About this opportunity

This solicitation seeks proposals for perimeter vehicle denial barrier construction services at Travis Air Force Base in California. The contractor will be responsible for providing all professional services, permits, equipment, labor, materials, and ancillary items necessary to construct cable reinforcement for an existing perimeter fence in accordance with unified facilities criteria manuals and the attached statement of work. Proposals are due no later than October 24, 2019 and shall be evaluated based on technical qualifications, past performance, and price. Interested vendors must attend the optional site visit by October 17, 2019 and direct any questions to the point of contact by that same date.

The requirement has been set aside for total small business and has a NAICS code of 238990 for specialty trade construction work. The estimated value is between $1 million to $5 million to be awarded as a firm-fixed-price contract. The period of performance is 180 calendar days starting from the notice to proceed, which will be issued after award. Work will be performed at Travis Air Force Base located at 690 Airmen Drive in Fairfield, California.

Notice text

4 versions

Update #4 · Latest ·

The purpose amendment two is to change the NAICS Code from 236220 Commercial and Institutional Building Construction to 238990 All Other Specialty Trade Contractors. The due date for proposals in now 24 October 2019 at 4 PM Pacific. All other terms and conditions remain unchanged.

Update #3 ·

All questions and RFI's for this solicitation are due by 4:00pm Pacific 4 October 2019.


The site visit for this project has been rescheduled to 25 September 2019 at 1 pm PST.  Please contact TSgt Wendell Gibson if you have any questions at wendell.gibson@us.af.mil. 

The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to construct cable reinforcement for the existing perimeter fence per UFC 4-022-01, UFC 4-022-02, and UFC 4-022-03. See attached site maps, design information, and environmental requirements in accordance with the Statement of Work (SOW) dated 4 June 2019 at Travis AFB and such other items or details required by the project plans, standard specifications, and special provisions. Performance of the awarded contract will start after the contract receives the notice to proceed (NTP) and will be 180 days long.  Attachments five and six are too large to upload to FBO.  Any interested vendors should contact TSgt Wendell Gibson via email to be sent these doccuments.  Thanks

Update #2 ·

The site visit for this project has been rescheduled to 25 September 2019 at 1 pm PST.  Please contact TSgt Wendell Gibson if you have any questions at wendell.gibson@us.af.mil. 

The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to construct cable reinforcement for the existing perimeter fence per UFC 4-022-01, UFC 4-022-02, and UFC 4-022-03. See attached site maps, design information, and environmental requirements in accordance with the Statement of Work (SOW) dated 4 June 2019 at Travis AFB and such other items or details required by the project plans, standard specifications, and special provisions. Performance of the awarded contract will start after the contract receives the notice to proceed (NTP) and will be 180 days long.  Attachments five and six are too large to upload to FBO.  Any interested vendors should contact TSgt Wendell Gibson via email to be sent these doccuments.  Thanks

Update #1 ·

The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to construct cable reinforcement for the existing perimeter fence per UFC 4-022-01, UFC 4-022-02, and UFC 4-022-03. See attached site maps, design information, and environmental requirements in accordance with the Statement of Work (SOW) dated 4 June 2019 at Travis AFB and such other items or details required by the project plans, standard specifications, and special provisions. Performance of the awarded contract will start after the contract receives the notice to proceed (NTP) and will be 180 days long.  Attachments five and six are too large to upload to FBO.  Any interested vendors should contact TSgt Wendell Gibson via email to be sent these doccuments.  Thanks