This is a pre-solicitation notice for project 140P2021R0016 to replace the existing shoreside dock at Pearl Harbor Visitor Center. The project scope includes removing the two existing concrete floating dock sections and replacing them with two new post-tensioned, pre-fabricated floating dock sections measuring approximately 90' L x 15' W x 8' D each. The replacement dock sections will include skid resistant coatings, anodized aluminum rails and gates, mooring cleats and fenders, a dive ladder, and a davit for lifting heavy items. The two existing pedestrian gangways and guide piles securing the existing dock sections in place will also be removed and replaced. A new shoreside structural mooring system will be installed on land to provide stabilization for the new dock and gangways. The solicitation is being conducted by the National Park Service, Department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B01_PreSolitNotice_revised04.08.2021_4.docx | DOCX document | |
| B08_PERL 264852 Shoreside Dock Specifications 3.11.21_3.pdf | ||
| B01_Synopsis_PreSolitNotice_3.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
ALOHA
AutoCAD SHX Text
STADIUM
AutoCAD SHX Text
KAMEHAMEHA HIGHWAY
AutoCAD SHX Text
SALT LAKE
AutoCAD SHX Text
BLVD.
AutoCAD SHX Text
NAVAL
AutoCAD SHX Text
RESERVATION
AutoCAD SHX Text
NORTH ROAD
AutoCAD SHX Text
KAMEHAMEHA HIGHWAY
AutoCAD SHX Text
FOSTER
AutoCAD SHX Text
VILLAGE
AutoCAD SHX Text
PEARL HARBOR
AutoCAD SHX Text
SOUTHEAST
AutoCAD SHX Text
LOCH
AutoCAD SHX Text
FORD
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text H1
AutoCAD SHX Text H1
AutoCAD SHX Text
AutoCAD SHX Text
ARIZONA STREET
AutoCAD SHX Text
KAMEHAMEHA HIGHWAY
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
DRIVE WAY
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
FRANKLIN AVENUE
AutoCAD SHX Text
QUINCY AVENUE
AutoCAD SHX Text
OKLAHOMA ST.
AutoCAD SHX Text
NORTH ROAD
AutoCAD SHX Text
HURT AVENUE
AutoCAD SHX Text
LANGLEY AVENUE
AutoCAD SHX Text
HUNTER STREET
AutoCAD SHX Text
KUAHUA AVENUE
AutoCAD SHX Text
NEOSHO AVENUE
AutoCAD SHX Text
ASTORIA AVENUE
AutoCAD SHX Text
COWPENS STREET
AutoCAD SHX Text
ATLANTA STREET
AutoCAD SHX Text
HURT AVENUE
AutoCAD SHX Text
LEXINGTON BOULEVARD
AutoCAD SHX Text
NORTHHAMPTON AVENUE
AutoCAD SHX Text
PIERCE STREET
AutoCAD SHX Text
NECHES AVENUE
AutoCAD SHX Text
SAN JUAN AVENUE
AutoCAD SHX Text
NORTH ROAD
AutoCAD SHX Text
INDEPENDENCE STREET
AutoCAD SHX Text
GILMORE STREET
AutoCAD SHX Text
KUAHUA AVENUE
AutoCAD SHX Text
UTAH STREET
AutoCAD SHX Text
GAFFNEY STREET
AutoCAD SHX Text
VINCENNES AVENUE
AutoCAD SHX Text
SIMMS STREET
AutoCAD SHX Text
HALAWA DRIVE
AutoCAD SHX Text
DOWNES STREET
AutoCAD SHX Text
HALAWA DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S556
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S485
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S235
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S830
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S767
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TANK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 451K
AutoCAD SHX Text S643
AutoCAD SHX Text
AutoCAD SHX Text 453K
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S633
AutoCAD SHX Text Tanks
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S1144
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S798
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S769
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S251
AutoCAD SHX Text
AutoCAD SHX Text S275
AutoCAD SHX Text S1147
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Tank
AutoCAD SHX Text
AutoCAD SHX Text S756
AutoCAD SHX Text
AutoCAD SHX Text S946
AutoCAD SHX Text S1145
AutoCAD SHX Text
AutoCAD SHX Text Tank
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S770
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S1006
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S1146
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S762
AutoCAD SHX Text
AutoCAD SHX Text 452K
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S755
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S526
AutoCAD SHX Text S965
AutoCAD SHX Text S722
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S256
AutoCAD SHX Text S768
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 18"
AutoCAD SHX Text 12"
AutoCAD SHX Text 4"
AutoCAD SHX Text 12"
AutoCAD SHX Text 24"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 4"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 10"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text 21"
AutoCAD SHX Text 21"
AutoCAD SHX Text 21"
AutoCAD SHX Text 21"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 21"
AutoCAD SHX Text 21"
AutoCAD SHX Text 21"
AutoCAD SHX Text 21"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 10"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 18"
AutoCAD SHX Text 18"
AutoCAD SHX Text 15"
AutoCAD SHX Text 10"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 15"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 10"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 10"
AutoCAD SHX Text 8"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 10"
AutoCAD SHX Text S
AutoCAD SHX Text 6"
AutoCAD SHX Text
ES
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
TEAL STREET
AutoCAD SHX Text
LEXINGTON BLVD
AutoCAD SHX Text
SARATOGA BOULEVARD
AutoCAD SHX Text
LANGLEY AVENUE
AutoCAD SHX Text
BUS
AutoCAD SHX Text
PRINCETON PLACE
AutoCAD SHX Text
PRINCETON PLACE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S195
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S290
AutoCAD SHX Text B1406
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 21"
AutoCAD SHX Text 8"
AutoCAD SHX Text 24"
AutoCAD SHX Text 24"
AutoCAD SHX Text 24"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 18"
AutoCAD SHX Text 18"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 24"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 8"
AutoCAD SHX Text S
AutoCAD SHX Text 8"
AutoCAD SHX Text
FORD ISLAND BLVD
AutoCAD SHX Text
FORD ISLAND BRIDGE
AutoCAD SHX Text P E A R L
AutoCAD SHX Text H A R B O R
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
BASIC DATA:
AutoCAD SHX Text
THIS PROJECT
AutoCAD SHX Text
STATE
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
DENVER SERVICE CENTER
AutoCAD SHX Text
REGION
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
OF
AutoCAD SHX Text
PKG.
AutoCAD SHX Text
NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PEARL HARBOR NATIONAL MEMORIAL
AutoCAD SHX Text
PACIFIC WEST
AutoCAD SHX Text
HONOLULU
AutoCAD SHX Text
HAWAII
AutoCAD SHX Text
AutoCAD SHX Text 149,321
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text 1" = 300'
AutoCAD SHX Text
THIS PROJECT
AutoCAD SHX Text
PEARL HARBOR NATIONAL MEMORIAL VISITOR CENTER
AutoCAD SHX Text
DOCK
AutoCAD SHX Text S4765
AutoCAD SHX Text 12/31/22
AutoCAD SHX Text No.
AutoCAD SHX Text Exp.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SHEET INDEX
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DWG
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
AutoCAD SHX Text
COVER
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
AutoCAD SHX Text G1
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text G2
AutoCAD SHX Text
GEOTECHNICAL BORINGS
AutoCAD SHX Text
AutoCAD SHX Text G3
AutoCAD SHX Text
CONSTRUCTION STAGING AND ACCESS ROUTE PLAN
AutoCAD SHX Text
AutoCAD SHX Text G4
AutoCAD SHX Text
CONSTRUCTION STAGING AREA AT VISITOR CENTER
AutoCAD SHX Text
AutoCAD SHX Text G5
AutoCAD SHX Text
CONSTRUCTION STAGING AREA AT FORD ISLAND RAMP
AutoCAD SHX Text
AutoCAD SHX Text C1
AutoCAD SHX Text
LEGEND AND ABBREVIATIONS
AutoCAD SHX Text
AutoCAD SHX Text C2
AutoCAD SHX Text
SURVEY CONTROL
AutoCAD SHX Text
AutoCAD SHX Text C3
AutoCAD SHX Text
SHORESIDE DOCK EROSION CONTROL PLAN
AutoCAD SHX Text
AutoCAD SHX Text C4
AutoCAD SHX Text
SHORESIDE DOCK DEMOLITION PLAN
AutoCAD SHX Text
AutoCAD SHX Text C5
AutoCAD SHX Text
DOCK AND MOORING SYSTEM PLAN - PHASE 1
AutoCAD SHX Text
AutoCAD SHX Text C6
AutoCAD SHX Text
DOCK AND MOORING SYSTEM PLAN - PHASE 2
AutoCAD SHX Text
AutoCAD SHX Text S1
AutoCAD SHX Text
STRUCTURAL GENERAL NOTES & DOCK-SIDE BRACKET
AutoCAD SHX Text
AutoCAD SHX Text S2
AutoCAD SHX Text
STRUCTURAL STANDARD CONCRETE DETAILS
AutoCAD SHX Text
AutoCAD SHX Text S3
AutoCAD SHX Text
EXISTING CONCRETE ABUTMENT REPAIRS
AutoCAD SHX Text
AutoCAD SHX Text S4
AutoCAD SHX Text
DOCK DECK PLAN AND ELEVATIONS
AutoCAD SHX Text
AutoCAD SHX Text S5
AutoCAD SHX Text
DOCK FLOATATION MODULE PLAN AND SECTIONS
AutoCAD SHX Text
AutoCAD SHX Text S6
AutoCAD SHX Text
GANGWAY SECTIONS AND DETAILS
AutoCAD SHX Text
AutoCAD SHX Text S7
AutoCAD SHX Text
FLOATING DOCK GUARDRAIL DETAILS
AutoCAD SHX Text
AutoCAD SHX Text S8
AutoCAD SHX Text
MISCELLANEOUS DETAILS
AutoCAD SHX Text
AutoCAD SHX Text S9
AutoCAD SHX Text
MOORING SYSTEM DETAILS 1
AutoCAD SHX Text
AutoCAD SHX Text S10
AutoCAD SHX Text
MOORING SYSTEM DETAILS 2
AutoCAD SHX Text
AutoCAD SHX Text S11
AutoCAD SHX Text
MOORING SYSTEM DETAILS 3
AutoCAD SHX Text
AutoCAD SHX Text S12
AutoCAD SHX Text
SPECIAL INSPECTIONS
AutoCAD SHX Text
REPLACE SHORESIDE DOCK AND MOORING SYSTEM
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
QUALITY DESIGN CERTIFICATION
AutoCAD SHX Text
MARK
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
DATE
AutoCAD SHX Text
INITIAL
AutoCAD SHX Text PREPARED IN ACCORDANCE WITH PRELIMINARY DESIGN (TITLE I) DRAWING NO. ________________ VARIANCE FROM PRELIMINARY DESIGN (TITLE I) APPROVED BY SUPERINTENDENT ON DATE: ___________ CONSTRUCTION DRAWING NOT PRECEDED BY PRELIMINARY DESIGN (TITLE I)
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT MANAGER
PMIS-264852
1. GENERAL
1.1. WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE OSHA REGULATIONS.
SEE SPECIFICATION SECTION 01 35 23 - SAFETY REQUIREMENTS FOR ADDITIONAL SAFETY
REQUIREMENTS AND CONTRACTOR PROVIDED SUBMITTALS.
1.2. THE CONTRACTOR SHALL HAVE A DESIGNATED PROJECT SUPERINTENDENT OR
REPRESENTATIVE ON SITE AT ALL TIMES DURING CONSTRUCTION.
1.3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL CONDITIONS
CONTAINED IN PROJECT RELATED PERMITS AND IN OBTAINING ANY OTHER PERMITS THAT
MAY BE REQUIRED. SEE SPECIFICATION SECTION 01 31 00 - PROJECT MANAGEMENT AND
COORDINATION FOR ADDITIONAL PERMIT REQUIREMENTS AND CONTRACTOR PROVIDED
SUBMITTALS.
1.4. CONTRACTOR SHALL CONDUCT FIELD REVIEW AND VERIFY ALL LINES, LEVELS AND
CONDITIONS PRIOR TO BEGINNING OF ANY WORK. SUBMIT TO CONTRACTING OFFICER A
LIST OF IDENTIFIED PROBLEM AREAS. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES
AND COORDINATE WITH CONTRACTING OFFICER REGARDING THE RELOCATION OF
EXISTING UTILITIES AS NEEDED.
1.5. ALL MATERIALS, REQUIRED FOR THE COMPLETE EXECUTION OF THE PROJECT, SHALL BE
FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE NOTED.
1.6. CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION
OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS
REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO
NORMAL WORKING HOURS.
1.7. EXISTING FACILITIES INCLUDING, BUT NOT LIMITED TO THE PARK, ROADS, WALLS, FENCES
AND STRUCTURES DAMAGED BY CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO
MATCH ORIGINAL CONDITION AND TO THE SATISFACTION OF THE CONTRACTING OFFICER
WITHOUT ADDITIONAL COST TO THE GOVERNMENT.
1.8. THE CONTRACTOR SHALL DEVELOP A LAYDOWN AND STAGING PLAN FOR REVIEW AND
APPROVAL BY NPS CONTRACTING OFFICER AND THE US NAVY.
1.9. NATIONAL PARK SERVICE POINTS OF CONTACT
CONTRACTING OFFICER (CO):
GREG PASSIG
NATIONAL PARK SERVICE
PHONE (303) 328-1992
GREGORY_PASSIG@NPS.GOV
CONTRACTING OFFICER'S REPRESENTATIVE (COR):
DARYL LINDEMAN
12795 W. ALAMEDA PARKWAY
LAKEWOOD, CO 80225
PHONE (303) 987-6629
EMAIL: DARYL_LINDEMAN@NPS.GOV
PARK FACILITY MANAGER:
GLEN FICKBOHM
PEARL HARBOR NATIONAL MEMORIAL
1845 WASP BLVD, BUILDING #176, HONOLULU, HI 96818
PHONE (808) 280-8144
PARK SUPERINTENDENT:
SCOTT BURCH, PERL SUPERINTENDENT
PEARL HARBOR NATIONAL MEMORIAL
1845 WASP BLVD, BUILDING #176, HONOLULU, HI 96818
PHONE (808) 725-6146
EMAIL: SCOTT_BURCH@NPS.GOV
NATIONAL PARK SERVICE ENGINEER:
SCOTT HENRICKSON, REGIONAL CIVIL ENGINEER
909 FIRST AVENUE, SUITE 500
SEATTLE, WA 98104
PHONE (206) 220-4258
EMAIL: SCOTT_HENRICKSON@NPS.GOV
1.10. REFERENCE DRAWINGS
NPS DRAWING SET # 017-80,910 FOR REPLACEMENT OF SHORESIDE DOCK, JUNE 1998.
2. PARK NOTES
2.1. THE PROJECT SITE RESIDES WITHIN A NATIONAL PARK THAT ALSO RESIDES WITHIN AN
ACTIVE US NAVAL MILITARY INSTALLATION, THE PEARL HARBOR NAVAL COMPLEX (PHNC)
AND ENVIRONMENTALLY PROTECTED WATERS OF PEARL HARBOR, HAWAII. U.S. NAVY
RESTRICTIONS MAY APPLY TO SITE ACCESS SUCH AS FORD ISLAND, KILO 10-11 PIER,
NAVIGATION THROUGH THE WATERS OF PEARL HARBOR, AND PASSAGE BENEATH THE
FORD ISLAND DRAWBRIDGE. TO AFFECT THE WORK NPS CONTRACTING OFFICER TO MAKE
INITIAL CONTACTS AND COORDINATION WITH AGENCIES, THEN CONTRACTOR TO FOLLOW
UP BY SIMILARLY CONTACTING AND COORDINATING WITH THE U.S. NAVY, U.S. COAST
GUARD AND ANY OTHER GOVERNMENT AGENCY HAVING JURISDICTION OVER THE
NAVIGABLE WATERS OF PEARL HARBOR.
FOR U.S. NAVY FACILITY COORDINATION AND PORT OPERATIONS, CALL JEFF ZIEMER
JBPHH PORT OPERATIONS INSTALLATION PROGRAM MANAGER AT (808) 473-2608.
FOR SECURITY CLEARANCES CONTACT LT RYAN WELLS AT (808) 861-2110.
2.2. COORDINATE WITH THE CONTRACTING OFFICER ON THE SHUT-DOWN CLOSURE SCHEDULE
OF THE WEST OR EAST HALF OF THE VISITOR'S CENTER SHORESIDE DOCK AS REQUIRED.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER A MINIMUM OF 48 HOURS
NOTICE TO MAKE THE SWITCHOVER FROM ONE DOCK TO THE OTHER. SWITCHOVER OF
DOCKS SHALL TAKE NO MORE THAN 24 HOURS. THE PARK WILL BE IN CONTINUOUS USE BY
THE PUBLIC. THE CONTRACTOR SHALL COOPERATE FULLY WITH THE NATIONAL PARK
SERVICE WWII VALOR IN THE PACIFIC NATIONAL MONUMENT FACILITIES MANAGER.
2.3. CONTRACTOR PERSONNEL REPLACING THE SHORESIDE DOCK SHALL NOTIFY THE NAVY
HARBOR CONTROL TOWER (HCT) VIA VHF CHANNEL 69, AND SPECIFICALLY REQUEST “NO
WAKE” IN THE VICINITY OF THE DOCK. THE HCT WILL THEN NOTIFY ALL BOAT OPERATORS
IN THE AREA. THE “NO WAKE” WILL REMAIN IN EFFECT UNTIL REPORTED TO THE HCT THAT
MAINTENANCE OR REPAIRS ARE COMPLETE.
2.4. THE CONTRACTOR SHALL RESTORE DAMAGE CAUSED BY HIS/HER OPERATIONS TO
ORIGINAL CONDITION OR BETTER AT HIS/HER OWN EXPENSE. ALL RESTORATION WORK IS
TO BE DONE IN ACCORDANCE WITH THE SPECIFICATIONS.
2.5. CONTRACTOR SHALL MAINTAIN FIRE DEPARTMENT ACCESS ROUTES AT ALL TIMES.
2.6. CONTRACTOR SHALL PROTECT LAWN AND LANDSCAPE AREAS DURING CONSTRUCTION.
3. CONSTRUCTION
3.1. ALL APPLICABLE CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS, STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION, SEPTEMBER 1986 AND STANDARD DETAILS FOR PUBLIC WORKS
CONSTRUCTION, SEPTEMBER 1984, AS AMENDED, OF THE DEPARTMENT OF PUBLIC
WORKS, CITY AND COUNTY OF HONOLULU AND THE COUNTIES OF KAUAI, MAUI, AND
HAWAII, FOUND AT:
( https://www.honolulu.gov/rep/site/dpp/rules/standard-specifications-counties-state-hawaii.pdf ).
3.2. THE CONTRACTOR SHALL NOTIFY AND COORDINATE WITH JEFF ZIEMER, JBPHH PORT
OPERATIONS INSTALLATION PROGRAM MANAGER AT (808) 473-2608, PRIOR TO ANY
EXCAVATION WITHIN NPS/NAVY FACILITIES.
3.3. SOME CONSTRUCTION ELEMENTS WILL REQUIRE PERFORMANCE OF PRE-CONSTRUCTION
CLEARANCE SURVEYS.
3.4. HOURS OF WORK
3.4.1. 7:00 AM TO 5:00 PM WEEKDAYS, AND AS PER PROJECT SPECIFICATIONS.
3.5. HOURS FOR EQUIPMENT DELIVERY
3.5.1. EQUIPMENT DELIVERY, SUPPLY DELIVERY AND SERVICE/FUELING VEHICLES SHALL
ONLY ENTER AND EXIT SITE WORK AREAS BY THE APPROVED ACCESS ROADS DURING
NORMAL WORKING HOURS. EQUIPMENT DELIVERY, SUPPLY DELIVERY OR
SERVICE/FUELING VEHICLES SHALL ONLY OCCUR BETWEEN 8:00 AM AND 3:30 PM,
MONDAY THROUGH FRIDAY. DELIVERIES OUTSIDE OF THESE HOURS SHALL BE
APPROVED AND COORDINATED WITH THE CONTRACTING OFFICER.
3.6. DAILY COMMUNICATIONS
3.6.1. CONTRACTOR SHALL MAINTAIN FREQUENT COMMUNICATIONS, AT LEAST DAILY, WITH
THE CONTRACTING OFFICER TO DISCUSS DETAILS OF IMPLEMENTATION, ORDER OF
WORK, METHODS OF MINIMIZING ENVIRONMENTAL IMPACTS AND OTHER RELEVANT
COMPONENTS OF CONSTRUCTION. THERE WILL BE COMMUNICATION WITH THE
CONTRACTOR'S ENVIRONMENTAL MONITOR AT LEAST ONCE PER WEEK EITHER IN A
MEETING WITH THE CONTRACTING OFFICER OR INDIRECTLY THROUGH THE
CONTRACTING OFFICER.
3.6.2. THE CONTRACTOR SHALL RADIO PORT OPS TOWER PRIOR TO, AND THE AFTER THE
COMPLETION OF, ALL IN WATER WORK ON A DAILY BASIS.
3.7. OFF-SITE TRAFFIC RESTRICTIONS AND SITE ACCESS
3.7.1. SEE SHEETS G3, G4 AND G5 FOR DESIGNATED ROUTES AND ENTRY POINTS FOR
ACCESS TO THE SITE BY PERSONNEL AND EQUIPMENT. NO OTHER ROUTE MAY BE
USED WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE
CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL NECESSARY SIGNS, BARRICADES,
AND OTHER PROTECTIVE FACILITIES AND SHALL TAKE ALL NECESSARY PRECAUTIONS
FOR THE PROTECTION, CONVEYANCE, AND SAFETY OF THE PUBLIC.
3.8. CLEANING, TRASH, DEBRIS, AND STORAGE
3.8.1. SEE PROJECT PERMITS AND SPECIFICATIONS INCLUDING SECTION 01 57 23
UNDER-AN-ACRE POLLUTION PREVENTION.
3.8.2. THE SITE SHALL BE KEPT FREE OF TRASH AT ALL TIMES. ALL ITEMS USED FOR
CONSTRUCTION PURPOSES SHALL BE REMOVED FROM THE SITE AT THE COMPLETION
OF CONSTRUCTION.
3.8.3. STORAGE OF CONSTRUCTION MATERIAL AND EQUIPMENT ON STREETS WILL NOT BE
PERMITTED.
3.8.4. CONSTRUCTION EQUIPMENT, TOOLS, ETC. SHALL NOT BE CLEANED OR RINSED INTO
A STREET, GUTTER, STORM DRAIN OR HARBOR.
3.8.5. A CONTAINED AND COVERED AREA ON-SITE SHALL BE USED FOR STORAGE OF
CEMENT BAGS, PAINTS, FLAMMABLE, OILS, FERTILIZERS, PESTICIDES, OR ANY OTHER
MATERIALS THAT HAVE POTENTIAL FOR BEING DISCHARGED TO THE STORM DRAIN
SYSTEM AND HARBOR BY WIND OR IN THE EVENT OF A MATERIAL SPILL.
3.8.6. ALL TEMPORARY ON-SITE CONSTRUCTION STOCKPILES SHALL BE SECURELY
COVERED WITH A TARP OR OTHER DEVICE TO CONTAIN DEBRIS.
3.8.7. CONCRETE TRUCKS AND CONCRETE FINISHING OPERATIONS SHALL NOT DISCHARGE
WASH WATER INTO THE STREET GUTTERS, OR THE PROTECTED WATERS OF PEARL
HARBOR.
3.9. UTILITY LOCATION
3.9.1. LOCATIONS OF ALL EXISTING UTILITIES MAY NOT BE SHOWN OR ARE SHOWN AS
APPROXIMATE ONLY. THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN
WORKING NEAR THE UTILITIES ANY AND ALL DAMAGE SHALL BE IMMEDIATELY
REPAIRED AND/OR RESTORED TO ITS ORIGINAL CONDITION BY THE CONTRACTOR AT
HIS/HER EXPENSE. UTILITIES INCLUDE, BUT ARE NOT LIMITED TO ELECTRICAL,
SEWER, WATER, AND COMMUNICATION.
3.9.2. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATION, DEPTH
AND HEIGHT. THEIR VERIFICATION SHALL BE COORDINATED BY THE CONTRACTOR
WITH THE APPROPRIATE UTILITY COMPANY. THE CONTRACTOR SHALL COOPERATE
WITH UTILITY OWNERS TO EXPEDITE THE RELOCATION OR ADJUSTMENT OF THEIR
UTILITIES TO MINIMIZE INTERRUPTION OF SERVICE AND DUPLICATION OF WORK. THE
CONTRACTOR SHALL EXERCISE CARE WHEN WORKING NEAR EXISTING UTILITIES AND
SHALL BE RESPONSIBLE FOR ALL DAMAGE, BREAKS AND/OR LEAKS. IF DAMAGE
OCCURS, THE CONTRACTOR SHALL REPAIR UTILITY AT NO ADDITIONAL EXPENSE TO
THE GOVERNMENT.
3.10. PROPOSED MODIFICATIONS TO PLANS OR SPECIFICATIONS
3.10.1. ANY DEVIATIONS FROM PLANS AND SPECIFICATIONS NEEDS TO BE COMPLETED
AND/OR APPROVED BY DESIGN ENGINEER AND CONTRACTING OFFICER PRIOR TO
IMPLEMENTATION.
3.10.2. SHOULD DISCREPANCIES EXIST BETWEEN ANY ACTUAL ELEVATIONS OR HORIZONTAL
POSITIONS AND THESE PLANS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER.
3.11. UNDERWATER OBSTRUCTIONS
3.11.1. CONTRACTOR WILL CONFIRM THE PRESENCE OF UNDERWATER OBSTRUCTIONS
SUCH AS CONCRETE BLOCKS AND ANCHOR CHAINS, PRIOR TO PROCEEDING WITH
THE WORK AND PROVIDE THESE LOCATIONS ON AS-BUILT RECORD DRAWINGS.
4. PERMITTING
4.1. COMPLIANCE WITH REGULATORY PERMITS
4.1.1. THE CONTRACTOR SHALL COMPLETELY REVIEW, BE FAMILIAR WITH AND ADHERE TO
THE TERMS OF ALL REGULATORY PERMITS AND AGENCY APPROVALS FOR THIS
PROJECT, INCLUDING THE U.S. ARMY CORPS OF ENGINEERS, SECTION 404,
NATIONWIDE PERMIT #3. COPIES OF ALL PERMITS WILL REMAIN AVAILABLE AT THE
PROJECT SITE THROUGHOUT THE DURATION OF CONSTRUCTION.
4.1.2. NPS FURNISHED REGULATORY PERMIT: U.S. ARMY CORPS OF ENGINEERS, SECTION
404, NATIONWIDE PERMIT #3, FILE NO. POH-202-00158. SEE SPECIFICATION SECTION
01 31 00 PROJECT MANAGEMENT AND COORDINATION FOR PERMIT REQUIREMENTS
AND CONDITIONS.
4.2. COMPLIANCE WITH COUNTY AND STATE PERMITS
4.2.1. CONTRACTOR IS RESPONSIBLE FOR ALL PERMIT AND LICENSE FEES, ACQUISITION OF
AND COMPLIANCE WITH ANY RELEVANT COUNTY OR STATE PERMITS AS NEEDED FOR
THE PROPOSED CONSTRUCTION ACTIVITIES.
4.2.2. NPS FURNISHED STATE PERMIT: STATE OF HAWAII, CLEAN WATER BRANCH, SECTION
401, BLANKET APPROVAL. SEE SPECIFICATION SECTION 01 31 00 PROJECT
MANAGEMENT AND COORDINATION FOR PERMIT REQUIREMENTS AND CONDITIONS.
4.2.3. CONTRACTOR FURNISHED PERMITS: INCLUDING, BUT NOT LIMITED TO, TRAFFIC AND
ENCROACHMENT PERMITS RELATED TO THE DELIVERY AND HAULING OF
CONSTRUCTION EQUIPMENT AND MATERIALS, AND TRAFFIC CONTROL MEASURES
(TRAFFIC SAFETY PLAN). THE CONTRACTOR MUST FOLLOW ALL PERTINENT
REQUIREMENTS FOR HAULING LARGE VEHICLES OR EQUIPMENT TO THE PROJECT
SITE. IF A COUNTY, STATE, OR CITY ROAD IS USED FOR HEAVY EQUIPMENT
TRANSPORT OR WIDE LOADS, PERTINENT CLEARANCES MUST BE OBTAINED
5. ENVIRONMENTAL
5.1. AIR QUALITY AND CONSTRUCTION NOISE RESTRICTIONS
5.1.1. SEE PROJECT SPECIFICATION SECTION 01 57 19.12 - NOISE AND ACOUSTICS
MANAGEMENT FOR NOISE RESTRICTION LEVELS AND OTHER REQUIREMENTS.
5.1.2. THE CONTRACTOR AT HIS/HER OWN EXPENSE SHALL KEEP THE PROJECT AREA AND
SURROUNDING AREAS FREE FROM DUST NUISANCE. THE WORK SHALL BE IN
CONFORMANCE WITH THE AIR POLLUTION STANDARDS AND REGULATIONS OF THE
STATE OF HAWAII, DEPARTMENT OF HEALTH. THE STATE SHALL INDICATE
SUPPLEMENTARY MEASURES IF REQUIRED.
5.1.3. THE CONTRACTOR SHALL IMPLEMENT MEASURES TO REDUCE CONSTRUCTION NOISE
INCLUDING: ENSURING THAT ALL CONSTRUCTION EQUIPMENT HAS SOUND-CONTROL
DEVICES AT LEAST AS EFFECTIVE AS THOSE ORIGINALLY SUPPLIED BY THE
MANUFACTURER AND THAT NO EQUIPMENT WITH AN UNMUFFLED EXHAUST IS
OPERATED; LIMITING CONSTRUCTION ACTIVITIES TO SPECIFIED TIMES; AND
PROHIBITING UNNECESSARY WARMING UP, IDLING, OR ENGINE REVVING OF GAS OR
DIESEL POWERED EQUIPMENT OR VEHICLES.
5.1.4. THE CONTRACTOR SHALL REFER TO CHAPTER 46 PUBLIC HEALTH REGULATIONS,
DEPARTMENT OF HEALTH, STATE OF HAWAII, "COMMUNITY NOISE CONTROL" IN
WHICH MAXIMUM ALLOWABLE NOISE LEVELS HAVE BEEN SET. IF THE
CONSTRUCTION ACTIVITIES FOR THIS PROJECT WILL EXCEED THE ALLOWABLE
NOISE LEVELS, THE CONTRACTOR WILL BE REQUIRED TO OBTAIN A PERMIT FROM
THE DIRECTOR OF PUBLIC HEALTH. THE CONTRACTOR SHALL OBTAIN A COPY OF
CHAPTER 46 AND BECOME FAMILIAR WITH THE NOISE LEVEL RESTRICTIONS AND THE
PROCEDURES FOR OBTAINING A PERMIT FOR CONSTRUCTION ACTIVITIES.
APPLICATION AND INFORMATION ON VARIANCES ARE AVAILABLE AT THE
ENVIRONMENTAL HEALTH SERVICES DIVISION, 2827 WAIMANO HOME ROAD, HALE OLA
BUILDING, HONOLULU, HI 96782 OR BY TELEPHONE (808) 586-4304.
5.2. CONTAMINATION PREVENTION RESTRICTIONS
5.2.1. THE CONTRACTOR SHALL TAKE PREVENTATIVE MEASURES TO AVOID ANY SPILLS OR
LEAKS ON THE SITE FROM PETROLEUM PRODUCTS. THE CONTRACTOR SHALL
PREPARE A SPILL PREVENTION AND RESPONSE PLAN THAT WILL BE APPROVED BY
THE CONTRACTING OFFICER AND CONTRACTOR'S ENVIRONMENTAL MONITOR, AS
WELL AS LEAD AGENCIES. THIS SHALL BE IMPLEMENTED AND ADHERED TO BY THE
CONTRACTOR. AT A MINIMUM, THIS PLAN SHALL REQUIRE THAT STAGING, STORAGE,
AND REFUELING AREAS AND ANY EQUIPMENT REPAIR OR SIMILAR ACTIVITY TAKE
PLACE WHEN EQUIPMENT IS AT LEAST 100-FEET FROM ANY HARBOR, WETLAND,
DITCH, POND, OR FENCED SENSITIVE AREA. REFUELING SHALL ONLY OCCUR IN
AREAS APPROVED BY THE CONTRACTING OFFICER OR CONTRACTOR'S
ENVIRONMENTAL MONITOR.
5.2.2. STAGING AND STORAGE AREAS SHALL OCCUR ONLY IN DESIGNATED AREAS: ANY
STAGING OR STORAGE IN WETLANDS OR OTHER SENSITIVE HABITATS WILL REQUIRE
PRIOR APPROVAL FROM THE CONTRACTING OFFICER OR CONTRACTOR'S
ENVIRONMENTAL MONITOR.
5.2.3. PROTECTIVE TARPS SHALL BE USED DURING REFUELING OR EQUIPMENT REPAIR.
THE CONTRACTOR SHALL INSPECT AND FULLY CLEAN UP ANY SUCH LEAKS OR SPILLS
THAT OCCUR ON THE SITE.
5.2.4. ANY EQUIPMENT THAT HAS BEEN PREVIOUSLY USED IN AN AREA KNOWN TO CONTAIN
INVASIVE SPECIES SHALL BE SANITIZED PRIOR TO ITS USE AND CLEANED AFTER USE
BEFORE BEING MOVED TO A NEW LOCATION.
5.2.5. CONTRACTOR SHALL CONDUCT ROUTINE INSPECTIONS OF ALL VESSELS FOR THE
PRESENCE OF NON-NATIVE SPECIES GROWING ON THE HULL (AND BILGE) OF THE
VESSEL PRIOR TO CONDUCTING WORK IN A DIFFERENT AREA OF OPERATION.
5.2.6. THE CONTRACTOR SHALL MONITOR FOR FUEL AND OIL LEAKS FROM THEIR VESSELS.
IF THE CONTRACTOR PLANS TO BE AWAY FROM THE JOBSITE FOR A PERIOD OF
GREATER THAN 48 HOURS, CONTRACTOR SHALL PULL THEIR BOATS FROM THE
WATER, OR RELOCATE VESSELS OFFSITE, TO REDUCE THE CHANCE OF FUEL SPILLS
ONSITE.
5.3. CULTURAL RESOURCE RESTRICTIONS
5.3.1. IF ANY ITEMS OF POTENTIAL CULTURAL OR ARCHEOLOGICAL SIGNIFICANCE ARE
ENCOUNTERED DURING EXCAVATION OPERATIONS, CONSTRUCTION WITHIN THIS
AREA SHALL BE HALTED IMMEDIATELY, AND THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER.
5.3.2. PURSUANT TO CHAPTER 6E, HAWAII REVISED STATUTES, IN THE EVENT ANY
ARTIFACTS OR HUMAN REMAINS ARE UNCOVERED DURING CONSTRUCTION
OPERATIONS, THE CONTRACTOR SHALL IMMEDIATELY SUSPEND WORK AND NOTIFY
THE HONOLULU POLICE DEPARTMENT, THE STATE DEPARTMENT OF LAND AND
NATURAL RESOURCES - HISTORIC PRESERVATION DIVISION AT 1-808-692-8015. IN
ADDITION, FOR NON-CITY PROJECTS, THE CONTRACTOR SHALL INFORM THE CIVIL
ENGINEERING BRANCH, DEPARTMENT OF PLANNING AND PERMITTING AT
1-808-768-8084.
5.4. WATER POLLUTION AND RESTRICTIONS
5.4.1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE WITH THE
APPLICABLE PROVISIONS OF THE WATER QUALITY AND WATER POLLUTION CONTROL
STANDARDS CONTAINED IN THE HAWAII ADMINISTRATIVE RULES, TITLE 11, CHAPTER
54, "WATER QUALITY STANDARDS" AND TITLE 11, CHAPTER 55, "WATER POLLUTION
CONTROL", AS WELL AS CHAPTER 14 OF THE REVISED ORDINANCES OF HONOLULU
1990, AS AMENDED. BEST MANAGEMENT PRACTICES SHALL BE EMPLOYED AT ALL
TIMES DURING CONSTRUCTION.
5.4.2. IN ACCORDANCE WITH STATE LAW, ALL DISCHARGES RELATED TO PROJECT
CONSTRUCTION OR OPERATIONS ARE REQUIRED TO COMPLY WITH STATE WATER
QUALITY STANDARDS (HAWAII ADMINISTRATIVE RULES, CHAPTER 11-54). BEST
MANAGEMENT PRACTICES SHALL BE USED TO MINIMIZE OR PREVENT THE DISCHARGE
OF SEDIMENT, DEBRIS, AND OTHER POLLUTANTS TO STATE WATERS. PERMIT
COVERAGE IS AVAILABLE FROM THE DEPARTMENT OF HEALTH, CLEAN WATER
BRANCH AT HTTP://HEALTH.HAWAII.GOV/CWB. THE OWNER / DEVELOPER /
CONTRACTOR IS RESPONSIBLE FOR OBTAINING OTHER FEDERAL, STATE, OR LOCAL
AUTHORIZATIONS AS REQUIRED BY LAW.
6. BEST MANAGEMENT PRACTICES (WORK AROUND WATER)
A. MEASURES INDICATED ON PLANS TO WASTE WATER AND OTHER POLLUTANTS SHALL BE IN PLACE / INSTALLED BEFORE ANY DEMOLITION OR CONSTRUCTION IS INITIATED (I.E. PILE OR DOCK
REMOVAL). THESE MEASURES SHALL BE PROPERLY CONSTRUCTED AND MAINTAINED
THROUGHOUT THE CONSTRUCTION PERIOD. REFER TO THESE DRAWINGS AND "CITY AND
COUNTY OF HONOLULU STORMWATER BEST MANAGEMENT PRACTICE MANUAL, CONSTRUCTION,"
NOVEMBER 2011, FOUND AT ( https://www.honolulu.gov/rep/site/dfmswq/library/BMP_manual_2011-11.pdf )
B. CONTRACTOR SHALL ADHERE TO BEST MANAGEMENT PRACTICES PRESCRIBED IN THE PROJECT PERMITS, SPECIFICATIONS, AND ESPECIALLY THE PROVISIONS OF "NS-14 MATERIAL OVER WATER" AND "NS-15 DEMOLITION ADJACENT TO WATER" AS PRESCRIBED IN THE "CITY AND COUNTY OF
HONOLULU STORMWATER BEST MANAGEMENT PRACTICE MANUAL, CONSTRUCTION," NOVEMBER
2011, FOUND AT ( https://www.honolulu.gov/rep/site/dfmswq/library/BMP_manual_2011-11.pdf ).
C. CONSTANT VIGILANCE SHALL BE KEPT FOR THE PRESENCE OF ESA-LISTED MARINE SPECIES DURING ALL ASPECTS OF THE PROPOSED ACTION, PARTICULARLY IN-WATER ACTIVITIES SUCH AS
BOAT OPERATIONS, DIVING, AND DEPLOYMENT OF ANCHORS AND MOORING LINES.
6.1. THE PROJECT MANAGER SHALL DESIGNATE AN APPROPRIATE NUMBER OF COMPETENT
OBSERVERS TO SURVEY THE AREAS ADJACENT TO THE PROPOSED ACTION FOR
ESA-LISTED MARINE SPECIES.
6.2. SURVEYS SHALL BE MADE PRIOR TO THE START OF WORK EACH DAY, AND PRIOR TO
RESUMPTION OF WORK FOLLOWING ANY BREAK OF MORE THAN ONE HALF HOUR.
PERIODIC ADDITIONAL SURVEYS THROUGHOUT THE WORK DAY ARE STRONGLY
RECOMMENDED.
6.3. ALL WORK SHALL BE POSTPONED OR HALTED WHEN ESA-LISTED MARINE SPECIES ARE
WITHIN 50 YARDS OF THE PROPOSED WORK, AND SHALL ONLY BEGIN/RESUME AFTER THE
ANIMALS HAVE VOLUNTARILY DEPARTED THE AREA. IF ESA-LISTED MARINE SPECIES ARE
NOTICED WITHIN 50 YARDS AFTER WORK HAS ALREADY BEGUN, THAT WORK MAY
CONTINUE ONLY IF, IN THE BEST JUDGMENT OF THE PROJECT SUPERVISOR, THAT THERE
IS NO WAY FOR THE ACTIVITY TO ADVERSELY AFFECT THE ANIMAL(S). FOR EXAMPLE;
DIVERS PERFORMING SURVEYS OR UNDERWATER WORK WOULD LIKELY BE PERMISSIBLE,
WHEREAS OPERATION OF HEAVY EQUIPMENT IS LIKELY NOT.
6.4. SPECIAL ATTENTION WILL BE GIVEN TO VERIFY THAT NO ESA-LISTED MARINE ANIMALS ARE
IN THE AREA WHERE EQUIPMENT OR MATERIAL IS EXPECTED TO CONTACT THE
SUBSTRATE BEFORE THAT EQUIPMENT/MATERIAL MAY ENTER THE WATER. THIS INCLUDES
THE REQUIREMENT TO LIMIT ANCHORING TO SANDY AREAS WELL AWAY FROM CORAL.
6.5. ALL OBJECTS WILL BE LOWERED TO THE BOTTOM (OR INSTALLED) IN A CONTROLLED
MANNER. THIS CAN INCLUDE THE USE OF BUOYANCY CONTROLS SUCH AS LIFT BAGS, OR
THE USE OF CRANES, WINCHES, OR OTHER EQUIPMENT THAT AFFECT POSITIVE CONTROL
OVER THE RATE OF DESCENT.
6.6. IN-WATER TETHERS, AS WELL AS MOORING LINES FOR VESSELS AND MARKER BUOYS
SHALL BE KEPT TO THE MINIMUM LENGTHS NECESSARY, AND SHALL REMAIN DEPLOYED
ONLY AS LONG AS NEEDED TO PROPERLY ACCOMPLISH THE REQUIRED TASK.
6.7. WHEN PILOTING VESSELS, VESSEL OPERATORS SHALL ALTER COURSE TO REMAIN AT
LEAST 100 YARDS FROM WHALES, AND AT LEAST 50 YARDS FROM OTHER MARINE
MAMMALS AND SEA TURTLES.
6.8. REDUCE VESSEL SPEED TO 10 KNOTS OR LESS WHEN PILOTING VESSELS AT OR WITHIN
THE RANGES DESCRIBED ABOVE FROM MARINE MAMMALS AND SEA TURTLES. OPERATORS
SHALL BE PARTICULARLY VIGILANT TO WATCH FOR TURTLES AT OR NEAR THE SURFACE IN
AREAS OF KNOWN OR SUSPECTED TURTLE ACTIVITY, AND IF PRACTICABLE, REDUCE
VESSEL SPEED TO 5 KNOTS OR LESS.
6.9. IF DESPITE EFFORTS TO MAINTAIN THE DISTANCES AND SPEEDS DESCRIBED ABOVE, A
MARINE MAMMAL OR TURTLE APPROACHES THE VESSEL, PUT THE ENGINE IN NEUTRAL
UNTIL THE ANIMAL IS AT LEAST 50 FEET AWAY, AND THEN SLOWLY MOVE AWAY TO THE
PRESCRIBED DISTANCE.
6.10. MARINE MAMMALS AND SEA TURTLES SHALL NOT BE ENCIRCLED OR TRAPPED BETWEEN
MULTIPLE VESSELS OR BETWEEN VESSELS AND THE SHORE.
6.11. DO NOT ATTEMPT TO FEED, TOUCH, RIDE, OR OTHERWISE INTENTIONALLY INTERACT WITH
ANY ESA-LISTED MARINE SPECIES.
6.12. ENDANGERED SPECIES REPORTING. INCIDENTS WHERE ANY INDIVIDUALS OF GREEN SEA
TURTLE, HAWKSBILL SEA TURTLE, LOGGERHEAD SEA TURTLE, AND HAWAIIAN MONK SEAL,
LISTED BY NOAA FISHERIES AS THREATENED OR ENDANGERED UNDER THE ENDANGERED
SPECIES ACT APPEAR TO BE INJURED OR KILLED AS A RESULT OF DISCHARGES OF
DREDGED OR FILL MATERIAL INTO WATERS OF THE U.S. OR STRUCTURES OR WORK IN
NAVIGABLE WATERS OF THE U.S. AUTHORIZED BY THE ARMY CORPS NATIONWIDE PERMIT
(NWP) SHALL BE REPORTED TO NOAA FISHERIES, OFFICE OF PROTECTED RESOURCES AT
(301) 713-1401 AND THE REGULATORY OFFICE OF THE HONOLULU DISTRICT, U.S. ARMY
CORPS OF ENGINEERS AT (808) 835-4303. THE FINDER SHOULD LEAVE THE ANIMAL ALONE,
MAKE NOTE OF ANY CIRCUMSTANCES LIKELY CAUSING THE DEATH OR INJURY, NOTE THE
LOCATION AND NUMBER OF INDIVIDUALS INVOLVED AND TAKE PHOTOGRAPHS IF
POSSIBLE. ADULT ANIMALS SHOULD NOT BE DISTURBED UNLESS CIRCUMSTANCES ARISE
WHERE THEY ARE OBVIOUSLY INJURED OR KILLED BY DISCHARGE EXPOSURE OR SOME
UNNATURAL CAUSE. THE FINDER MAY BE ASKED TO CARRY OUT INSTRUCTIONS PROVIDED
BY NOAA FISHERIES, OFFICE OF PROTECTED RESOURCES, TO COLLECT SPECIMENS OR
TAKE OTHER MEASUREMENTS TO ENSURE THAT EVIDENCE INTRINSIC TO THE SPECIMEN IS
PRESERVED.
D. NO CONTAMINATION OF THE MARINE ENVIRONMENT SHALL RESULT FROM PROJECT-RELATED
ACTIVITIES.
6.12 A CONTINGENCY PLAN TO CONTROL TOXIC MATERIALS IS REQUIRED.
6.13 APPROPRIATE MATERIALS TO CONTAIN AND CLEAN POTENTIAL SPILLS SHALL BE STORED
AT THE WORK SITE, AND BE READILY AVAILABLE.
6.14 ALL PROJECT-RELATED MATERIALS AND EQUIPMENT PLACED IN THE
WATER SHALL BE FREE OF POLLUTANTS.
6.15 THE PROJECT MANAGER AND HEAVY EQUIPMENT OPERATORS SHALL PERFORM DAILY
PRE-WORK EQUIPMENT INSPECTIONS FOR CLEANLINESS AND LEAKS. ALL HEAVY EQUIPMENT
OPERATORS SHALL BE POSTPONED OR HALTED SHOULD A LEAK BE DETECTED, AND SHALL
NOT PROCEED UNTIL THE LEAK IS REPAIRED AND EQUIPMENT CLEANED.
6.16 FUELING OF LAND-BASED VEHICLES AND EQUIPMENT SHALL TAKE PLACE AT LEAST 50 FEET
AWAY FROM THE WATER, PREFERABLY OVER AN IMPERVIOUS SURFACE. FUELING OF
VESSELS SHALL BE DONE AT APPROVED FUELING FACILITIES.
6.17 TURBIDITY AND SILTATION FROM PROJECT-RELATED WORK SHALL BE MINIMIZED AND
CONTAINED THROUGH THE APPROPRIATE USE OF EROSION CONTROL PRACTICES,
EFFECTIVE SILT CONTAINMENT DEVICES, AND THE CURTAILMENT OF WORK DURING
ADVERSE WEATHER AND TIDAL/FLOW CONDITIONS.
6.18 A PLAN SHALL BE DEVELOPED TO PREVENT DEBRIS AND OTHER WASTES FROM ENTERING
OR REMAINING IN THE MARINE ENVIRONMENT DURING THE PROJECT.
7. BEST MANAGEMENT PRACTICES (WORK ON LAND)
7.1. THE CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES PRIOR TO START OF
PROJECT AND IT SHALL BE MAINTAINED UNTIL THE COMPLETION OF THE PROJECT AS
FOLLOWS:
A. TEMPORARY STABILIZED CONSTRUCTION ENTRANCE
B. CONCRETE WASHOUT AREA
C. FILTER SOCK AND/OR SILT FENCES AT WORK AREA PERIMETERS
D. INLET GUARD PROTECTION AT EXISTING CATCH BASINS
7.2. MEASURES INDICATED ON PLANS TO CONTROL EROSION AND OTHER POLLUTANTS SHALL
BE IN PLACE/INSTALLED BEFORE ANY CONSTRUCTION/TRENCHING IS INITIATED (i.e. INLET
PROTECTION). THESE MEASURES SHALL BE PROPERLY CONSTRUCTED AND MAINTAINED
THROUGHOUT THE CONSTRUCTION PERIOD. REFER TO "CITY AND COUNTY OF HONOLULU
STORMWATER BEST MANAGEMENT PRACTICE MANUAL, CONSTRUCTION," NOVEMBER 2011,
FOUND AT ( https://www.honolulu.gov/rep/site/dfmswq/library/BMP_manual_2011-11.pdf ).
7.3. ALL CONTROL MEASURES SHALL BE PERIODICALLY INSPECTED, WEEKLY AND AFTER EACH
RAIN EVENT AT THE MINIMUM. ANY EROSION CONTROL MEASURE NOT INSTALLED
PROPERLY SHALL BE IMMEDIATELY REPAIRED.
7.4. GOOD HOUSEKEEPING SHALL BE UTILIZED TO ENSURE PROTECTION OF ROADWAYS FROM
MUD, DIRT AND DEBRIS.
7.5. ENTRANCE FOR INGRESS/EGRESS OF CONSTRUCTION STAGING AND OPERATIONS AREAS
SHALL BE PROVIDED WITH A MINIMUM 20' LONG x 12' WIDE TRACKOUT CONTROL MAT.
7.6. THE CONTRACTOR SHALL ENSURE THAT ALL TIRES OF CONSTRUCTION VEHICLES ARE
SUFFICIENTLY CLEANED OFF SO THAT DIRT OR DEBRIS IS NOT TRACKED OFF NON-PAVED
CONSTRUCTION AREAS. WASHING OF TIRES WITH WATER WILL NOT BE ACCEPTABLE
UNLESS THE RUNOFF IS CONTAINED AND DOES NOT ENTER THE STORM DRAIN SYSTEM.
7.7. NO STOCKPILING OF EXCAVATED TRENCH MATERIALS ALLOWED WITHIN THE ROADWAY
PAVEMENT AREA.
7.8. DURING CONSTRUCTION, DUST POLLUTION SHALL BE KEPT TO A MINIMUM.
7.9. INSTALL SILT FENCES AROUND CONSTRUCTION STAGING AND OPERATIONS AREAS AS
REQUIRED TO PREVENT SILT RUNOFF.
7.10. INSTALL TEMPORARY SEDIMENT CONTROL FILTERS AT CATCH BASINS AND DRAIN INLETS
WHICH MAY RECEIVE RUNOFF FROM THE CONSTRUCTION WORK.
7.11. THE CONTRACTOR SHALL REMOVE SEDIMENT FILTERS AND BARRIERS DURING ABOVE
AVERAGE RAINFALL EVENTS AND REPLACE THEM AFTER THE EVENT HAS PASSED.
7.12. ANY DIRT OR GRASSED AREA DISTURBED SHALL BE RESTORED BY SEEDED HYDRO-MULCH.
7.13. TEMPORARY EROSION CONTROLS SHALL NOT BE REMOVED BEFORE PERMANENT
CONTROLS ARE IN PLACE AND ESTABLISHED. FILTERS AND BARRIERS SHALL BE REMOVED
WHEN NO LONGER REQUIRED, AND ONLY AFTER THE DISTURBED WORK AREA IS
COMPLETELY STABILIZED.
7.14. AT THE END OF CONSTRUCTION, CONTRACTOR SHALL INSPECT ALL CATCH BASINS, DRAIN
INLETS, AND DRAIN MANHOLES LOCATED NEAR THE PROJECT SITE. ANY ACCUMULATED
SEDIMENT AND DEBRIS FOUND IN THE STORM DRAIN STRUCTURES SHALL BE REMOVED.
FLUSHING INTO THE DRAIN STRUCTURES IS PROHIBITED.
GENERAL NOTES
AutoCAD SHX Text
RMS
AutoCAD SHX Text
PS
AutoCAD SHX Text
CL
AutoCAD SHX Text G1
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
A/E FIRM
AutoCAD SHX Text
PRIME:
AutoCAD SHX Text
KAULA AE, LLC HONOLULU, HI
AutoCAD SHX Text
SUBCONTRACTOR:
AutoCAD SHX Text
GHD INC. SAN FRANCISCO, CA
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PKG.
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
REPLACE SHORESIDE DOCK AND MOORING SYSTEM
AutoCAD SHX Text
PEARL HARBOR NATIONAL MEMORIAL
AutoCAD SHX Text
AutoCAD SHX Text 149,321
AutoCAD SHX Text
AutoCAD SHX Text
MAR 2021
AutoCAD SHX Text S4765
AutoCAD SHX Text 12/31/22
AutoCAD SHX Text No.
AutoCAD SHX Text Exp.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
A
GEOTECHNICAL BORINGS
RMS
AutoCAD SHX Text
PS
AutoCAD SHX Text
CL
AutoCAD SHX Text G2
AutoCAD SHX Text
AutoCAD SHX Text
GEOTECHNICAL BORINGS
AutoCAD SHX Text
A/E FIRM
AutoCAD SHX Text
PRIME:
AutoCAD SHX Text
KAULA AE, LLC HONOLULU, HI
AutoCAD SHX Text
SUBCONTRACTOR:
AutoCAD SHX Text
GHD INC. SAN FRANCISCO, CA
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PKG.
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
REPLACE SHORESIDE DOCK AND MOORING SYSTEM
AutoCAD SHX Text
PEARL HARBOR NATIONAL MEMORIAL
AutoCAD SHX Text
AutoCAD SHX Text 149,321
AutoCAD SHX Text
AutoCAD SHX Text
MAR 2021
AutoCAD SHX Text S4765
AutoCAD SHX Text 12/31/22
AutoCAD SHX Text No.
AutoCAD SHX Text Exp.
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
STAGING AREA NOTES
1. SECURITY PASSES FOR ACCESS TO NAVY PROPERTY SHALL BE IN
ACCORDANCE WITH SPECIFICATION SECTION 01 11 41 .
2. THE ALPHA LANDING ON FORD ISLAND OR THE KILO 10-11 PIER ARE
POTENTIAL SITES TO TEMPORARILY MOOR THE OLD OR NEW
FLOATING DOCK PENDING APPROVAL OF NAVY AND NPS.
PEARL HARBOR VISITOR CENTER
TRUE NORTH
NAVY BOAT LAUNCH
STAGING AREA
ACCESS ROUTE
ACCESS ROUTE
(OPTION 2)
BOAT LAUNCH RAMP
STAGING AREA
(SEE SHEET G5)
KILO 10-11 PIER
ALPHA LANDING
PROJECT SITE / DOCK
ACCESS ROUTE
(OPTION 1)
ACCESS ROUTE
(OPTION 3)
PROJECT SITE
STAGING AREA
(SEE SHEET G4)
AutoCAD SHX Text
BOUY
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LAKE ERIE STREET
AutoCAD SHX Text
PIERCE STREET
AutoCAD SHX Text
MOORE STREET
AutoCAD SHX Text
SPRUANCE STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S1111
AutoCAD SHX Text S1109
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 67A
AutoCAD SHX Text
AutoCAD SHX Text
ARIZONA STREET
AutoCAD SHX Text
KAMEHAMEHA HIGHWAY
AutoCAD SHX Text
AVOGET STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LEXINGTON BOULEVARD
AutoCAD SHX Text
LISCOME BAY
AutoCAD SHX Text
GANNET STREET
AutoCAD SHX Text
WASP BOULEVARD
AutoCAD SHX Text
RANGER LOOP
AutoCAD SHX Text
SAN JACINTO STREET
AutoCAD SHX Text
WASP BOULEVARD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TANKS
AutoCAD SHX Text
AutoCAD SHX Text 26A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S84
AutoCAD SHX Text S172
AutoCAD SHX Text S169
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S255
AutoCAD SHX Text S236
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S258
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S11
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S145
AutoCAD SHX Text
AutoCAD SHX Text S72
AutoCAD SHX Text S235
AutoCAD SHX Text S168
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S286
AutoCAD SHX Text
AutoCAD SHX Text S285
AutoCAD SHX Text
AutoCAD SHX Text 464A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
DRIVE WAY
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
DRIVEWAY
AutoCAD SHX Text
HAMMONDS PORT STREET
AutoCAD SHX Text
ABELE STREET
AutoCAD SHX Text
COE STREET
AutoCAD SHX Text
ULITHI ROAD
AutoCAD SHX Text
ENTERPRISE STREET
AutoCAD SHX Text
FRANKLIN AVENUE
AutoCAD SHX Text
JARVIS STREET
AutoCAD SHX Text
QUINCY AVENUE
AutoCAD SHX Text
LUAPELE ROAD
AutoCAD SHX Text
PIERCE STREET
AutoCAD SHX Text
SAINT LO AVENUE
AutoCAD SHX Text
OKLAHOMA ST.
AutoCAD SHX Text
NORTH ROAD
AutoCAD SHX Text
HURT AVENUE
AutoCAD SHX Text
KITTYHAWK STREET
AutoCAD SHX Text
KAMEHAMEHA HIGHWAY
AutoCAD SHX Text
LANGLEY AVENUE
AutoCAD SHX Text
HUNTER STREET
AutoCAD SHX Text
SHANE STREET
AutoCAD SHX Text
KUAHUA AVENUE
AutoCAD SHX Text
NEOSHO AVENUE
AutoCAD SHX Text
MAKALAPA DRIVE
AutoCAD SHX Text
CRAIG STREET
AutoCAD SHX Text H1
AutoCAD SHX Text
DEALEY CIRCLE
AutoCAD SHX Text
ASTORIA AVENUE
AutoCAD SHX Text
HORNET AVENUE
AutoCAD SHX Text
COWPENS STREET
AutoCAD SHX Text
CROMWELL CIRCLE
AutoCAD SHX Text
ATLANTA STREET
AutoCAD SHX Text
ESSEX STREET
AutoCAD SHX Text
NIMITZ STREET
AutoCAD SHX Text
HURT AVENUE
AutoCAD SHX Text
NORTH ROAD
AutoCAD SHX Text
LEXINGTON BOULEVARD
AutoCAD SHX Text
NORTHHAMPTON AVENUE
AutoCAD SHX Text
PIERCE STREET
AutoCAD SHX Text
NECHES AVENUE
AutoCAD SHX Text
OAKLEY ROAD
AutoCAD SHX Text
SAN JUAN AVENUE
AutoCAD SHX Text
NORTH ROAD
AutoCAD SHX Text
INDEPENDENCE STREET
AutoCAD SHX Text
GILMORE STREET
AutoCAD SHX Text
BOLE STREET
AutoCAD SHX Text H1
AutoCAD SHX Text
EDGE STREET
AutoCAD SHX Text
KUAHUA AVENUE
AutoCAD SHX Text
UTAH STREET
AutoCAD SHX Text
CLARK STREET
AutoCAD SHX Text
GAFFNEY STREET
AutoCAD SHX Text
ULITHI ROAD
AutoCAD SHX Text
HORNET AVENUE
AutoCAD SHX Text
VINCENNES AVENUE
AutoCAD SHX Text
POKOMOKE STREET
AutoCAD SHX Text
SIMMS STREET
AutoCAD SHX Text
BLOCK ISLAND STREET
AutoCAD SHX Text
MORTON STREET
AutoCAD SHX Text
HALAWA DRIVE
AutoCAD SHX Text
INTREPID BOULEVARD
AutoCAD SHX Text
DOWNES STREET
AutoCAD SHX Text
HALAWA DRIVE
AutoCAD SHX Text
MAKALAPA DRIVE
AutoCAD SHX Text
MAKALAPA DR
AutoCAD SHX Text S1180
AutoCAD SHX Text S664
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S754
AutoCAD SHX Text
AutoCAD SHX Text S556
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .