30 year period ensuring safe, stable and continued visitor access to the USS Arizona Memorial which is a major destination for many US and international visitors to Hawaii. It reduces risks and hazards for the visitors and enables the park to meet it¿s mission.

Files

Notice history

Notice Type Posted
PERL 264852 Pearl Harbor National Monument Repla Award Award Notice
PERL 264852 Pearl Harbor National Monument Repla Latest solicitation Solicitation
PERL 264852 - Replace Shoreside Dock Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Building 143 Concrete Scale Pad Expansion and Dock Leveler Replacement 9500 MacArthur BlvdWest Bethesda, MD 20817 20817 · NAICS 236220 Naval Sea Systems Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors