Paints and Floors work for govt owned housing

Closed Solicitation Posted

Solicitation number
31125PR240000138
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Buzzards Bay, Massachusetts 02542, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Coast Guard is seeking a contractor to provide painting and floor maintenance services for 8 government-owned housing units located on the USCG Base Cape Cod in Buzzards Bay, MA. The scope of work requires the contractor to prepare and paint interior surfaces such as walls, ceilings, doors, trim, and basement areas. The contractor will also be responsible for refinishing the existing hardwood floors in the units. The government will evaluate offers based on price and other price-related factors, with the intent to make an award without discussions. Proposals are due by April 25, 2024, and the performance period requires the contractor to commence work immediately upon award and complete the work by July 1, 2024.

This solicitation is set aside for small businesses under NAICS code 238320 - Painting/Wall Covering Contractors, with a size standard of $20.0 million. The government has not provided any information about potential incumbents or current contractors. The total value of the contract is not specified, but the government has requested pricing on a lump sum basis for the 8 separate housing units. The place of performance is the USCG Base Cape Cod in Buzzards Bay, MA.

Notice text

3 versions

Update #3 · Latest ·

Questions asked: Time frame for completion? - 24-30 days. Weekly Pay Possible? - No, not paid until fully complete and invoice has been submitted. Will all 8 unts be availabe at the same time? Yes. What is the actual closing date? - 4/28 at 12:00 EST. Are pictures or plans available? No. 

The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units:

SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted.

Exterior doors (aluminum): White latex paint

Interior doors: Eggshell

Walls: Eggshell

Trim: Eggshell

Ceiling: Flat ceiling white

Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint).

**SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS 

Update #2 ·

Questions asked: Time frame for completion? - 24-30 days. Weeky Pay Possible? - No, not paid until fully complete and invoice has been submitted. Will all 8 unts be availabe at the same time? Yes. What is the actual closing date? - 4/28 at 12:00 EST.

The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units:

SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted.

Exterior doors (aluminum): White latex paint

Interior doors: Eggshell

Walls: Eggshell

Trim: Eggshell

Ceiling: Flat ceiling white

Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint).

**SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS 

Update #1 ·

The Contractor shall provide all labor, equipment, materials (including paint), transportation, supervision, and disposal necessary to complete the paint and floor maintenance in the below listed units:

SCOPE OF WORK: Work consists of preparing and painting, surfaces (i.e., walls, ceilings, doors, closets, kitchen, trim, and molding, on interior surfaces of the housing units, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors. All exterior storm doors and all entrance doors and trim shall also be painted. Garage entry doors and walls in Flat Top units finished garages shall also be painted.

Exterior doors (aluminum): White latex paint

Interior doors: Eggshell

Walls: Eggshell

Trim: Eggshell

Ceiling: Flat ceiling white

Basement: The basements are to be painted to include all previously painted surfaces in basement. Walls shall be painted white with multicide additive, the deck (floor), metal poles, and bulkhead walls and steps shall be painted with gray (multicide added to paint).

**SEE SCOPE OF WORK (SOW) FOR FULL DETAILS / REQUIREMENTS 

Files

File Type Posted
Buzzards Bay MA Painting Questions.docx DOCX document
PF SOW Mar 2024_1st batch.pdf PDF
CONSTRUCTION WAGES.txt TXT text file
SF18 REQUEST FOR QUOTATION - PAINTS AND FLOORS_2024.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
MA-FWS great meadows NWR-repair walls PA NAICS 238320 — Total Small Business
Paint Services in support of the HC-144 Aircraft. Elizabeth City, North Carolina 27909, United States · NAICS 488190 Coast Guard No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity