Nrel - construction services: field test laboratory (ftlb) microbial energetic laboratory

Closed Solicitation Posted

Solicitation number
RFP-2023-23076
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Golden, Colorado 80401, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The National Renewable Energy Laboratory (NREL) is soliciting proposals for construction services for the Field Test Laboratory Microbial Energetic Laboratory at the NREL South Table Mountain campus. The project involves various tasks including site walk, technical questions, proposal submission, construction, and installation of equipment. The proposal submission deadline has been extended to November 10, 2023.

List of services and products to be provided:

  1. Construction services for the Field Test Laboratory Microbial Energetic Laboratory.
  2. Site walk.
  3. Responding to technical questions.
  4. Proposal submission.
  5. Construction and installation of equipment.
  6. Coordination with NREL for project requirements and specifications.
  7. Compliance with construction and safety standards.
  8. Provision of project schedule and management team resumes.
  9. Use of NREL's Procore licenses for project software.
  10. Compliance with NREL's subcontractor safety manager requirements.
  11. Compliance with NREL's construction and demolition requirements.
  12. Compliance with NREL's testing and inspection requirements for welding and brazing.
  13. Installation of specified equipment and materials, including under-counter refrigerators, rubber flooring, and rubber base.
  14. Provision of traffic and pedestrian control during construction.
  15. Provision of warranty for the project following substantial completion.

Notice text

6 versions

Update #6 · Latest ·

Construction Services needed at NREL (Amended See Attachments).  This project requires the successful awardee to completely renovate and expand approximately 3000 sq. ft of laboratory spaces and some associated support spaces in the Fuel Test Laboratory Building (FTLB) at the National Renewable Energy Laboratory (NREL) located in Golden, Colorado. The scope includes demolition and space reconfiguration, coordinating with NREL for asbestos removal from existing chemical hoods, providing new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment and electrical installations for lighting and equipment.

The laboratory facilities support microbial bioenergetics research within the Biosciences Center that will strategically position Biochemical and Biophysical characterizations in adjacent areas to better coordinate generation of redox enzymes, strains development and the analytical capabilities in a safe manner. 

The work effort also requires removal of casework, chemical hoods (including coordinating removal of asbestos containing hoods) interior walls, HVAC equipment, plumbing, piping, electrical, fire, etc. and reconstructing the laboratory areas included in FTLB 173, 174, 175, 176, 178 and fan coil units in the neighboring office area, including all scope shown on the drawings and in the project specifications.

Important Dates:

9/20/2023 - Intent to Propose Due

10/16/2023 - Technical Questions Due - in acccordance with the attached Amendment 2

11/15/2023 - Proposals Submission Deadline - in accordance with the attached Amendment 5; Please note Amendment 5 is quite detailed and contains important information other than the extension Deadline.

Please review attachments to the herein posting for further details.

Additional attachments can be found at https://app.box.com/s/83zltcveg4m3g0rje3mrjwotcdghjbhs

Update #5 ·

Construction Services needed at NREL (Amended See Attachments).  This project requires the successful awardee to completely renovate and expand approximately 3000 sq. ft of laboratory spaces and some associated support spaces in the Fuel Test Laboratory Building (FTLB) at the National Renewable Energy Laboratory (NREL) located in Golden, Colorado. The scope includes demolition and space reconfiguration, coordinating with NREL for asbestos removal from existing chemical hoods, providing new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment and electrical installations for lighting and equipment.

The laboratory facilities support microbial bioenergetics research within the Biosciences Center that will strategically position Biochemical and Biophysical characterizations in adjacent areas to better coordinate generation of redox enzymes, strains development and the analytical capabilities in a safe manner. 

The work effort also requires removal of casework, chemical hoods (including coordinating removal of asbestos containing hoods) interior walls, HVAC equipment, plumbing, piping, electrical, fire, etc. and reconstructing the laboratory areas included in FTLB 173, 174, 175, 176, 178 and fan coil units in the neighboring office area, including all scope shown on the drawings and in the project specifications.

Important Dates:

9/20/2023 - Intent to Propose Due

10/16/2023 - Technical Questions Due - in acccordance with the attached Amendment 2

11/10/2023 - Proposals Submission Deadline - in accordance with the attached Amendment 4; Please note Amendment 4 is quite detailed and contains important information other than the extension Deadline.

Please review attachments to the herein posting for further details.

Additional attachments can be found at https://app.box.com/s/83zltcveg4m3g0rje3mrjwotcdghjbhs

Update #4 ·

Construction Services needed at NREL (Amended See Attachments).  This project requires the successful awardee to completely renovate and expand approximately 3000 sq. ft of laboratory spaces and some associated support spaces in the Fuel Test Laboratory Building (FTLB) at the National Renewable Energy Laboratory (NREL) located in Golden, Colorado. The scope includes demolition and space reconfiguration, coordinating with NREL for asbestos removal from existing chemical hoods, providing new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment and electrical installations for lighting and equipment.

The laboratory facilities support microbial bioenergetics research within the Biosciences Center that will strategically position Biochemical and Biophysical characterizations in adjacent areas to better coordinate generation of redox enzymes, strains development and the analytical capabilities in a safe manner. 

The work effort also requires removal of casework, chemical hoods (including coordinating removal of asbestos containing hoods) interior walls, HVAC equipment, plumbing, piping, electrical, fire, etc. and reconstructing the laboratory areas included in FTLB 173, 174, 175, 176, 178 and fan coil units in the neighboring office area, including all scope shown on the drawings and in the project specifications.

Important Dates:

9/20/2023 - Intent to Propose Due

10/16/2023 - Technical Questions Due - in acccordance with the attached Amendment 2

11/3/2023 - Proposals Submission Deadline - in accordance with the attached Amendment 3

Please review attachments below for further details.

Other attachments can be found at https://app.box.com/s/83zltcveg4m3g0rje3mrjwotcdghjbhs

Update #3 ·

Construction Services needed at NREL (Amended See Attachments).  This project requires the successful awardee to completely renovate and expand approximately 3000 sq. ft of laboratory spaces and some associated support spaces in the Fuel Test Laboratory Building (FTLB) at the National Renewable Energy Laboratory (NREL) located in Golden, Colorado. The scope includes demolition and space reconfiguration, coordinating with NREL for asbestos removal from existing chemical hoods, providing new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment and electrical installations for lighting and equipment.

The laboratory facilities support microbial bioenergetics research within the Biosciences Center that will strategically position Biochemical and Biophysical characterizations in adjacent areas to better coordinate generation of redox enzymes, strains development and the analytical capabilities in a safe manner. 

The work effort also requires removal of casework, chemical hoods (including coordinating removal of asbestos containing hoods) interior walls, HVAC equipment, plumbing, piping, electrical, fire, etc. and reconstructing the laboratory areas included in FTLB 173, 174, 175, 176, 178 and fan coil units in the neighboring office area, including all scope shown on the drawings and in the project specifications.

Important Dates:

9/20/2023 - Intent to Propose Due

10/16/2023 - Technical Questions Due - in acccordance with the attached Amendment 2

10/30/2023 - Proposals Submission Deadline - in accordance with the attached Amendment 2

Please review attachments below for further details.

Other attachments can be found at https://app.box.com/s/83zltcveg4m3g0rje3mrjwotcdghjbhs

Update #2 ·

Construction Services needed at the National Renewable Energy Laboratory (NREL) (Amended See Attachments).  This project requires the successful awardee to completely renovate and expand approximately 3000 sq. ft of laboratory spaces and some associated support spaces in the FTLB. The scope includes demolition and space reconfiguration, coordinating with NREL for asbestos removal from existing chemical hoods, providing new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment and electrical installations for lighting and equipment.

The laboratory facilities support microbial bioenergetics research within the Biosciences Center that will strategically position Biochemical and Biophysical characterizations in adjacent areas to better coordinate generation of redox enzymes, strains development and the analytical capabilities in a safe manner. 

The work effort also requires removal of casework, chemical hoods (including coordinating removal of asbestos containing hoods) interior walls, HVAC equipment, plumbing, piping, electrical, fire, etc. and reconstructing the laboratory areas included in FTLB 173, 174, 175, 176, 178 and fan coil units in the neighboring office area, including all scope shown on the drawings and in the project specifications.

Important Dates:

9/20/2023 - Intent to Propose Due

10/6/2023 - Technical Questions Due

Please review attachments below for further details.

Other attachments can be found at https://app.box.com/s/83zltcveg4m3g0rje3mrjwotcdghjbhs

Update #1 ·

Construction Services needed at the National Renewable Energy Laboratory (NREL).  This project requires the successful awardee to completely renovate and expand approximately 3000 sq. ft of laboratory spaces and some associated support spaces in the FTLB. The scope includes demolition and space reconfiguration, coordinating with NREL for asbestos removal from existing chemical hoods, providing new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment and electrical installations for lighting and equipment.

The laboratory facilities support microbial bioenergetics research within the Biosciences Center that will strategically position Biochemical and Biophysical characterizations in adjacent areas to better coordinate generation of redox enzymes, strains development and the analytical capabilities in a safe manner. 

The work effort also requires removal of casework, chemical hoods (including coordinating removal of asbestos containing hoods) interior walls, HVAC equipment, plumbing, piping, electrical, fire, etc. and reconstructing the laboratory areas included in FTLB 173, 174, 175, 176, 178 and fan coil units in the neighboring office area, including all scope shown on the drawings and in the project specifications.

Important Dates:

9/20/2023 - Intent to Propose Due

10/6/2023 - Technical Questions Due

Please review attachments below for further details.

Other attachments can be found at https://app.box.com/s/83zltcveg4m3g0rje3mrjwotcdghjbhs

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
Design-Build Services – STM Security Fencing - North Boundary Golden, Colorado 80401, United States · NAICS 238990 Office of Science Total Small Business
Building America Subject Matter Expert Technical Support Golden, Colorado 80401, United States · NAICS 541715 Office of Science No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity