Norton Dam Wire Rope Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140R6024R0010
- Agency
- Bureau of Reclamation Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z2KA Repair Or Alteration Of Dams
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to replace wire ropes and perform rehabilitation work at the Bureau of Reclamation's Norton Dam facility near Norton, Kansas. The scope of work includes removing and replacing wire ropes, removing grease lines, and fully rehabilitating sheave and idler arm assemblies as well as spot repairing coatings on hoisting equipment. Proposals are due by March 4, 2024 and will be evaluated using FAR Part 15 for contracting by negotiation. Interested parties must direct all correspondence to Contracting Specialist Howard Heflin by the specified due dates for questions.
This requirement is set aside for total small businesses with a size standard of $45 million. The NAICS code is 237990 and PSC code is R499. Work must be performed at the Norton Dam spillway from April 1, 2024 to May 31, 2025. Offerors must be registered in SAM and provide tax, UEI, and CAGE codes with their response by the revised due date of March 4, 2024 to be considered for the award, which has an estimated value between $500,000-$1,000,000.
Notice text
3 versions
Update #3 · Latest ·
Norton Dam Wire Rope Replacement - Amendment 0002
See attachment "140R6024R0010 Amend. No. 0002"
Update #2 ·
Norton Dam Wire Rope Replacement - Amendment 0001
See attachment "140R6024R0010 Amend. No. 0001"
Update #1 ·
Norton Dam Wire Rope Replacement
Work associated with this solicitation is to be performed at the Bureau of Reclamation's Norton Dam facility near Norton, Kansas. The Norton Dam spillway is located approximately 4.9 miles southwest of the town of Norton, along Norton County Rd W3 off of Lower Dam Road.
Work performed under these specifications includes the following:
1. Remove and replace wire ropes.
2. Remove grease lines.
3. Fully recoat and rehabilitate sheave assemblies and idler arm assemblies.
4. Fully recoat floatwell covers, weirwell covers, and raised platforms.
5. Spot repair coatings on hoisting equipment.
Method of Procurement - This requirement is solicited as a Request for Proposal using the Federal Acquisition Regulation Part 15 - Contracting by Negotiation.
The solicitation is issued as a Total Small Business Set-Aside.
Point of Contact - The Contracting Specialist for this action is Mr. Howard Heflin. All questions and correspondence concerning this solicitation shall be directed to him via e-mail at hheflin@usbr.gov.
See solicitation attachments for full requirement.
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140R6024R0010_Amd_0002.pdf | ||
| 140R6024R0010_Amend__No__0002_0002.pdf | ||
| 140R6024R0010_Amend__No__0001_0001.pdf | ||
| Sol_140R6024R0010_Amd_0001.pdf | ||
| 140R6024R0010_File_1_of_2_Solicitation.pdf | ||
| Sol_140R6024R0010.pdf | ||
| 140R6024R0010_File_2_of_2_Solicitation.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Norton Dam Wire Rope Replacement | Award Notice | |
| Norton Dam Wire Rope Replacement | Solicitation | |
| Norton Dam Wire Rope Replacement | Special Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity